  1. Page 36 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 36 of 65 Emergency Response Plan c. Transmission Branch Director The Transmission Branch Director coordinates and manages the damage assessment and restoration activities associated with the Transmission System during an emergency event. The Transmission Branch manages field restoration personnel including coordination and communications with the System Operator and the Operations Branch Directors. d. Substation and Community Task Force Branch Director Based in the ICC or a Regional EOC and reporting to the Operations Section Chief, the Substation and Community Task Force Branch Director has the overall responsibility to support the safe and reliable operation and restoration of the substations and communications equipment; oversees the assembling of the Community Task Force, which consists of substation and other electric operations employees who are deployed to communities that have received significant damage during an emergency event to assist in both the opening of major roadways and the restoration of specific critical facilities. e. Operations Group Manager The Operations Group Manager has direct management responsibilities and oversight of the Restoration Management Teams (RMTs) assigned to the EOC. Manages (pre-activation, during activation, and post-activation) the overall readiness and operation of the assigned RMTs, including coordination and communications with the Community Liaison Unit. Responsible for ensuring that all communications and restoration processes are being implemented as consistent with the ERP. Ensures equipment is set up and operational, shift schedules for all RMT resources are developed, and the process is operating efficiently. Ensures vegetation management issues are coordinated with RMTs. In partnership with the Community Liaison Unit Leader, ensures that community priorities are being addressed and that the RMTs are coordinating and prioritizing with municipal restoration efforts accordingly. f. RMT Operations Coordinator Located in an RMT and reporting to the Operations Branch Director, the Operations Coordinator is responsible for implementing and overseeing the tactical restoration processes in coordination with field supervision. To accomplish this, the Operations Coordinator works closely with the Planning Branch Director, the Logistics Branch Director, and the Community Liaison Unit Leader to ensure the RMTs’ restoration goals and objectives are met and that the restoration crews and the IMT organization’s situational awareness is maintained up to date during the restoration process. g. RMT System Operator The System Operator prepares switching orders to support a restoration effort for a designated geographic area. As part of an RMT, they model the OMS to match the actual distribution system configuration related to switching evolutions, and enter and update information in the OMS, working closely with the Operations Coordinator and Modeler. They prepare and issue switching orders and clearances unless controllership has been transferred to the field. h. RMT Modeler The RMT Modeler works collaboratively as part of the RMT with the Operations Coordinator and System Operator to identify call patterns in the OMS to validate and confirm outage locations. Using data modeling techniques, Modelers determine what is happening on the system within their assigned zone, and consolidate events in the OMS to accurately reflect conditions in the field. The Modeler keeps the OMS up to date, including the model, ETRs and event status – enroute, ETA, onsite, or complete. EP-CTE-PLN-2000 36 of 65 Rev 2
  2. Page 37 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 37 of 65 Emergency Response Plan i. Vegetation Management Unit Leader The Vegetation Management Unit Leader is responsible for management and coordination of the vegetation management crews in their assigned region, working closely with the RMTs to ensure safe and efficient clearing of downed branches and trees. The Vegetation Management Unit Leader oversees contractor personnel performing tree cutting and clearing during emergency conditions to aid line crews in the restoration of service to customers. j. Wire Guard and Services Branch Director The Wire Guard and Services Branch Director manages and oversees the Wire Guard process by ensuring a Wire Guard is sent to stand by potential electrical hazards. Also manages and coordinates the deployment of Service Crews focused on the restoration of residential electrical services. 3.3.3 Fire/Police Safety (FPS) Call Responses Life Safety calls (E-911 calls) are the highest response priority. They can present significant challenges during emergency events due to their increased volume, availability of resources, and access to certain locations due to downed trees and facilities. It is important to document the receipt of these calls and establish a priority to respond to them. Consistent and efficient handling and processing of FPS calls and events allow RMTs to assess trouble areas and properly prioritize and plan required restoration activities and to quickly dispatch repair crews when reports are received indicating public safety can be threatened. Standardization of this process across all RMTs also allows the use of personnel from outside the area to efficiently assist or replace local personnel. FPS priorities are as follows: o o o Priority 1: A life threatening situation Priority 2: Hindering emergency operations such as firefighting or rescue operations but NOT life threatening Priority 3: Any electrical hazard such as downed wires, with no immediate threat to life or property The priority of an FPS call is determined by the municipal fire, police, or emergency operator placing the call. The RMT responds to FPS calls as they are received. 3.4 Planning Section The Planning Section evaluates all available information and, working with other Incident Command functions, develops and publishes an IAP. The IAP sets forth, among other items, the objectives and deliverables for each operational period. The Planning Section incorporates the guiding principles set forth in this ERP into the development of the IAP to ensure that the needs and expectations of customers are met. 3.4.1 Planning Section Organizational Structure The Planning Section is directed by the Planning Section Chief, who is a member of the General Staff. In a larger emergency event, there is a Planning Branch Director in each activated Regional EOC to coordinate with the Operations Branch Director, Logistics Branch Director, and any RMT Operations Coordinators. Independent of the scope of the emergency event, the Planning Section Chief has responsibility and accountability for all planning functions in preparation for and in response to an emergency event. To assist with these functions, the Planning Section Chief can activate additional job positions. An example of a Planning Section organization is provided in Figure 4. EP-CTE-PLN-2000 37 of 65 Rev 2
  3. Page 38 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 38 of 65 Emergency Response Plan Figure 4 - Example Planning Section IMT Structure Planning Section Chief Planning Branch Director Transmission Planning Branch Director Forecasting Planning Unit Leader Strategic Planning & ERT Specialist 3.4.2 Planning Branch Director Tactical Situation Unit Leader Event Statitician Planning Branch Director Resource Tracking Planning Unit Leader Tactical Documentation Specialist Planning Section Roles and Responsibilities The Planning Section is responsible for maintaining, gathering, and disseminating information on the current and forecasted situation and the status of resources assigned to the incident, as well as preparing plans and maps a. Planning Section Chief The Planning Section Chief, in collaboration with the IC and other Command and General Staff personnel, is responsible for developing and recommending the overall restoration strategy, including ETRs based on current resources available, damage assessment data, and current and forecasted weather conditions. Oversees the execution of the damage assessment process and the development of situation and resource status information. Collaborates with the Operations and Logistics Section Chiefs to determine resource requirements, allots and tracks all emergency event resources once activated or checked in, and develops each operational period’s IAP. Ensures the OMS ETRs and Global Restoration Messaging are maintained, up to date and accurate, and ensures reporting to regulators is completed as required. b. Planning Branch Director – Forecasting The Planning Branch Director – Forecasting oversees the collection, analysis, estimating and reporting of pre- and post-impact system data to provide situational awareness to the Planning Section Chief, IC, and other members of the IMT. The Planning Branch Director – Forecasting is responsible for ensuring the timely updating of models and dashboards and for analyzing, determining, and maintaining the current ETR for the overall state, regions, RMTs, and towns in the IMT’s area of responsibility. Along with determining ETRs, collaborates with the Planning Branch Director – Tactical on priorities and with the Communications Officer to develop and publish the Global Restoration Messages, once they are approved. EP-CTE-PLN-2000 38 of 65 Rev 2
  4. Page 39 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 39 of 65 Emergency Response Plan c. Planning Branch Director – Tactical The Planning Branch Director – Tactical is responsible for overseeing the Region’s Rapid and Detailed damage assessment processes. The Planning Branch Director – Tactical verifies and collaborates with the Operations Branch Director to ensure that the resources that have been allotted are distributed appropriately among the RMTs and develops high level tactical plans to be implemented. As the restoration event nears completion, is responsible for developing a strategy for releasing external resources, internal resources, and support staff, in the most efficient and cost effective manner. d. Planning Branch Director – Transmission The Planning Branch Director - Transmission, in collaboration with the IC and other Command and General Staff personnel, is responsible for developing and recommending the overall transmission system restoration strategy, including ETRs based on resources available, damage assessment data, and current and forecasted weather conditions. Coordinates engineering and technical support needed to support transmission repair activities. e. Planning Branch Director – Resource Tracking The Planning Branch Director – Resource Tracking has overall responsibility for the recording and tracking of all internal and external resources that are part of the emergency response. The Planning Branch Director Resource Tracking oversees the use of the resource tracking database to ensure it is maintaining an accurate account of all resources and their locations, shift schedules, and non-activated employees. The Planning Branch Director – Resource Tracking is responsible for providing reports and situational awareness updates to the Incident Commander and the Command and General Staff. 3.4.3 Incident Action Plan The Planning Section Chief ensures the IAP is completed and regularly updated by gathering input from appropriate organizations including the IC and Command and General Staff throughout the entire incident. Emergency incidents vary in type, complexity, size, and requirements for detailed and written plans. In an initial response for an incident that is readily controlled, a written plan might not be necessary. Larger, more complex incidents require that a formal, documented IAP is developed to coordinate activities. The level of detail required in an IAP also varies according to the size and complexity of the response. For incidents in which an IAP is prepared, the Plan must be accurate and must completely capture the information generated during the planning process. Coordination with the Logistics Section is required to ensure the Plan can be executed. The Plan is prepared and distributed prior to the Operations briefing and a revised Plan is prepared for each Operational Period. An IAP should consider the strategic, reputational, and intangible elements of the incident and include coordination with stakeholders. The Planning Section establishes and publishes the IAP that generally: • • • • • EP-CTE-PLN-2000 Identifies the Operational Period Defines goals for the Operational Period Identifies personnel in key IMT positions Describes weather conditions and forecasts – taking into consideration the impacts that current or future weather could have on the response to the event Communicates a timely and relevant Safety Message to all resources in the Electric Service territory, as provided by the Safety Officer or his/her designee 39 of 65 Rev 2
  5. Page 40 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 40 of 65 Emergency Response Plan 3.4.4 Damage Assessment & Situational Awareness During the response to a significant emergency event, damage assessment is a critical component that drives important response actions, including: acquiring mutual aid resources, procuring additional material supplies, generating ETRs, and effectively choosing a restoration strategy. [CATSWeb 20463] Fundamentally, damage assessment is a core component of the Planning function, and, in conjunction with other relevant information, is used to develop an IAP that is executed by the various functions, including Operations, engaged in the storm response. Specifically, damage assessment determines, among other things, the number and locations of blocked roads, the amount of physical damage caused by an event, including the number and locations of broken poles, the number and locations of damaged transformers and oil spills, the number and locations of wires down, and the number and locations of tree and tree limb damage. This information is critical in developing an IAP and deciding to acquire mutual aid or deploy additional support personnel. Furthermore, this information is helpful to inform the Logistics Section of potential needs (such as, materials and equipment) and to drive specific emergency response processes (for example, wires down). Damage Assessment Patrollers are used to assess the condition of the distribution system to identify possible hazards and equipment damage. Damage information is communicated from the field in the most efficient and effective manner using electronic means, if available, or paper assessment forms. The damage assessment process uses three types of damage assessments: • • • 3.4.5 Rapid Survey - This assessment utilizes a representative sampling of pre-selected circuits on the Distribution System, following a major emergency event, which can be extrapolated to provide an overall magnitude of damage, including an approximation of the number of events, broken poles, sections of wire down, and damaged oil filled equipment. Detailed Survey - There are two methods of performing the comprehensive survey as determined by the strategy developed by the Planning Section Chief: o Circuit Based - This is an assessment of an entire circuit where multiple events have been reported to determine the extent of damage and to confirm the actual number of events. o Event Based - This is an assessment of events at reported locations to determine the extent of damage. Post-Event Survey - This assessment is performed after-restoration but prior to releasing resources and is intended to identify any remaining work to restore the system to its normal configuration. It also includes the identification and documentation of any remaining Electric System debris or other hazards that require attention and services where temporary repairs were made to restore power. Work Estimating and Prioritization The Planning Unit Leader - Strategic uses information that is provided by the Damage Assessment teams to estimate the amount of work that is necessary to restore service to customers. This is done by allocating proxy man hour requirements to each trouble order that is evaluated by the damage assessment process. This information is aggregated to determine the overall resource requirement to restore service to customers. This information helps determine the global ETR and also whether additional resources are required to support the restoration process. In addition, trouble orders are prioritized based on pre-established priority guidelines, which help guide the order in which trouble orders and circuits are responded to and restored. This information is presented to Operations personnel to guide their allocation of emergency response resources. EP-CTE-PLN-2000 40 of 65 Rev 2
  6. Page 41 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 41 of 65 Emergency Response Plan 3.4.6 Estimated Times to Restoration and Restoration Projections Estimated Time to Restoration is a critical piece of information throughout the course of an emergency event. The Company uses algorithms based on available objective and observational inputs to develop Global and/or Town ETRs. Early in an event, data is less available than in the later stages, thus, as the restoration progresses, more accurate estimates can be derived. Regional Planning Branch Directors work closely with the Regional Operations Branch Directors to relay important information necessary to maximize the accuracy of ETRs reported to customers and are strategically placed in the EOCs to relay important information necessary to maximize accuracy. a. ETR Development Early in the process, the Planning Section Chief oversees the development of a planning estimate that is used to guide the Logistics team in securing resources, determining the maximum number of travel days, and determining the number of mutual aid crews needed. Once the storm has passed and the number of customers interrupted has peaked, the Planning Section develops restoration projections based on: o o o o o The number of trouble locations The relative geographic scope of those locations The condition of the transmission system The number of circuit breakers and reclosers affected The number of service-related trouble spots Trouble locations involving breakers and reclosers can have a multiplying effect on the restoration projection calculations, because these typically have additional trouble locations nested downstream. The number of service-related trouble spots also has an effect on the type of crews needed. Varying types of damage are also considered in determining the restoration projection and time to restore each trouble spot. Lightning, wind, ice, make-safe issues, and transmission involvement all have an effect on and are considered in the calculations. Another important parameter is the number of crews that are confirmed to be available, working in conjunction with the Logistics Section Chief. Considering all these parameters together helps the Company develop reasonably accurate global ETRs. Restoration projections are intended to be estimates that provide a guide for restoration planning and communications with stakeholders. The OMS System is used to create and manage both Global and Town level ETRs. Event specific ETRs are the responsibility of the Operations Section Chief and RMT Operations Coordinator and are normally created when crews are dispatched to the associated work location. b. ETR Monitoring The Planning Section Chief continuously gathers data, monitors conditions, and recalculates the global ETRs to achieve the best possible accuracy. c. Communication of ETRs Global ETRs are approved by the IC, in consultation with the Company President, prior to publication. The OMS System is used to create and manage Global level messages and Town level messages and projections. The system also has the ability to view the status of Event level messages and projections; event level messages are created and managed through the OMS. EP-CTE-PLN-2000 41 of 65 Rev 2
  7. Page 42 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 42 of 65 Emergency Response Plan For event specific ETRs, customers receive the message and projection that is available at the most detailed level. The information is provided to the customer from the Integrated Voice Response (IVR) system, company website, and Customer Care Center representatives. If there is an event-level message and projection, the customer is provided with this ETR. If an event-level message and projection are not available, then the customer receives the Town message and projection. Finally, if neither the Event Level nor Town level ETR is available, the customer receives the Global level ETR message. 3.5 Logistics Section The Logistics Section, led by the Logistics Section Chief, supports and coordinates with other Command Staff and the IC to ensure that all organizations responding to an event are adequately supported. During a significant event, the Logistics Section is responsible for a variety of tasks, including, but not limited to: • Acquiring personnel, including crew resources • Establishing and maintaining Satellite locations and Staging Areas • Supplying and replenishing necessary materials • Feeding, lodging, and ensuring the welfare of Company and restoration personnel • Fueling and maintaining vehicles and equipment • Supplying vehicles and specialty equipment needed to support the restoration • IT and Communications support services 3.5.1 Logistics Section Structure The Logistics Section is directed by the Logistics Section Chief who is a member of the General Staff and reports directly to the IC. In a major event, the Logistics section is composed of three branches: • • • Services (Food & Lodging, Materials Logistics, Fleet Services, IT/Telecommunications, Staging Areas, Property Management, Security, Environmental, Procurement) Resource Acquisition (Mutual Aid, Contractor, Vegetation Management, Patrollers, Wire Guards) Support (on-site coordination at the Regional EOCs and designated AWCs/Satellites, as appropriate) The Logistics Section Chief operates out of the ICC and ensures coordination with all Branch Directors throughout the preparation for, response to, and recovery from the event. An example of the Logistics Section organization is provided below in Figure 5. EP-CTE-PLN-2000 42 of 65 Rev 2
  8. Page 43 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 43 of 65 Emergency Response Plan Figure 5 - Example Logistics Section IMT Structure Logistics Section Chief Logistics Services Branch Director Food & Lodging Services Unit Leader Food & Lodging Coordinator Logistics Support Branch Director Material Logistics Services Unit Leader Fleet Services Unit Leader Material Logistics Unit Fleet Services Unit IT/ Telecom Services Unit Leader Environmental Services Unit Leader IT Unit Telecom Unit Security Services Unit Leader Logistics Resource Acquisition Branch Director Staging Area Services Unit Leader Staging Area Supervisor Staging Area Specialist Environmental Unit Property Management Services Unit Leader Security Unit Procurement Services Unit Leader Property Management Unit Real Estate Unit Procurement Unit 3.5.2 Logistics Section Roles and Responsibilities Logistics activities are organized to efficiently assign critical services and resources when and where they are needed. In a higher Level event, there are three Logistics Sections: Services, Resource Acquisition, and Support. The Logistics Services Branch and Resource Acquisition Branch provide the various supporting services and resources throughout the IMT organization, and the Logistics Support Branch Directors and Unit Leaders (assigned to Regional EOCs) to ensure their Operations Section and Planning Section counterparts receive all the logistics services they need to effectively and efficiently carry out their response activities and support the IAP. EP-CTE-PLN-2000 43 of 65 Rev 2
  9. Page 44 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 44 of 65 Emergency Response Plan a. Logistics Section Chief The Logistics Section Chief ensures that all incident resources needed to support the strategic and tactical execution of incident objectives are made available. The Logistics Section Chief oversees the Logistics Section, which is organized into three Branches: Services, Support, and Resource Acquisition. Duties include: o o o o o o o o o Identify anticipated and known internal and external resource requirements Ensure all requests for resources, support, supplies, and equipment are assigned and tracked Ensure all external resources are tracked until they are checked-in, if the ERSG is not activated Ensure adequate logistics support for the EOCs and RMTs Obtain periodic updates from the Logistics Branch Directors on the status of resource requests and other logistics requirements Periodically update the Command and General Staff on actions and progress Order or request additional resources as needed Ensure that the positions within the Logistics Section execute their specific duties and responsibilities Support the development of a demobilization plan and implement it to return to normal business operations Logistics Services Branch An emergency event requires service support beyond that provided for day-to-day operations. The Logistics Section Services Branch oversees the activation and coordination of the following service units. b. Logistics Services Branch Director The Logistics Services Branch Director has the overall responsibility for the preparedness, planning, and coordination of a variety of logistical services including facilities, food and lodging, environmental response, procurement, transportation, materials, IT/ Telecom, and staging areas. The Logistics Services Branch Director oversees and supports the Services Branch Unit Leaders. c. Food and Lodging Services Unit Recovery efforts can continue around the clock for several days. It is therefore necessary to provide for proper rest and nourishment of personnel assisting in restoring the Electric System. The Food and Lodging Unit provides all coordinating activities for food services and housing and related transportation and parking services as needed. Food and Lodging Unit members are under the direction of the Food and Lodging Unit Leader within the Logistics Section when the IMT organization is established at the ICC. d. Material Logistics Services Unit Repair of damage requires line crews to have ready access to and availability of parts and materials. Material Logistics supports restoration by ensuring that appropriate warehouse and storeroom locations are staffed in order to supply the materials needed by personnel performing restoration activities. Material Logistics also has responsibility for material salvage and satellite and staging area location clean-up operations. EP-CTE-PLN-2000 44 of 65 Rev 2
  10. Page 45 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 2 Page 45 of 65 Emergency Response Plan e. Information Technology (IT)/Telecom Services Unit Many of the tools used by the IMT Organization to manage the emergency restoration process rely on computer hardware, databases, and software applications as well as communications equipment and infrastructure. The IT team ensures correct functioning of computer hardware, databases, and software applications used to produce this data. IT personnel support the Incident Command Staff and recovery efforts by setting up and maintaining computer equipment and providing application assistance throughout the restoration. The Telecommunications team supports telecommunications requirements during restoration efforts, including maintaining equipment such as radios, satellite phones, paging systems, and microwave and fiber optic systems used to communicate this data. These systems are critical to the Company’s ability to promptly and safely manage the restoration of customer outages. Telecommunications Services personnel ensure proper communications by maintaining, repairing, and modifying various types of telecommunication equipment to facilitate communications between IMT personnel. f. Security Services Unit Security is paramount during emergency incidents where there is widespread physical damage. It is especially important when significant resources are brought to Connecticut to help restore service to customers. The Security Services Unit Leader is responsible for the oversight of all issues involving security. The Security Services Unit ensures that adequate security services are provided for on-scene response operations if required. Some examples would include staffing and positioning security at required locations, obtaining supplemental security contractors, investigating security issues and suspicious activities at company facilities, providing security in volatile situations, coordinating with state and local law enforcement as necessary, and ensuring all security-related incidents are properly reported. g. Fleet Services Unit Fueling and maintenance are coordinated by the Fleet Services Unit Leader. Fleet Services personnel perform required actions to support vehicles and equipment used in restoration activities on electric lines and equipment, including the coordination of refueling and traffic control. h. Environmental Services Unit The Environmental Services Unit is responsible for ensuring all applicable environmental rules and policies are understood and complied with during the restoration effort. The Environmental Services Unit Leader oversees and ensures compliance with all environmental regulations, prepares and submits all required regulatory reports, maintains open communications with regulatory bodies to keep them informed of any significant spills or other environmental issues resulting from the event damage, and coordinates associated mitigation efforts with the Operations, Planning, and Logistics Sections. i. Property Management Services Unit Organizations directing recovery efforts do so from various buildings and facilities. These buildings require support to maintain basic habitability. The Property Management Services Unit is comprised of primary facilities staff and is responsible for preparation, operation, and management of the facilities to support the response and recovery effort, including staging areas. The Property Management Services Unit supports any and all facility-related needs throughout the duration of the event. Facilities department personnel assist in emergency restoration activities by providing necessary support for such items as building maintenance, janitorial services, maintenance, and operation of HVAC systems, and maintenance and operation of emergency power generators. EP-CTE-PLN-2000 45 of 65 Rev 2

Text of EOE-010 Attachment 3.pdf

Extracted from the file · 70 pages · 208,634 characters

Text of EOE-010 Attachment 4.pdf

Extracted from the file · 369 pages · 809,244 characters

Text of EOE-010 Attachment 5.pdf

Extracted from the file · 108 pages · 301,258 characters

As listed on the current system

Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)