Interrogatory responses

Answers to questions 9, 10

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy7 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files7

Text of EOE-010 Attachment 2.pdf

Extracted from the file · 65 pages · 201,477 characters

Text of EOE-010 Attachment 3.pdf

Extracted from the file · 70 pages · 208,634 characters

  1. Page 91 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 91 of 369 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 6 of 12) PURA Docket 2012 Order # Recommendations Performance Standard CT ERP Section Page 8.2 80 PURA Docket No. 12-06-09 2.c.i.5 5. The EDC shall participate in other emergency exercises, which are conducted by the state or any state-established emergency office for one or more regions in the EDC's service territory, that is designed to address problems on electric distribution facilities or services and to which the utility has been invited to participate. PURA Docket No. 12-06-09 2 Each EDC will also file the ERP in full when there have been any material changes in the ERP. 9.2 81 2 Submit ERP to the PURA for reviews of emergency plans every two years, on or before July 1st, pursuant to the General Statutes of Connecticut (Conn. Gen. Stat.) §16-32e. 10.2 82 2.a.vi Each EDC shall annually notify the PURA by July 1st of the mutual aid groups to which it belongs and whether there have been changes in the membership of those groups or material changes in the rules of those groups within the previous 12 months. 10.2 82 PURA Docket No. 12-06-09 PURA Docket No. 12-06-09 EP-CT-ELEC-PLN-2000 91 of 103 Rev 4
  2. Page 92 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 92 of 369 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 7 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 20-08-03 N/A 1 PURA Docket No. 20-08-03 N/A 2 EP-CT-ELEC-PLN-2000 Performance Standard No later than June 30, 2021, Eversource and UI shall separately submit for the Authority’s review, modification, and approval updated ERPs incorporating all of the changes discussed herein. In this filing, the EDCs shall provide two sets of ERPs: a version with redline edits and a clean version. Such changes shall include the modifications to the ERP Event Level Classification Matrix outlined in Section IV.D.8. The updated matrix shall include the number of total, internal, and external resources to be available at the onset of the storm, as well as the peak number of crews expected during the storm restoration process for each event level for the following categories of resources by number of crews and full time equivalent staff: a. Line Crews; b. Service Crews; c. Damage Assessors; d. Tree/Line Clearance/ Vegetation Mgt Crews; e. Liaisons; and f. Large customer account representatives (See, Section IV.G.1.). The EDCs shall also develop a process for identifying and tracking life support customers, which are customers that require electrical service for life-maintaining conditions. The EDCs shall incorporate into their respective ERPs filed for the Authority’s review, modification, and approval on or before June 30, 2021, a formal process to contact life support customers before, during, and after storm events. Specifically, the formal process must include steps to: contact all life support customers more than 24 hours before the onset of a major storm; track the status of electric service to life support customers; regularly update each municipality served by the EDC of the life support customers without power in their town; and provide daily communications to life support customers without power during the storm restoration process 92 of 103 CT ERP Section Page 2, Table 1 Table 2 12, 17, 19 3.9 64 Rev 4
  3. Page 93 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 93 of 369 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 8 of 12) PURA Docket 2012 Rec Order Performance Standard # PURA Docket No. 20-08-03 N/A 3 PURA Docket No. 20-08-03 N/A 4 EP-CT-ELEC-PLN-2000 No later than June 30, 2021, Eversource and UI shall separately perform and submit to the Authority a study to determine the number of damage assessors needed to assist in the identification of Make Safe locations and restoration duties within the first 48 hours of storm onset for each of the event levels in its Event Level Matrix. Based on the findings of the study, UI and Eversource shall include in their respective updated ERPs the range of damage assessors likely needed in the event level classification, as directed in Order No. 1. Until further notice, the Authority directs Eversource and UI to include in their storm preparedness resource acquisition activities the ability to acquire enough line resources and liaisons sufficient to dedicate one of each to any potentially affected municipality in its territory who requests such. This requirement shall apply to any Event Level 4 or higher. a. In the case of Make Safe liaisons, Eversource and UI shall provide a Make Safe liaison that is in addition to the town liaison and will be dedicated solely during response to coordinate blocked roads with the towns until all Make Safe roads are cleared or until such a time as the EDC and town has conferred and determined that the town no longer needs a dedicated Make Safe liaison. b. In the case of line resources, Eversource and UI shall have on hand line resources in advance of an event sufficient to provide one lineworker crew for each towns that request one. UI shall continue to provide a dedicated line 93 of 103 CT ERP Section Page 3.2, 3.6, Table 1 Table 2 34, 53, 17, 19 3.2, 3.6, Table 1 Table 2 34, 53, 17, 19 Rev 4
  4. Page 94 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 94 of 369 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 9 of 12) PURA Docket 2012 Rec Order # 4 (continued) PURA Docket No. 20-08-03 EP-CT-ELEC-PLN-2000 N/A 5 Performance Standard resource crew and Make Safe crew to each municipality that requests one according to its current policy. In the case of an Event Level 4 or higher, Eversource and UI shall make these resources available for municipalities no later than 12 hours after the storm has left the area. Additional line resources brought to bear for which a town no longer has need may, upon confirmation with the town, be allocated to restoration or to other duties. This requirement is not intended to prevent the EDCs from using all of its available crews to respond to higher priority needs to ensure public safety. c. Each EDC shall develop criteria such as, but not limited to, the number of damage locations as a percent of miles of main line primary in a town, or total miles of primary that would be applied to determine the deployment of available Make Safe liaisons and line crews to those towns that have the highest public safety and outage impact, in the event that, and only so long as, available resources are not sufficient to address all public safety priorities at the same time in all towns. This requirement is intended to allow the EDCs to use all available crews to respond to higher priority needs to ensure public safety. Such criteria shall be included in the emergency response plan and reviewed annually with each town. No later than June 30, 2021, Eversource shall review and update its CG ERP to incorporate all recent changes to its outage reporting channels and systems REFER TO CG ANNEX 94 of 103 CT ERP Section Page EP-ALL-ANX-1000D, Customer Group Annex Rev 4
  5. Page 95 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 95 of 369 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 10 of 12) PURA Docket 2012 Rec Order Performance Standard # PURA Docket No. 20-08-03 N/A 7 PURA Docket No. 20-08-03 N/A 8 EP-CT-ELEC-PLN-2000 No later than June 30, 2021, the EDCs are directed to individually collaborate with CIEC to develop and submit to the Authority for review, modification, and approval the following modifications to the EDCs’ emergency response activities relating to major customer accounts, which shall be incorporated into each EDC’s ERP upon approval: a. Solutions to better to support major accounts during emergency events; b. Formal after action reporting process for major accounts; and c. Formal emergency preparedness and response communications plan with account representatives. No later than June 30, 2021, the EDCs shall revise and file for the Authority’s review, modification, and approval timesheets or other documentation used to track work performed by external or contractor line crews and damage assessors during future storms. Such revised timesheet or other documentation shall include the following minimum set of information per shift: a. Number or amount of work performed; b. Description and location of work performed; c. Beginning and ending locations; d. Paid time spent traveling at start and end of shift; e. Paid time traveled for mobilization, demobilization, and standby time; and f. Employee names; dates; and hours worked. The timesheets/documentation templates shall be included as an attachment to each EDC’s public version of its ERP. 95 of 103 CT ERP Section Page Table 1 Table 2, 3.2, 3.9 17, 19, 34, 64 2.11.4, 3.5.2 31, Rev 4
  6. Page 96 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 96 of 369 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 11 of 12) PURA Docket 2012 Rec Order Performance Standard # PURA Docket No. 20-08-03 N/A 9 PURA Docket No. 20-08-03 N/A 10 EP-CT-ELEC-PLN-2000 No later than June 30, 2021, the EDCs shall separately submit in a report to the Authority for its review and approval findings from the EDCs’ outreach to municipalities to understand what information and best form(s) of communicating that information is most useful and actionable to the towns during the first 48 hours following an Event Level 3 or greater event. The report shall also include a proposed template for use during future storms to communicate this information to towns for the Authority’s review, modification, and approval. The Authority will subsequently release such report for public comment. Once approved by the Authority, the EDCs shall communicate any required changes to the current communications protocols to all municipal leaders in their service territory and shall incorporate such protocols into the EDCs’ respective ERPs. No later than June 30, 2021, the EDCs shall separately work with municipalities in their service territories to identify ways that reporting blocked roads could be improved using the current manual reporting system. The EDCs shall summarize the input received from the municipalities in a report to the Authority. The report shall also include proposed improvements to the current reporting system for the Authority’s review, modification, and approval. The EDCs are directed to submit for the Authority’s review and approval the report and the proposed improvements. Once approved, the EDCs shall communicate any required changes to the current reporting system to all municipal leaders in their service territory and shall incorporate such changes into the EDCs’ respective ERPs. 96 of 103 CT ERP Section Page Table 1 Table 2 3.2, 3.9 17, 19, 34, 64 3.2, 3.6, Table 1 Table 2 34, 53, 17, 19 Rev 4
  7. Page 97 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 97 of 369 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 12 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 20-08-03 N/A 11 PURA Docket No. 20-08-03 N/A 12 PURA Docket No. 20-08-03 N/A 13 EP-CT-ELEC-PLN-2000 Performance Standard No later than June 30, 2021, the EDCs shall submit to the Authority a revised standard template for its 60-Day After Action Reports submitted to the Authority pursuant to Section 3.7 of Appendix A of the Performance Standards Decision that includes a section to consider corrective actions and lessons learned regarding performance efficiencies or cost saving measures. Upon approval of the compliance materials filed in response to Order No. 9, and upon approval of the compliance materials filed in response to Order No. 10, the EDCs shall re-file their ERPs with any changes authorized by the Authority. For the sake of clarity, each EDC shall refile its ERP twice, unless the Authority’s approval of the compliance filings in questions occur within one week of each other. No later than January 1, 2022, Eversource shall file a motion for Authority review, modification, and approval of its CG ERP, updated as ordered herein. 97 of 103 CT ERP Section Page 2.10.4, 9.2, Attachment 3 26, 81, 98 EP-ALL-ANX1000D, Customer Group Annex Rev 4
  8. Page 98 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 98 of 369 Emergency Response Plan Electric System Operations - CT Attachment 3 – Sample AAR Form (Sheet 1 of 1) EP-CT-ELEC-PLN-2000 98 of 103 Rev 4
  9. Page 99 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 99 of 369 Emergency Response Plan Electric System Operations - CT Attachment 4 – Eversource Contractor Daily Time Sheet (Sheet 1 of 3) EP-CT-ELEC-PLN-2000 99 of 103 Rev 4
  10. Page 100 of 369

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 4 Page 100 of 369 Emergency Response Plan Electric System Operations - CT Attachment 4 Eversource Contractor Daily Time Sheet (Sheet 2 of 3) Purpose. This Eversource Contractor Storm Daily Time & Work Report records details of emergency event time worked and worked performed by contractors. These sheets provide detail work documentation, and a reference for any invoicing. THIS TIMESHEET IS FOR USE ONLY UPON ARRIVAL ON EVERSOURCE PROPERTY AND SHOULD NOT BE USED FOR TRAVEL TIME FROM HOME BASE AND BACK TO HOME BASE. ONCE CONTRACTOR IS PUT TO WORK THE WORK RATE APPLIES FOR ALL HOURS WORKED (Travel, Standby, Work) Preparation. The authorized Eversource Representative ensures the Eversource Contractor Storm Daily Time & Work Report is completed and validated. It is signed by the Contractor Representative and submitted to and signed by Eversource Representative daily. Personnel should document time worked, relevant work that occurred and material used. Distribution. Blank Eversource Contractor Storm Daily Time & Work Report are provided to Contractor Representatives. The reports are submitted by the authorized Eversource Representative to the designated state-specific mailbox end of each day2. Notes: Use additional copies as continuation sheets as needed, and indicate pagination as used. Block # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2 Block Title Instructions State work was performed in Self-Explanatory Date Work Was Performed Self-Explanatory Storm Work Order Provided by the Eversource Representative Contractor Name Self-Explanatory Contractor Address Self-Explanatory Start Time Beginning of shift End Time End of shift Name Contractor employee name as it appears on roster Classification e.g., Lineman, Apprentice, etc. FOR BLOCKS 10, 11 & 12: TIME ENTERED IS PAID AT WORKING RATES HOURS Travel Time * Travel time to/from Hotel to Work Reporting Location and mobilizing and demobilizing to Eversource. Standby Time onsite waiting to be put to work. Work Time Time performing work (Restoration) Description Type of equipment or vehicle (e.g., Bucket Truck, Digger, Pickup Truck ID Equipment number or license plate Number Billable Hours Hours equipment or vehicle in use Expenses (e.g., meals, tolls) and Material charged back by contractor. DOES NOT INCLUDE MATERIAL Description PROVIDED BY EVERSOURCE. Qty (Quantity) Cost ($) or Item used (e.g., wire, bolt holder) [email removed], [email removed], [email removed] EP-CT-ELEC-PLN-2000 100 of 103 Rev 4

Text of EOE-010 Attachment 5.pdf

Extracted from the file · 108 pages · 301,258 characters

As listed on the current system

Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)