Interrogatory responses
Answers to questions 9, 10
Files7
EOE-009_final.pdf
PDF · 116 KB · 2 pagesText searchable
Download EOE-009_final.pdfRead the text of EOE-009_final.pdf
EOE-010_final.pdf
PDF · 110 KB · 1 pageText searchable
Download EOE-010_final.pdfRead the text of EOE-010_final.pdf
EOE-010 Attachment 1.pdf
PDF · 1.7 MB · 66 pagesText searchable
Download EOE-010 Attachment 1.pdfRead the text of EOE-010 Attachment 1.pdf
EOE-010 Attachment 2.pdf
PDF · 2.4 MB · 65 pagesText searchable
Download EOE-010 Attachment 2.pdfRead the text of EOE-010 Attachment 2.pdf
EOE-010 Attachment 3.pdf
PDF · 2.0 MB · 70 pagesText searchable
Download EOE-010 Attachment 3.pdfRead the text of EOE-010 Attachment 3.pdf
EOE-010 Attachment 4.pdf
PDF · 11 MB · 369 pagesText searchable
Download EOE-010 Attachment 4.pdfRead the text of EOE-010 Attachment 4.pdf
EOE-010 Attachment 5.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-010 Attachment 5.pdfRead the text of EOE-010 Attachment 5.pdf
Text of EOE-010 Attachment 2.pdf
Extracted from the file · 65 pages · 201,477 characters
Text of EOE-010 Attachment 3.pdf
Extracted from the file · 70 pages · 208,634 characters
Page 301 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 301 of 369 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Collect and compile outage and damage data to predict and report damage impact • Formulate an overall response and recovery strategy in collaboration with others and develop an IAP including providing recommendations of movement, addition, or releases of resources as appropriate • Inform the Planning Section Chief of additional Planning Branch Forecasting resources required • Collaborate with the Liaison Officer to develop and validate reporting to regulators, as required • In collaboration with Operations, use the Outage Management System (OMS) Storm Management module and other data and considerations to determine the Global ETR; ensure entry into (override) the OMS ETRs at the various zones (State, Region, AWC, Town, Circuit) within the IMTs geographical jurisdiction • Collaborate with the Communications Officer to develop global restoration messages for the various zones (Region and AWC) within the IMT’s geographical jurisdiction and ensure update of the RTS Global Restoration Messaging tool • Collaborate with the Planning Branch Director - Tactical on a DA strategy and associated time constraints • Monitor restoration progress against communicated ETRs, identify at risk ETRs, and adjust as necessary • Oversee development of “what if scenarios” to determine optimum staffing levels • Ensure positions within the Branch execute their specific duties and responsibilities effectively • Support the development of a Demobilization Plan, including resource schedule, and release resources as necessary to the Planning Section Chief for demobilization or redeployment • Ensure all models and data are saved for post event analysis • Ensure that all forms and documentation are properly completed and provided to the Planning Section Chief • Participate in After Action Review(s) Personal Protective Equipment (PPE): • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out EP-ALL-EPJD-PLN-02 Rev 0 Page 2 of 3Page 302 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 302 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • eLearning: Introduction to FocalPoint (EP-607) • eLearning: FocalPoint OMS Dashboards (EP-608) • eLearning: FocalPoint OCS Dashboards (EP-609) • eLearning: FocalPoint- ARL Dashboards (EP-610) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-02 Eversource N:\ Drive, SharePoint, Teams, FocalPoint Rev 0 Page 3 of 3Page 303 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 303 of 369 All Hazards Emergency Response Program Effective Date: 4/27/2016 EP-ALL-EPJD-PLN-03 , Rev. 0 Approval Date: 4/27/2016 Planning Branch Director - Transmission EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning Branch Director - Transmission B. Reports To: Planning Section Chief 1. Direct Reports: Transmission Support Specialist C. Position Duties and Responsibilities: The Planning Branch Director - Transmission, in collaboration with the Incident Commander and other Command and General staff personnel, is responsible for developing and recommending the overall transmission system restoration strategy, including estimated restoration times based on resources available, damage assessment data, and current and forecasted weather conditions. Coordinates engineering and technical support needed to support transmission repair activities. D. Pre-Event Preparations: • Assess availability, activate, and deploy branch personnel, as needed • Support the Planning Section Chief in conducting the annual Section Meeting with all appropriate personnel to ensure they are prepared and trained to carry out their Emergency Positions • Review system equipment out-of-service and SCLLs, and recall work, as needed • Participate in the development of the first Operational Period Incident Action Plan (IAP), as needed • Processes information and data for input into Operational Period’s Incident Action Plan. • Determine the damage assessment process for the transmission system • Oversee the collecting, analyzing, and managing of transmission event status information, including damage assessment, resource needs, allocation, and so on, and ensure it is compiled and displayed as necessary • Coordinate with the Planning Branch Director – Forecasting and other IMT leadership positions to develop a mutually agreed upon strategy and sequence of priorities • Ensure the development, updating, and communication times of the required Estimated Restoration Times (ETR) for transmission system repairs • Prepare regular reports and information for the Planning Section Chief as required or requested • Inform the Logistics Section of additional resource requirements (including the need for specialized resources) or when resources will soon become available for redeployment • Ensure that all damage assessment data is being compiled in a timely fashion • Participate in the development of the IAP in collaboration with the Incident Commander and the General and Command staffs • Coordinate engineering and technical support needed to support transmission repair activities • Recognize and report significant changes in incident status to the Planning Section Chief/Incident Commander • Ensure that the positions within the Branch execute their specific duties and responsibilities • Oversee the preparation of the Demobilization Plan to include developing a strategy for releasing external crews in the most cost effective manner and return the organization to normal business operations E. Duties, Responsibilities, and Actions During an Emergency Event: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 304 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 304 of 369 F. Post- Emergency Event Responsibilities and Reports: • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Ensure outside contractor time sheets are forwarded to appropriate financial personnel Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-03 Eversource N:\ Drive Rev 0 Page 2 of 2Page 305 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 305 of 369 EP-ALL-EPJD-PLN-04 , Rev 0 All Hazards Emergency Response Program Effective Date: 6/13/2016 Approval Date: 6/13/2016 Transmission Support Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Transmission Support Specialist B. Reports To: Planning Branch Director - Transmission 1. Direct Reports: None C. Position Duties and Responsibilities: The Transmission Support Specialist supports the Planning Branch Director – Transmission in the assessment of transmission system damage and the development of an integrated restoration strategy in coordination with the Planning Forecasting Branch. D. Pre-Event Preparations: • Support the Planning Branch Director – Transmission • Maintain Situational awareness • Support the compilation of transmission system damage • Support the development of a prioritized transmission restoration strategy and coordinate with the Planning Forecasting Branch to ensure an integrated plan • Provide an interface with engineering/technical support, as needed • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 306 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 306 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-04 Eversource N:\ Drive Rev 0 Page 2 of 2Page 307 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 307 of 369 EP-ALL-EPJD-PLN-05 , Rev. 0 All Hazards Emergency Response Program Effective Date: 4/27/2016 Approval Date: 4/27/2016 Planning Unit Leader - Strategic EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning Unit Leader - Strategic B. Reports To: Planning Branch Director - Forecasting 1. Direct Reports: Planning & ETR Specialist C. Position Duties and Responsibilities: The Planning Unit Leader - Strategic is responsible for monitoring weather and road conditions, crew resources, trouble spot to crew ratios, developing and publishing global Estimated Times to Restoration (ETRs), messaging, and monitoring ETRs against restoration progress. Advises the Planning Branch Director - Forecasting/IMT of strategic considerations/recommendations based on conditions and parameters monitored. D. Pre-Event Preparations: • When instructed, establish Planning Section Room at the Incident Command Center • Monitor weather forecasts in the regions and damage to other utilities • Review data from available damage prediction models • Collect and compile data from the OMS, System Operations, and Resource Tracking Branch in order to predict and report damage, customer impact, and the recommendation of movement, addition, or releases of resources as appropriate • Develop and recommend Global ETRs by system, region, AWC, and town, and message to Planning Branch Director Forecasting/Planning Section Chief • Update system OMS and messaging tool with approved ETR messages • Monitor restoration progress against communicated ETRs and report at risk ETRs • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 308 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 308 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • eLearning: Introduction to FocalPoint (EP-607) • eLearning: FocalPoint OMS Dashboards (EP-608) • eLearning: FocalPoint OCS Dashboards (EP-609) • eLearning: FocalPoint- ARL Dashboards (EP-610) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-05 Eversource N:\ Drive Rev 0 Page 2 of 2Page 309 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 309 of 369 EP-ALL-EPJD-PLN-06 , Rev. 1 All Hazards Emergency Response Program Effective Date: 01/13/2021 Approval Date: 01/13/2021 Planning & ETR Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning & ETR Specialist B. Reports To: Planning Branch Director - Forecasting 1. Direct Reports: None C. Position Duties and Responsibilities: The Planning & ETR Specialist is responsible for monitoring weather and road conditions, crew resources, trouble spot to crew ratios, developing and recommending global Estimated Times to Restoration (ETRs), messaging, and monitoring ETRs against restoration progress. Advises the Planning Branch Director - Forecasting of strategic considerations/recommendations based on conditions and parameters monitored. D. Pre-Event Preparations: • Monitor weather forecasts in the regions and damage to other utilities • Review data from available damage prediction models • Collect and compile data from the OMS, System Operations, and Resource Tracking Branch in order to predict and report damage and customer impact; and recommended movement, addition, or releases of resources as appropriate • Develop and recommend Global ETRs by system, region, AWC, and town; and messaging to Planning Branch Director - Forecasting • Update system OMS and messaging tool with approved ETR messages • Monitor restoration progress against communicated ETRs and report at-risk ETRs • Direct relevant documentation to the Planning Section Chief for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 310 of 369
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 310 of 369 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • eLearning: OMS 01-Introduction to OMS (EP-OMS 01) • eLearning: OMS 02-Work Agenda (EP-OMS 02) • eLearning: OMS 03-Sorting and Filtering (EP-OMS 03) • eLearning: OMS 04-Symbology (EP-OMS 04) • eLearning: OMS 05-Viewer (EP-OMS 05) • eLearning: OMS 06-Viewer Maps (EP-OMS 06) • eLearning: OMS 07-Control Tool (EP-OMS 07) • eLearning: OMS 08-Referrals (EP-OMS 08) • eLearning: OMS 09A-Managing Crews (EP-OMS 09A) • eLearning: OMS 9B-Managing Crews (EP-OMS 09B) • eLearning: OMS 10-Trouble Information (EP-OMS 10) • eLearning: OMS 11-Executing Traces (EP-OMS 11) • eLearning: OMS 12-Grouping Events (EP-OMS 12) • eLearning: OMS 13-Damage Assessment (EP-OMS 13) • eLearning: OMS 14-Managing Events (EP-OMS 14) • eLearning: OMS 15-Confirming Outages (EP-OMS 15) • eLearning: OMS 16-Managing Operations (EP-OMS 16) • eLearning: OMS 17-Viewing Summaries (EP-OMS 17) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-06 Eversource N:\ Drive Rev 1 Page 2 of 2
Text of EOE-010 Attachment 5.pdf
Extracted from the file · 108 pages · 301,258 characters
As listed on the current system
Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026