Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 4, 6, 11, 18

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Text of EOE-006 Attachment 1.xlsx

Extracted from the file

Text of EOE-011_final.pdf

Extracted from the file · 1 page · 1,337 characters

Text of EOE-018_final.pdf

Extracted from the file · 2 pages · 4,018 characters

  1. Page 1

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-018 Attachment 1 Page 1 of 1 The Connecticut Light and Power Company Storm Reserve Customer Contributions Amortization Description Docket No(s). 13-03-23 / 14-05-06 Deferred Storm Cost Reserve Deferred Storm Insurance Reserve 13-03-23 / 14-05-06 Deferred Return on Storm Insurance Reserve 13-03-23 / 14-05-06 Deferred Storm Cost Reserve 14-05-06 Deferred Storm Cost Reserve 17-10-46 Deferred Storm Cost Reserve 17-10-46 Deferred Storm Cost Reserve 18-11-12 Total Amortizations Included in Base Distribution Rates: Rate Period 5/1/2023 5/1/2024 4/30/2024 4/30/2025 $ 4,465 $ 4,465 971 971 35 35 3,976 3,976 18,625 18,625 2,940 2,940 23,504 23,504 $ 54,516 $ 54,516 Total Storm Amortizations in Rates (From Above): Amortization of Remaining 17-10-46 Storm Costs: Amortization of Remaining 18-11-12 Storm Costs: Net Remaining Amortizations Applied to Storm Reserve: $ Base Rate Catstrophic Storm Reserve Recovery: Base Rate Pre-Staging Reserve Recovery: Total Storm Reserve Recovery: $ Monthly Customer Contribution: Note: Amounts shown above may not add due to rounding. 54,516 $ 2,940 23,504 28,072 $ 54,516 23,504 31,012 $ 3,000 $ 3,000 34,072 $ 3,000 3,000 37,012 $ 2,839 $ 3,084 $

Text of EOE-018 Attachment 1.xlsx

Extracted from the file

As listed on the current system

Question(s) Answered 4, 6, 11, 18 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)