Interrogatory responses
Answers to questions 9, 10
Files7
EOE-009_final.pdf
PDF · 116 KB · 2 pagesText searchable
Download EOE-009_final.pdfRead the text of EOE-009_final.pdf
EOE-010_final.pdf
PDF · 110 KB · 1 pageText searchable
Download EOE-010_final.pdfRead the text of EOE-010_final.pdf
EOE-010 Attachment 1.pdf
PDF · 1.7 MB · 66 pagesText searchable
Download EOE-010 Attachment 1.pdfRead the text of EOE-010 Attachment 1.pdf
EOE-010 Attachment 2.pdf
PDF · 2.4 MB · 65 pagesText searchable
Download EOE-010 Attachment 2.pdfRead the text of EOE-010 Attachment 2.pdf
EOE-010 Attachment 3.pdf
PDF · 2.0 MB · 70 pagesText searchable
Download EOE-010 Attachment 3.pdfRead the text of EOE-010 Attachment 3.pdf
EOE-010 Attachment 4.pdf
PDF · 11 MB · 369 pagesText searchable
Download EOE-010 Attachment 4.pdfRead the text of EOE-010 Attachment 4.pdf
EOE-010 Attachment 5.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-010 Attachment 5.pdfRead the text of EOE-010 Attachment 5.pdf
Text of EOE-010 Attachment 2.pdf
Extracted from the file · 65 pages · 201,477 characters
Text of EOE-010 Attachment 3.pdf
Extracted from the file · 70 pages · 208,634 characters
Page 261 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 261 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • eLearning: OMS-The Life Cycle of an Outage Event (EP-605) • eLearning: OMS 01-Introduction to OMS (EP-OMS 01) • eLearning: OMS 02-Work Agenda (EP-OMS 02) • eLearning: OMS 03-Sorting and Filtering (EP-OMS 03) • eLearning: OMS 04-Symbology (EP-OMS 04) • eLearning: OMS 05-Viewer (EP-OMS 05) • eLearning: OMS 06-Viewer Maps (EP-OMS 06) • eLearning: OMS 07-Control Tool (EP-OMS 07) • eLearning: OMS 08-Referrals (EP-OMS 08) • eLearning: OMS 09A-Managing Crews (EP-OMS 09A) • eLearning: OMS 9B-Managing Crews (EP-OMS 09B) • eLearning: OMS 10-Trouble Information (EP-OMS 10) • eLearning: OMS 11-Executing Traces (EP-OMS 11) • eLearning: OMS 12-Grouping Events (EP-OMS 12) • eLearning: OMS 13-Damage Assessment (EP-OMS 13) • eLearning: OMS 14-Managing Events (EP-OMS 14) • eLearning: OMS 15-Confirming Outages (EP-OMS 15) • eLearning: OMS 16-Managing Operations (EP-OMS 16) • eLearning: OMS 17-Viewing Summaries (EP-OMS 17) • eLearning: OMS-Completing Events (EP-606) • Initial EP OMS Training (EP-603) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-11 EP OMS Training - Refresher (EP-603R) Eversource N:\ Drive Rev 0 Page 2 of 2Page 262 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 262 of 369 EP-ALL-EPJD-OP-12 , Rev. 0 All Hazards Emergency Response Program Effective Date: 10/13/2016 Approval Date: 10/13/2016 Vegetation Management Coordinator EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Vegetation Management Coordinator B. Reports To: Vegetation Management Unit Leader 1. Direct Reports: N/A C. Position Duties and Responsibilities: D. Pre-Event Preparations: E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: The Vegetation Management Coordinator is the link between the tree crews in the field and the Restoration Management Team. The Vegetation Management Coordinator: • Reviews and dispositions tree-related events in the OMS work queue, working in coordination with the RMT Modeler and Operations Coordinator on the RMT • Communicates with crews working in the field, and updates events in the OMS with work progress, and estimated times for completion • Communicates with the RMT regarding work status • Ensure knowledge and understanding of OMS, including the damage assessment and referral processes • Participate on Operations Branch Director pre-event conference calls and discuss availability with Operations Group Manager • Log in to OMS and review training materials and other job aids, addressing any technology issues • Ensure crew rosters have been provided to the Logistics Resource Acquisition Branch Director and all crews have been properly received • Build crews in OMS • Monitor OMS for work requiring tree crews • Communicate and collaborate with RMT Operations Coordinator and Modeler to ensure efficient use of crews and resources • Assign work to crews in OMS • Communicate with tree crews in the field and provide assignment details • Refer events when work is completed by tree crews, if line or service resources are needed • Add event details, and close tickets as work is completed • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) Personal Protective Equipment (PPE): • N/A - If in the EOC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 263 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 263 of 369 H. Position Work Location: Emergency Operations Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • eLearning: OMS-The Life Cycle of an Outage Event (EP-605) • eLearning: OMS 01-Introduction to OMS (EP-OMS 01) • eLearning: OMS 02-Work Agenda (EP-OMS 02) • eLearning: OMS 03-Sorting and Filtering (EP-OMS 03) • eLearning: OMS 04-Symbology (EP-OMS 04) • eLearning: OMS 05-Viewer (EP-OMS 05) • eLearning: OMS 06-Viewer Maps (EP-OMS 06) • eLearning: OMS 07-Control Tool (EP-OMS 07) • eLearning: OMS 08-Referrals (EP-OMS 08) • eLearning: OMS 09A-Managing Crews (EP-OMS 09A) • eLearning: OMS 9B-Managing Crews (EP-OMS 09B) • eLearning: OMS 10-Trouble Information (EP-OMS 10) • eLearning: OMS 11-Executing Traces (EP-OMS 11) • eLearning: OMS 12-Grouping Events (EP-OMS 12) • eLearning: OMS 13-Damage Assessment (EP-OMS 13) • eLearning: OMS 14-Managing Events (EP-OMS 14) • eLearning: OMS 15-Confirming Outages (EP-OMS 15) • eLearning: OMS 16-Managing Operations (EP-OMS 16) • eLearning: OMS 17-Viewing Summaries (EP-OMS 17) • eLearning: OMS-Completing Events (EP-606) • Initial EP OMS Training (EP-603) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-12 EP OMS Training - Refresher (EP-603R) Eversource N:\ Drive Rev 0 Page 2 of 2Page 264 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 264 of 369 EP-ALL-EPJD-OP-14 , Rev. 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Wire Guard Group Manager EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Wire Guard Group Manager B. Reports To: Assistant Operations Section Chief 1. Direct Reports: Wire Guard Unit Leaders C. Position Duties and Responsibilities: The Wire Guard Group Manager manages and oversees the Wire Guard process by ensuring a Wire Guard is sent to damage locations that require someone to be present to stand by potential electrical hazards. D. Pre-Event Preparations: • Ensure the staffing rosters for all Wire Guard positions are up to date and ready to be used • Understand the provisions of the company union agreements as they are interpreted under emergency operations • Deploy to the ICC or specific reporting location as directed, report to the Assistant Operations Section Chief, and obtain a situational awareness and strategy briefing • Following activation of the Incident Management Team (IMT), activate the required Wire Guard personnel, develop staffing schedules, and provide initial staffing plans to Operations Section and Logistics Section Chiefs • Conduct an initial briefing and routine update meetings and briefings with Wire Guard personnel • Inform the Assistant Operations Section Chief of additional Wire Guard resource requirements • Work with the Logistics and Planning Sections to determine geographical locations within the territory for pre-deployment of personnel based on threat • Coordinate with Restoration Management Teams to ensure that high priority wire down situations are responded to and have a Wire Guard assigned as necessary • Ensure the Wire Guard Unit Leaders have established a schedule and are able to provide relief and breaks for Wire Guards stationed at field locations • Coordinate with the Logistics Section to provide food and lodging, if necessary, for Wire Guards • Provide periodic status reports and updates to the Assistant Operations Section Chief • Support the development of a Demobilization Plan to return to normal business operations • Develop resource release schedule and release personnel as necessary to the Logistics Section for demobilization or redeployment • Ensure outside contractor time sheets are forwarded to appropriate financial personnel • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 265 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 265 of 369 G. Equipment Required: Personal Protective Equipment (PPE): • N/A if in the ICC or other office location Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC or specific reporting location as directed I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan SUPPLEMENTAL JOB DESCRIPTION INFORMATION EP-ALL-EPJD-OP-14 Gas Rev 0 ☐ Page 2 of 3Page 266 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 266 of 369 3. Training Requirements: Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Wire Guard & Service Crew Process Training • Initial Wire Guard Instructor-Led Training (EP-701) • eLearning: Wire Guard (EP-701P) • eLearning: OMS-The Life Cycle of an Outage Event (EP-605) • eLearning: OMS 01-Introduction to OMS (EP-OMS 01) • eLearning: OMS 02-Work Agenda (EP-OMS 02) • eLearning: OMS 03-Sorting and Filtering (EP-OMS 03) • eLearning: OMS 04-Symbology (EP-OMS 04) • eLearning: OMS 05-Viewer (EP-OMS 05) • eLearning: OMS 06-Viewer Maps (EP-OMS 06) • eLearning: OMS 07-Control Tool (EP-OMS 07) • eLearning: OMS 08-Referrals (EP-OMS 08) • eLearning: OMS 09A-Managing Crews (EP-OMS 09A) • eLearning: OMS 9B-Managing Crews (EP-OMS 09B) • eLearning: OMS 10-Trouble Information (EP-OMS 10) • eLearning: OMS 11-Executing Traces (EP-OMS 11) • eLearning: OMS 12-Grouping Events (EP-OMS 12) • eLearning: OMS 13-Damage Assessment (EP-OMS 13) • eLearning: OMS 14-Managing Events (EP-OMS 14) • eLearning: OMS 15-Confirming Outages (EP-OMS 15) • eLearning: OMS 16-Managing Operations (EP-OMS 16) • eLearning: OMS 17-Viewing Summaries (EP-OMS 17) • eLearning: OMS-Completing Events (EP-606) • eLearning: Introduction to FocalPoint (EP-607) • eLearning: FocalPoint OMS Dashboards (EP-608) • eLearning: FocalPoint OCS Dashboards (EP-609) • eLearning: FocalPoint- ARL Dashboards (EP-610) • Initial EP OMS Training (EP-603) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-14 EP OMS Training - Refresher (EP-603R) Eversource N:\ Drive Rev 0 Page 3 of 3Page 267 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 267 of 369 EP-ALL-EPJD-OP-16 , Rev. 0 All Hazards Emergency Response Program Effective Date: 7/8/16 Approval Date: 7/8/16 Wire Guard Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Wire Guard Unit Leader B. Reports To: Wire Guard Group Manager 1. Direct Reports: Wire Guard Coordinator C. Position Duties and Responsibilities: The Wire Guard Unit Leader is responsible for managing and overseeing the response of Wire Guards to damage locations that require personnel to stand by potential electrical hazards D. Pre-Event Preparations: • Ensure knowledge and understanding of the Outage Management System (OMS) including the damage assessment and referral processes • Assess availability, activate, and deploy unit personnel as directed • Understand the provisions of the company union agreements as they are interpreted under emergency operations • Ensure technology and equipment at assigned work locations is tested and operational • Make notifications and activate personnel within unit: • Provide situational briefing on event to Wire Guard Group Manager and Wire Guard Coordinators • Develop shift schedules for the unit • Work with the Wire Guard Group Manager to secure external contractor resources • Contact Logistics Transportation Services Unit for required rental vehicles, if necessary • Develop and maintain an accurate work plan for wire guard jobs; ensure arrival and release times are accurately recorded in OMS • Coordinate with Restoration Management Teams to ensure that high priority wire downs have been responded to and have wire guard support if required • Ensure that Wire Guard Unit has schedule and system in place to provide relief and breaks to guards at damage locations • Ensure food and lodging requirements have been communicated to Logistics • Coordinate field support required for wire guard work as necessary • Ensure events are being referred to the appropriate resource group in the OMS work queue • Provide periodic updates to the Wire Guard Group Manager and participate in scheduled situational briefings and calls • Communicate to direct reports tactics specific to the unit as developed in the IAP • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 268 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 268 of 369 G. Equipment Required: Personal Protective Equipment (PPE): • N/A if in EOC or other office location Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Regional EOC or specific reporting location as directed I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out EP-ALL-EPJD-OP-16 Rev 0 Page 2 of 3Page 269 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 269 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • Wire Guard & Service Crew Process Training • Initial Wire Guard Instructor-Led Training (EP-701) • eLearning: Wire Guard (EP-701P) • eLearning: OMS-The Life Cycle of an Outage Event (EP-605) • eLearning: OMS 01-Introduction to OMS (EP-OMS 01) • eLearning: OMS 02-Work Agenda (EP-OMS 02) • eLearning: OMS 03-Sorting and Filtering (EP-OMS 03) • eLearning: OMS 04-Symbology (EP-OMS 04) • eLearning: OMS 05-Viewer (EP-OMS 05) • eLearning: OMS 06-Viewer Maps (EP-OMS 06) • eLearning: OMS 07-Control Tool (EP-OMS 07) • eLearning: OMS 08-Referrals (EP-OMS 08) • eLearning: OMS 09A-Managing Crews (EP-OMS 09A) • eLearning: OMS 9B-Managing Crews (EP-OMS 09B) • eLearning: OMS 10-Trouble Information (EP-OMS 10) • eLearning: OMS 11-Executing Traces (EP-OMS 11) • eLearning: OMS 12-Grouping Events (EP-OMS 12) • eLearning: OMS 13-Damage Assessment (EP-OMS 13) • eLearning: OMS 14-Managing Events (EP-OMS 14) • eLearning: OMS 15-Confirming Outages (EP-OMS 15) • eLearning: OMS 16-Managing Operations (EP-OMS 16) • eLearning: OMS 17-Viewing Summaries (EP-OMS 17) • eLearning: OMS-Completing Events (EP-606) • eLearning: Introduction to FocalPoint (EP-607) • Initial EP OMS Training (EP-603) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-16 EP OMS Training - Refresher (EP-603R) Eversource N:\ Drive Rev 0 Page 3 of 3Page 270 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 270 of 369 All Hazards Emergency Response Program Effective Date: 8/18/2016 EP-ALL-EPJD-OP-17 , Rev. 0 Approval Date: 8/18/2016 Wire Guard Coordinator EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Wire Guard Coordinator B. Reports To: Wire Guard Unit Leader 1. Direct Reports: • Wire Guard Field Coordinator • Wire Guard C. Position Duties and Responsibilities: The Wire Guard Coordinator is responsible to assign and dispatch Wire Guards to damage locations, within an assigned region, where downed wires have created a potential electrical hazard. D. Pre-Event Preparations: • Ensure knowledge and understanding of the Outage Management System (OMS) including the damage assessment and referral processes • Discuss availability with Wire Guard Unit Leader • Log in to OMS to validate credentials and ensure technology is up to date • Build Wire Guard crews in OMS • Verify availability of any needed Wire Guard Kits • Monitor priority calls and referrals in the OMS Work Agenda • Monitor work queue for referrals to Wire Guard • Assign Wire Guards to events in OMS • Coordinate with Wire Guard Field Coordinators and communicate with Wire Guards on assignments • Ensure necessary information for priority calls is captured, including when resource is assigned and arrives onsite, in event details • Add any relevant event comments in the OMS, based on field conditions reported by Wire Guards • Escalate any logistical issues to the Wire Guard Unit Leader • Coordinate with the Damage Assessment Coordinator to deploy Wire Guard resources as a result of conditions identified during damage assessment patrolling • Collaborate with the System Operator or Operations Coordinator when an emergency request is made for a Line Crew • Following the assignment and dispatch of a Wire Guard to an event, refer the event to the next appropriate group • Track all wire guard personnel within the respective area assigned • Create a rotational shift to allow breaks for people out in the field • Ensure that the guards provide public protection by directing public a safe distance away. • If DA has not been performed, document OMS remarks whether conductor is primary or secondary voltage, or if it is telecommunications wire • Forecast the next location • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
Text of EOE-010 Attachment 5.pdf
Extracted from the file · 108 pages · 301,258 characters
As listed on the current system
Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026