Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 9, 10

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy7 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files7

Text of EOE-010 Attachment 2.pdf

Extracted from the file · 65 pages · 201,477 characters

Text of EOE-010 Attachment 3.pdf

Extracted from the file · 70 pages · 208,634 characters

  1. Page 180 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 180 of 369 All Hazards Emergency Response Program Effective Date: 08/25/2020 EP-ALL-EPJD-LOG-03 , Rev 1 Approval Date: 12/16/2016 Food & Lodging Services Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Food & Lodging Services Unit Leader B. Reports To: Logistics Services Branch Director 1. Direct Reports: Food & Lodging Coordinator C. Position Duties and Responsibilities: Coordinates and manages the functions and staffing of the Food and Lodging Unit, including providing food and lodging for all internal and external crews and staff. Ensures that the positions within the unit execute their specific duties and responsibilities. D. Pre-Event Preparations: • Coordinate with Base Logistics if activated • Activate Food and Lodging Services Unit personnel, as needed • Ensure caterers are notified of an impending event with an estimated magnitude of the duration for inventory and scheduling needs • Ensure contact information is updated for all contracted hotels and caterers • Coordinate with Logistics Section staff, regarding projected internal and external staffing who might require food and lodging • Ensure Food & Lodging Coordinators reserve hotel rooms based on projected needs, as appropriate • Participate in Logistics briefings • Coordinate laundry services as needed • Ensure all internal and external crews and staff are lodged and fed effectively and efficiently, in support of safe and efficient restoration activities • Ensure hotel reservations are released as soon as needs diminish • Ensure caterers are notified of estimated magnitude duration for inventory and scheduling needs • Provide timely reports to Branch Director • Participate in Logistics briefings • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Coordinate invoice reconciliation and approval E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC or office Equipment and Supplies: • Phone • Computer Personal: • H. Position Work Location: Appropriate clothing for weather conditions and any personal needs for multiple days away from home ICC Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  2. Page 181 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 181 of 369 I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • Food and Lodging Process and Tool Training (EP-503) Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-LOG-03 • Food and Lodging Tool Refresher Training (EP-503R) • Eversource N:\ Drive • ARCOS Production Rev 1 Page 2 of 2
  3. Page 182 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 182 of 369 EP-ALL-EPJD-LOG-04, Rev. 1 All Hazards Emergency Response Program Effective Date: 08/25/2020 Approval Date: 12/16/2016 Food & Lodging Coordinator EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Food & Lodging Coordinator B. Reports To: Food & Lodging Services Unit Leader 1. Direct Reports: None C. Position Duties and Responsibilities: Coordinates and executes the functions of the Food and Lodging Unit, including contacting, acquiring, assigning, tracking, and communicating food and lodging services for all internal and external crews and staff. D. Pre-Event Preparations: • Coordinate with Logistics contractor if activated • Support the activation of the Food and Lodging Unit • Coordinate with Logistics Section staff, regarding projected need for food and lodging services for internal and external staffing and crews Contact hotels (to determine availability of rooms) and caterers (to communicate estimated need based on magnitude and duration) and update resource tracking tool • Book rooms based on projected needs and update resource tracking tool • Participate in Logistics briefings • Determine and update room availability, book, assign, reassign, track, cancel, and communicate crew and staff lodging within the resource tracking tool • Coordinate meals (numbers) and scheduling with caterers and logistics support and update resource tracking tool • Communicate logistics plan to the Unit Leader • Provide timely reports to Unit Leader • Participate in Logistics briefing • Direct relevant documentation to the Planning Section for disposition • Participate in an After Action Review(s) • Coordinate invoice reconciliation and approval E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  4. Page 183 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 183 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Initial Training • Food and Lodging Process and Tool Training (EP-503) Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-LOG-04 • Food and Lodging Tool Refresher Training (EP-503R) • Eversource N:\ Drive • ARCOS Production Rev 1 Page 2 of 2
  5. Page 184 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 184 of 369 EP-ALL-EPJD-LOG-06 , Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Material Logistics Services Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Material Logistics Services Unit Leader B. Reports To: Logistics Services Branch Director 1. Direct Reports: Material Logistics Unit C. Position Duties and Responsibilities: Coordinates materials logistics activities in support of the emergency, including receiving, storing and issuing inventory and non-inventory materials, equipment, and supplies. Ensures that the positions within the Unit execute their specific duties and responsibilities consistent with EP-ALLANX-1000 F, Supply Chain Procurement Annex. D. Pre-Event Preparations: • Coordinate Material Logistics Unit activation with the Director, Material Logistics • Coordinate, within the Logistics Services Branch, anticipated openings of staging areas • Project/ensure adequate materials based on predicted/actual conditions and coordinate with Procurement as needed • Ensure pre-staged material is deployed, as needed • Participate in Logistics briefings • Act as the central point of contact for material logistics issues for the IMT • Coordinate material logistics needs with the Logistics Support Unit Leader and Staging Area Services Unit Leader as needed • Project/ensure adequate materials based on predicted/actual conditions • Ensure Food and Lodging requirements have been communicated • Participate in Logistics briefings • Provide timely reports to Branch Director • Notify Director, Material Logistics of company return to normal operations • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A in ICC or office Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  6. Page 185 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 185 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-06 Eversource N:\ Drive Rev 0 Page 2 of 2
  7. Page 186 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 186 of 369 EP-ALL-EPJD-LOG-07, Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Fleet Services Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Fleet Services Unit Leader B. Reports To: Logistics Services Branch Director 1. Direct Reports: Fleet Services Unit C. Position Duties and Responsibilities: Coordinate fleet service issues in support of the emergency, including fleet availability, rental vehicle procurement and assignment, fleet maintenance and repairs, and emote fueling of all fleet and contractor vehicles. Ensures that the positions within the Unit execute their specific duties and responsibilities consistent with Fleet Services Annex. D. Pre-Event Preparations: • Coordinate, within the Logistics Services Branch, anticipated openings of staging areas • Coordinate Fleet Services Unit activation with the Vice President, Operation Services and initiate actions to support expected needs, including: E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: • o Determining the availability of Fleet vehicles o Updating contact information for rental vehicle vendors o Determining projected requirements for fleet and rental vehicles o Determining projected fueling needs and remote fueling locations and notify vendor(s) o Verifying adequate inventory of fleet parts and requesting procurement to fill gaps Coordinate fleet service activities, including: o Procurement and assignment of rental vehicles o Maintenance and repairs of fleet vehicles o Remote fueling activities at Staging Areas, hotels, and so on o Ensuring availability of vehicle maintenance personnel o Ensuring availability of vehicle repair parts o Movement of vehicle maintenance personnel to areas with large fleet concentration • Ensure Food and Lodging requirements have been communicated • Participate in Logistics briefings • Provide timely reports to Logistics Services Branch Director • Notify Vice President, Operation Services of company return to normal operation • Ensure return of rental vehicles • Ensure deactivation of remote fueling contractors • Direct relevant documentation to the Planning Section for disposition. • Participate in After Action Review(s) Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  8. Page 187 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 187 of 369 Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in ICC or office Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-07 Eversource N:\ Drive Rev 0 Page 2 of 2
  9. Page 188 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 188 of 369 EP-ALL-EPJD-LOG-08, Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Staging Area Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Staging Area Unit Leader B. Reports To: Logistics Services Branch Director 1. Direct Reports: Staging Area Supervisors C. Position Duties and Responsibilities: The Staging Area Unit Leader is responsible for organizing, coordinating, and supporting staging areas. D. Pre-Event Preparations: • Collaborate with Logistics Services Branch Director and determine the locations, size, and anticipated functions of staging areas • Request the Property Management Services verify that pre-designated Staging Area agreements are current, and sites are ready for use • If a Logistic Contractor is anticipated to be used to support the Staging Areas, confirm that the Contractor(s) has been notified and activated • Determine resource staffing requirements for the staging areas • Notify/activate Staging Area Supervisors and Specialists • Notify and coordinate Logistics Services Section Unit Leaders needed to support staging area operations. For example, food and lodging, material logistics, security, fleet services, IT/ telecommunications, property management, environmental, and so on • Communicate staging area readiness to the Logistics Services Branch Director • Coordinate staging area needs with the Staging Area Supervisors • Gather information from Logistics Section Branch Director pertaining to the proposed number of crews and vehicles expected to use each Staging Area and their proposed working schedules • Coordinate with the Staging Area Supervisors to determine each staging area’s resource staffing requirements, and estimate activation and deployment response timelines • Ensure the layout and set up of staging area is available and workable and that the staging area can support the desired restoration crew work schedules • Reviews each day’s Incident Action Plan (IAP) for the next operational period and maintain awareness of the numbers and assigned work locations of all crews • Brief Staging Area Supervisor as needed • Conduct daily conference calls with Staging Area Supervisors to gather information about ongoing operations, rosters, unusual situations, and anticipated requirements during next Operational Period • Provide routine summary reports to the Logistics Section Services Branch Director • Coordinate with the Logistics Services Branch Director and develop and implement the overall Demobilization (DMOB) Plan as it relates to staging areas • Coordinate redeployment or release of the Staging Area personnel with Staging Area Supervisors and the applicable Logistics Section Unit Leaders • Notify the Logistics Contractor of demobilization plans E. Duties, Responsibilities, and Actions During an Emergency Event: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  10. Page 189 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 189 of 369 F. Post- Emergency Event Responsibilities and Reports: • Direct relevant documentation to the Planning Section for disposition • Coordinate with the Property Management Services Unit Leader any site remediation or cleanup requirements that are necessary to return the Staging Area to its original condition • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: 2. Primary Documentation: SUPPLEMENTAL JOB DESCRIPTION INFORMATION 3. Training Requirements: Electric ☒ Gas ☒ State or Business Unit Emergency Response Plan • EP-ALL-PD-2200B, Staging Area Process Description • EP-ALL-JA-2200B-1, Staging Unit Leader Job Aid • EP-ALL-GDL-1000-STG-1, Staging Area Guidelines for a Pandemic Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • eLearning: Staging Area Basics (EP-505P) • Initial Staging Area Training (EP-505) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-08 N:\ Drive; The Hub Rev 0 Page 2 of 2

Text of EOE-010 Attachment 5.pdf

Extracted from the file · 108 pages · 301,258 characters

As listed on the current system

Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)