Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 101, 110, 113, 114, 115

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-101 Page 1 of 1 Date Filed: August 14, 2026 Witness: Jessica B. Cain, Jason Tharpe and Joseph D. Rubino Request from: Office of Education, Outreach, and Enforcement Question: (METER READING) Exhibit CLP-REVREQ-2, Schedule H-2.0(C). Since the prior rate case (through present), indicate the percentage of customer meters that have not been read for the following time periods: a. 1 to 3 months; b. 4 to 6 months; c. 7 to 11 months; d. 12 months or greater. Response: Please refer to EOE-101, Attachment 1, for a count of estimated reads from January 2018 to June 2026. When an actual meter read is not available, usage is estimated for billing.

Text of EOE-113_final.pdf

Extracted from the file

Text of EOE-114_final.pdf

Extracted from the file

Text of EOE-114 Attachment 1.pdf

Extracted from the file

Text of EOE-114 Attachment 1.xlsx

Extracted from the file

Text of EOE-115_final.pdf

Extracted from the file · 2 pages · 3,537 characters

Text of EOE-115 Attachment 1.pdf

Extracted from the file · 9 pages · 15,689 characters

As listed on the current system

Question(s) Answered 101, 110, 113, 114, 115 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)