Interrogatory responses
Answers to questions 9, 10
Files7
EOE-009_final.pdf
PDF · 116 KB · 2 pagesText searchable
Download EOE-009_final.pdfRead the text of EOE-009_final.pdf
EOE-010_final.pdf
PDF · 110 KB · 1 pageText searchable
Download EOE-010_final.pdfRead the text of EOE-010_final.pdf
EOE-010 Attachment 1.pdf
PDF · 1.7 MB · 66 pagesText searchable
Download EOE-010 Attachment 1.pdfRead the text of EOE-010 Attachment 1.pdf
EOE-010 Attachment 2.pdf
PDF · 2.4 MB · 65 pagesText searchable
Download EOE-010 Attachment 2.pdfRead the text of EOE-010 Attachment 2.pdf
EOE-010 Attachment 3.pdf
PDF · 2.0 MB · 70 pagesText searchable
Download EOE-010 Attachment 3.pdfRead the text of EOE-010 Attachment 3.pdf
EOE-010 Attachment 4.pdf
PDF · 11 MB · 369 pagesText searchable
Download EOE-010 Attachment 4.pdfRead the text of EOE-010 Attachment 4.pdf
EOE-010 Attachment 5.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-010 Attachment 5.pdfRead the text of EOE-010 Attachment 5.pdf
Text of EOE-010 Attachment 2.pdf
Extracted from the file · 65 pages · 201,477 characters
Text of EOE-010 Attachment 3.pdf
Extracted from the file · 70 pages · 208,634 characters
Page 210 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 210 of 369 All Hazards Emergency Response Program Effective Date: 7/8/2016 EP-ALL-EPJD-LOG-22, Rev. 0 Approval Date: 7/8/2016 Logistics Resource Acquisition Branch Director EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Logistics Resource Acquisition Branch Director B. Reports To: Logistics Section Chief 1. Direct Reports: • Resource Acquisition Unit Leader • External Resource Field Unit Leader C. Position Duties and Responsibilities: The Logistics Resource Acquisition Branch Director is responsible for overseeing the acquisition of all external mutual aid resources and additional Eversource resources. The Logistics Resource Acquisition Branch Director ensures that external personnel are directed through the check-in process and ensures the demobilization or re-deployment of resources is performed efficiently and effectively. D. Pre-Event Preparations: • Ensure the staffing rosters for the Resource Acquisition Branch Director’s staff positions are up to date and ready to be used • Support the Logistics Section Chief in conducting the annual Section Meeting with all appropriate personnel to ensure they are prepared and trained to carry out their Emergency Positions • Maintain roster of local contractors and mutual assistance contacts, review master list with an ERSG representative, when necessary, and check on availability • When necessary, notify and activate Logistics Resource Acquisition Branch personnel and External Resource Field Unit • Review staffing and prepare staffing schedules • Update Logistics Section Chief on resource status and availability • Record and initiate resource acquisitions as directed • Collaborate with the ERSG as needed • Ensure external rosters are forwarded to Resource Acquisition Unit Leaders for placement in state and incident folder • Ensure external rosters are updated into the resource tracking database and communicated to Planning Section • Coordinate with the Logistics Branch Directors to ensure the resources are provided with all of the required services and support • Assign ERF Unit oversight to secured external crews during the check-in process • Validate the external resources currently on property, confirm retention of local contract Crews • Oversee crew entry into OMS Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 211 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 211 of 369 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Obtain a briefing from the Logistics Section Chief on the status of the emergency event and resource strategy • Continue to compile list of external resources currently working on system • Ensure crews are allotted according to the IAP • Oversee process for time sheets and tracking for external resources • Communicate with the Logistics Section Chief and collaborate with Services Branch Director regarding resources needed to support external crews: staging, fueling, materials, lodging, food, and other logistical needs for resource movements • Collaborate with Logistics Support Branch Director for Hotel Liaison information • Understand the process for acquisition, activation, de-activation, and receiving of internal and external resources • Coordinate with the ERSG for additional Resource needs • Understand the contractor required rest periods and/or release times and the process for lodging and meals coordination • Know the policies and coordination procedure for required safety briefings of foreign crews; (foreign crews are external resources not actively working on the Company’s systems) • Coordinate with HR, the acquisition of Eversource retirees for fulfilling resource needs • Support the development of a Demobilization Plan to return to normal business operations • Collaborate with the Logistics Section Chief to develop resource release schedule, release crews, and coordinate w/ ERSG if activated for demobilization or redeployment • Ensure outside contractor time sheets are forwarded to appropriate financial personnel • Direct relevant documentation to the Planning Section for disposition • Review and approve necessary invoices and bills • Participate in After Action Review(s) Personal Protective Equipment (PPE): • N/A if in the ICC or EOC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center or EOC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan SUPPLEMENTAL JOB DESCRIPTION INFORMATION EP-ALL-EPJD-LOG-22 Gas Rev 0 ☐ Page 2 of 3Page 212 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 212 of 369 3. Training Requirements: Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • External Resource Field Coordinator Training (EP-506) • Resource Acquisition Process and Tool Training (EP-501) • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-22 Resource Acquisition Tool Refresher Training (EP-501R) Eversource N:\ Drive Rev 0 Page 3 of 3Page 213 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 213 of 369 EP-ALL-EPJD-LOG-25 , Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Resource Acquisition Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Resource Acquisition Unit Leader B. Reports To: Logistics Resource Acquisition Branch Director 1. Direct Reports: Resource Acquisition Specialist C. Position Duties and Responsibilities: The Resource Acquisition Unit Leader is responsible for organizing and responding to external and internal resource requests from all areas of the Emergency Response Organization. Resource requests may include but are not limited to line crews, digger crews, tree crews, DA patrollers, and wire guards. Responsible for the check-in process of external crews and the assignment of crew support and check-in support personnel. Interfaces with the ERSG for contract support and mutual aid support from outside their local area. Ensures the demobilization or redeployment of resources is performed efficiently and effectively. Works in coordination with the Resource Tracking Branch, to maintain an accurate tabulation of acquired external and internal resources. D. Pre-Event Preparations: • Assess Resource Acquisition Specialist availability, and activate/deploy unit personnel as directed • Prepare staffing schedules • Ensure Procurement will be embedded in Resource Acquisition Unit to administer PO process • Determine/validate current external and internal resources currently working on system • Review local contractor list and check on availability • Update Resource Acquisition Branch Director on current resource status and availability • Record and initiate resource acquisitions as requested • Communicate and collaborate with the ERSG: o Resources on system o Resource needs: ▪ Type ▪ FTEs ▪ ETAs • Communicate the plan for check-in, food, and lodging with the Logistics Services Branch • Determine whether check-in process is centralized/decentralized and determine locations • Ensure resource acquisition specialists, safety specialists, and external resource field coordinators are available to support check-in process • Ensure external rosters are updated into the resource tracking tool and the Outage Management System and communicated to the Planning Section • Ensure that your laptop is up to date Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 214 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 214 of 369 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Activate/deploy unit personnel as directed • Obtain a briefing from the Logistics Resource Acquisition Branch Director on the status of the event and resource strategy • Coordinate the deployment of resources to requested locations • Coordinate the check-in process with External Resource Field Coordinator (ERFC) and/or Resource Acquisition Specialist to ensure the administration of safety briefings, roster validation, and use of GPS units (if used). • Ensure crews are deployed according to the resource plan • Monitor and direct the movement of external resources • Communicate with the ERSG on additions, releases, or redeployments • Maintain the accuracy of rosters and crew locations in resource tracking database • Communicate with Logistics Services Branch Director for staging, fueling, materials, lodging, food, and other logistical needs for resource movements • Communicate demobilization or redeployment strategy when directed by the Resource Acquisition Branch Director. • Direct relevant documentation to the Planning Section for disposition. • Participate in After Action Review(s). • Ensure all timesheets are collected and actively participate in the invoice review and approval process • Share any updates with regard to contact names, telephone numbers, rates, and/or additional vendors available during emergency situations Personal Protective Equipment (PPE): • N/A if in the ICC or EOC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: AWC, EOC, or other location as assigned I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out, phone call, or email EP-ALL-EPJD-LOG-25 Rev 0 Page 2 of 3Page 215 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 215 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan Gas ☐ Form AD 6369-2 Emergency Restoration Services Daily Worksheet Form AD 3639-3 Eversource Contractor Daily Work Report OMS Booklets ARCOS Resource Tracking Manual Resource Acquisition Specialist Job Aid 3. Training Requirements: Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • Resource Acquisition Process and Tool Training (EP-501) Refresher Training • 4. Required System / Drives Access: Resource Acquisition Tool Refresher Training (EP-501R) Eversource N:\ Drive ARCOS EP-ALL-EPJD-LOG-25 Rev 0 Page 3 of 3Page 216 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 216 of 369 All Hazards Emergency Response Program Effective Date: 8/18/2016 EP-ALL-EPJD-LOG-26 , Rev 0 Approval Date: 8/18/2016 Resource Acquisition Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Resource Acquisition Specialist B. Reports To: Resource Acquisition Unit Leader 1. Direct Reports: None C. Position Duties and Responsibilities: The Resource Acquisition Specialist provides support to the Logistics Resource Acquisition Unit Leader for organizing and responding to external and internal resource requests from all areas of the Emergency Response Organization Resource requests may include but are not limited to: line crews, digger crews, service crews, tree crews, DA patrollers, and wire guards. Supports the check-in process of external crews. Ensures completion and accuracy of Daily Work Log and Timesheet by External Resource Field Coordinator (ERFC). Supports the ERFC through the duration of the incident, including demobilization or redeployment of resources efficiently and effectively. D. Pre-Event Preparations: • Review the process for acquisition, activation, de-activation, and check-in of external resources for both the centralized and de-centralized model • Ensure that your laptop is up to date • Obtain a briefing from the Logistics Resource Acquisition Branch Director on the status of the ERP event and resource strategy • Ensure the resource tracking tool has been updated by the Resource Acquisition Unit Leader • Coordinate the check-in process with the ERFC to ensure the administration of safety briefings, roster validation. Ensure completion and accuracy of Daily Work Log and Timesheet by ERFC. • Validate roster accuracy with the ERFC at check-in location and identify discrepancies to the Resource Acquisition Unit Leader • Monitor and communicate the movement of external resources • Ensure crews are deployed according to the resource plan • Track the redeployment of resources from one EOC/AWC to another • Communicate with the ERSG on additions, releases, or redeployments • Track demobilization plan as requested • Maintain communication with ERFC for check-in, periodic updates, and daily timesheets • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 217 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 217 of 369 Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the AWC, EOC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: AWC, EOC, or other location as assigned I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out, phone call, or email 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☐ Form AD 6369-2 Emergency Restoration Services Daily Worksheet Form AD 3639-3 Eversource Contractor Daily Work Report ARCOS Resource Tracking Manual Resource Acquisition Specialist Job Aid 3. Training Requirements: Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Resource Acquisition Process and Tool Training (EP-501)ARCOS Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-26 Resource Acquisition Tool Refresher Training (EP-501R) Eversource N:\ Drive Rev 0 Page 2 of 2Page 218 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 218 of 369 EP-ALL-EPJD-LOG-27 , Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 External Resource Field Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: External Resource Field Unit Leader B. Reports To: Logistics Resource Acquisition Branch Director 1. Direct Reports: External Resource Field Coordinator C. Position Duties and Responsibilities: External Resource Field Unit Leaders oversee External Resource Field Coordinators who are assigned to contract crews. They determine Coordinator schedules and assign them to contractors, and act as a key point of contact to address any logistical, operational, or safety issues that might arise. D. Pre-Event Preparations: • Assess availability, activate, and deploy unit personnel as directed, including Crew Guides • Assign External Resource Field Coordinators with contract crews in anticipation of arrival • Provide a schedule for all personnel for location, shifts, and contractor coverage • Ensure Food and Lodging requirements have been communicated • Coordinate External Resource Field Coordinators assignments and contract crews • Ensure External Resource Field Coordinators are tracking contractor work and rest hours and coordinating safety briefings • Respond to questions and issues raised by External Resource Field Coordinators • Ensure all contractor time sheets and evaluation forms have been turned in to the Logistics Resource Acquisition Branch Director • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in EOC/ AWC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Regional EOC or AWC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 219 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 219 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • External Resource Field Coordinator Training (EP-506) • MEA ELEC-02301 Overhead Line Equipment Recognition Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-27 eLearning: External Resource Field Coordinator Refresher (EP-506R) Eversource N:\ Drive Rev 0 Page 2 of 2
Text of EOE-010 Attachment 5.pdf
Extracted from the file · 108 pages · 301,258 characters
As listed on the current system
Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026