Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 4, 6, 11, 18

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Text of EOE-006 Attachment 1.xlsx

Extracted from the file

Text of EOE-011_final.pdf

Extracted from the file · 1 page · 1,337 characters

Text of EOE-018_final.pdf

Extracted from the file · 2 pages · 4,018 characters

Text of EOE-018 Attachment 1.pdf

Extracted from the file · 1 page · 1,436 characters

[Sheet: Sheet1] 1 | The Connecticut Light and Power Company 2 | d/b/a Eversource Energy 3 | Docket No. 26-05-10 4 | Set EOE-01 5 | Date Issued July 31, 2026 6 | EOE-018 Attachment 1 7 | Page 1 of 1 8 9 | The Connecticut Light and Power Company Storm Reserve 10 | Customer Contributions 11 12 13 | Rate Period 14 | Amortization Description | Docket No(s). | 5/1/2023 - 4/30/2024 | 5/1/2024 - 4/30/2025 15 | Deferred Storm Cost Reserve | 13-03-23 / 14-05-06 | 4465 | 4465 16 | Deferred Storm Insurance Reserve | 13-03-23 / 14-05-06 | 971 | 971 17 | Deferred Return on Storm Insurance Reserve | 13-03-23 / 14-05-06 | 35 | 35 18 | Deferred Storm Cost Reserve | 14-05-06 | 3976 | 3976 19 | Deferred Storm Cost Reserve | 17-10-46 | 18625 | 18625 20 | Deferred Storm Cost Reserve | 17-10-46 | 2940 | 2940 21 | Deferred Storm Cost Reserve | 18-11-12 | 23504 | 23504 22 | Total Amortizations Included in Base Distribution Rates: | 54516 | 54516 23 24 25 | Total Storm Amortizations in Rates (From Above): | 54516 | 54516 26 | Amortization of Remaining 17-10-46 Storm Costs: | 2940 | 0 27 | Amortization of Remaining 18-11-12 Storm Costs: | 23504 | 23504 28 | Net Remaining Amortizations Applied to Storm Reserve: | 28072 | 31012 29 30 | Base Rate Catstrophic Storm Reserve Recovery: | 3000 | 3000 31 | Base Rate Pre-Staging Reserve Recovery: | 3000 | 3000 32 | Total Storm Reserve Recovery: | 34072 | 37012 33 34 | Monthly Customer Contribution: | 2839.3333333333335 | 3084.3333333333335 35 36 37 38 39 40 | Note: Amounts shown above may not add due to rounding.

As listed on the current system

Question(s) Answered 4, 6, 11, 18 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)