Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 9, 10

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy7 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files7

Text of EOE-010 Attachment 2.pdf

Extracted from the file · 65 pages · 201,477 characters

Text of EOE-010 Attachment 3.pdf

Extracted from the file · 70 pages · 208,634 characters

  1. Page 141 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 141 of 369 EP-ALL-EPJD-CG-14, Rev. 0 All Hazards Emergency Response Program Effective Date: 7/13/2016 Approval Date: 7/13/2016 Message Data Lead EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Message Data Lead B. Reports To: Message Delivery Manager 1. Direct Reports: MDEM Staff (as required) C. Position Duties and Responsibilities: During emergency operations, the Message Data Lead is responsible for providing the lists of customers to the Message Delivery Lead in a format that aligns with the required message delivery systems. D. Pre-Event Preparations: • Remain within two hours of your emergency response reporting location. • Ensure your emergency team has your contact information • Remain fit for duty as described in Eversource Fitness for Work Policy. • Make the necessary provisions for the challenges that your family could face during prolonged outages to ensure their security and safety while you are committed to the emergency response duties. • Notify your immediate supervisor of your emergency job position activation. Keep them informed of changes to your work schedule. • When directed by the Manager research the customer databases to create the requested customer lists for the message campaigns. • Monitor the performance of the CG emergency response organization and provide reporting for internal stakeholders. • Execute the Message Delivery Plan. • Provide the requested customer lists to key internal stakeholders. • Provide support for on demand data requests (such as, customers calling > 5 times, list of medical facilities, list of waste water treatment plants). • Ensure data files are in the correct format and align with the specific campaign requirements. • Coordinate with appropriate IT resources as required to obtain customer lists that are not available through internal CG processes. • Remain fit for duty as described in Eversource Fitness for Work Policy. • Direct relevant documentation to the Customer Group Curriculum Advisory Committee (CAC) for disposition. • Participate in After Action Review(s) as required. E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: Personal Protective Equipment (PPE): • N/A Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  2. Page 142 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 142 of 369 H. Position Work Location: Virtual I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-CG-14 Eversource N:\ Drive Rev 0 Page 2 of 2
  3. Page 143 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 143 of 369 EP-ALL-EPJD-CG-15, Rev. 0 All Hazards Emergency Response Program Effective Date: 7/13/2016 Approval Date: 7/13/2016 Event Reporting Lead EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Event Reporting Lead B. Reports To: Event Management Director 1. Direct Reports: MDEM Staff (as required) C. Position Duties and Responsibilities: During emergency operations, the Event Reporting Lead is responsible for compiling, analyzing, and issuing statistical and operational reports concerning the restoration and for delivering those reports to senior management by the appropriate systems and methods. D. Pre-Event Preparations: • Remain within two hours of your emergency response reporting location • Ensure your emergency team has your contact information • Remain fit for duty as described in Eversource Fitness for Work Policy • Make the necessary provisions for the challenges that your family could face during prolonged outages to ensure their security and safety while you are committed to the emergency response duties • Ensure all reporting Information Contacts are available and ready to initiate reporting process • Ensure reporting templates are updated and ready for use • Notify your immediate supervisor of your emergency job position activation. Keep them informed of changes to your work schedule • Oversee timely submission of statistical data from the information analysts • Participate in Customer Care storm briefings • Participate in review of statistical data to ensure accuracy • Ensure that data is submitted in a timely fashion by information analysts • Ensure that reports are issued to meet the operational needs of the Customer Group • As time permits, begin drafting overall Executive Summary of storm event, to be published after event ends • Provide general oversight of the event reporting process • Communicate with the information contacts as necessary • Remain fit for duty as described in Eversource Fitness for Work Policy • Direct relevant documentation to the Customer Group Curriculum Advisory Committee (CAC) for disposition • Participate in After Action Review(s) as required E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  4. Page 144 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 144 of 369 Personal Protective Equipment (PPE): G. Equipment Required: • N/A Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Virtual I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-CG-15 Eversource N:\ Drive Rev 0 Page 2 of 2
  5. Page 145 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 145 of 369 EP-ALL-EPJD-CG-16, Rev. 0 All Hazards Emergency Response Program Effective Date: 7/13/2016 Approval Date: 7/13/2016 Telephony Systems Lead EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Telephony Systems Lead B. Reports To: Message Delivery Manager 1. Direct Reports: None C. Position Duties and Responsibilities: During emergency operations, the Telephony Systems Support personnel are responsible for maintaining and modifying the telephony systems during all phases of the emergency event. D. Pre-Event Preparations: • Remain within two hours of your emergency response reporting location • Ensure your emergency team has your contact information • Remain fit for duty as described in Eversource Fitness for Work Policy • Make the necessary provisions for the challenges that your family could face during prolonged outages to ensure their security and safety while you are committed to the emergency response duties • Notify your immediate supervisor of your emergency job position activation. Keep them informed of changes to your work schedule • Monitor, maintain and repair the telephony systems as required • Make adjustments to the telephony system messages as the emergency event requires or as requested by the Manager • Ensure the Manager is aware of telephony system status and provide status information reports and documentation as requested • Remain fit for duty as described in Eversource Fitness for Work Policy • Direct relevant documentation to the Customer Group Curriculum Advisory Committee (CAC) for disposition • Participate in After Action Review(s) as required E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Virtual I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  6. Page 146 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 146 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-CG-16 Eversource N:\ Drive Rev 0 Page 2 of 2
  7. Page 147 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 147 of 369 EP-ALL-EPJD-CG-17, Rev. 0 All Hazards Emergency Response Program Effective Date: 7/13/2016 Approval Date: 7/13/2016 CC Rep (Call Center Representative) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: CC Rep (Call Center Representative) B. Reports To: Call Center Lead 1. Direct Reports: None C. Position Duties and Responsibilities: Performs normal role D. Pre-Event Preparations: • Remain within two hours of your emergency response reporting location • Ensure your emergency team has your contact information • Remain fit for duty as described in Eversource Fitness for Work Policy • Make the necessary provisions for the challenges that your family could face during prolonged outages to ensure their security and safety while you are committed to the emergency response duties • Notify your immediate supervisor of your emergency job position activation. Keep them informed of changes to your work schedule • Perform normal role or job description • Communicate with the Call Center Lead(s) • Remain fit for duty as described in Eversource Fitness for Work Policy • Direct relevant documentation to the Customer Group Curriculum Advisory Committee (CAC) for disposition • Participate in After Action Review(s) as required E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Call Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  8. Page 148 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 148 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-CG-17 Eversource N:\ Drive Rev 0 Page 2 of 2
  9. Page 149 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 149 of 369 EP-ALL-EPJD-CG-18, Rev. 0 All Hazards Emergency Response Program Effective Date: 7/13/2016 Approval Date: 7/13/2016 CC Staff EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: CC Staff B. Reports To: Call Center Management Team 1. Direct Reports: None C. Position Duties and Responsibilities: Performs emergency duties assigned by the Call Center Management Team D. Pre-Event Preparations: • Remain within two hours of your emergency response reporting location • Ensure your emergency team has your contact information • Remain fit for duty as described in Eversource Fitness for Work Policy • Make the necessary provisions for the challenges that your family could face during prolonged outages to ensure their security and safety while you are committed to the emergency response duties • Notify your immediate supervisor of your emergency job position activation. Keep them informed of changes to your work schedule • Perform emergency duties as assigned by a member of the Call Center Management Team (for example, assist the Concierge Call Lead with perform various outreach calls to customers) • Remain fit for duty as described in Eversource Fitness for Work Policy • Direct relevant documentation to the Customer Group Curriculum Advisory Committee (CAC) for disposition. • Participate in After Action Review(s) as required E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Call Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  10. Page 150 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 150 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-CG-18 Eversource N:\ Drive Rev 0 Page 2 of 2

Text of EOE-010 Attachment 5.pdf

Extracted from the file · 108 pages · 301,258 characters

As listed on the current system

Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)