Interrogatory responses
Answers to questions 9, 10
Files7
EOE-009_final.pdf
PDF · 116 KB · 2 pagesText searchable
Download EOE-009_final.pdfRead the text of EOE-009_final.pdf
EOE-010_final.pdf
PDF · 110 KB · 1 pageText searchable
Download EOE-010_final.pdfRead the text of EOE-010_final.pdf
EOE-010 Attachment 1.pdf
PDF · 1.7 MB · 66 pagesText searchable
Download EOE-010 Attachment 1.pdfRead the text of EOE-010 Attachment 1.pdf
EOE-010 Attachment 2.pdf
PDF · 2.4 MB · 65 pagesText searchable
Download EOE-010 Attachment 2.pdfRead the text of EOE-010 Attachment 2.pdf
EOE-010 Attachment 3.pdf
PDF · 2.0 MB · 70 pagesText searchable
Download EOE-010 Attachment 3.pdfRead the text of EOE-010 Attachment 3.pdf
EOE-010 Attachment 4.pdf
PDF · 11 MB · 369 pagesText searchable
Download EOE-010 Attachment 4.pdfRead the text of EOE-010 Attachment 4.pdf
EOE-010 Attachment 5.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-010 Attachment 5.pdfRead the text of EOE-010 Attachment 5.pdf
Text of EOE-010 Attachment 2.pdf
Extracted from the file · 65 pages · 201,477 characters
Text of EOE-010 Attachment 3.pdf
Extracted from the file · 70 pages · 208,634 characters
Text of EOE-010 Attachment 4.pdf
Extracted from the file · 369 pages · 809,244 characters
Page 99 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 99 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 9 of 12) PURA Docket 2012 Rec Order # 4 (continued) PURA Docket No. 20-08-03 EP-CT-ELEC-PLN-2000 N/A 5 Performance Standard resource crew and Make Safe crew to each municipality that requests one according to its current policy. In the case of an Event Level 4 or higher, Eversource and UI shall make these resources available for municipalities no later than 12 hours after the storm has left the area. Additional line resources brought to bear for which a town no longer has need may, upon confirmation with the town, be allocated to restoration or to other duties. This requirement is not intended to prevent the EDCs from using all of its available crews to respond to higher priority needs to ensure public safety. c. Each EDC shall develop criteria such as, but not limited to, the number of damage locations as a percent of miles of main line primary in a town, or total miles of primary that would be applied to determine the deployment of available Make Safe liaisons and line crews to those towns that have the highest public safety and outage impact, in the event that, and only so long as, available resources are not sufficient to address all public safety priorities at the same time in all towns. This requirement is intended to allow the EDCs to use all available crews to respond to higher priority needs to ensure public safety. Such criteria shall be included in the emergency response plan and reviewed annually with each town. No later than June 30, 2021, Eversource shall review and update its CG ERP to incorporate all recent changes to its outage reporting channels and systems REFER TO CG ANNEX 99 of 108 CT ERP Section Page EP-ALL-ANX-1000D, Customer Group Annex Rev 5Page 100 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 100 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 10 of 12) PURA Docket 2012 Rec Order Performance Standard # PURA Docket No. 20-08-03 N/A 7 PURA Docket No. 20-08-03 N/A 8 EP-CT-ELEC-PLN-2000 No later than June 30, 2021, the EDCs are directed to individually collaborate with CIEC to develop and submit to the Authority for review, modification, and approval the following modifications to the EDCs’ emergency response activities relating to major customer accounts, which shall be incorporated into each EDC’s ERP upon approval: a. Solutions to better to support major accounts during emergency events; b. Formal after action reporting process for major accounts; and c. Formal emergency preparedness and response communications plan with account representatives. No later than June 30, 2021, the EDCs shall revise and file for the Authority’s review, modification, and approval timesheets or other documentation used to track work performed by external or contractor line crews and damage assessors during future storms. Such revised timesheet or other documentation shall include the following minimum set of information per shift: a. Number or amount of work performed; b. Description and location of work performed; c. Beginning and ending locations; d. Paid time spent traveling at start and end of shift; e. Paid time traveled for mobilization, demobilization, and standby time; and f. Employee names; dates; and hours worked. The timesheets/documentation templates shall be included as an attachment to each EDC’s public version of its ERP. 100 of 108 CT ERP Section Page Table 1 Table 2, 3.2, 3.10 17, 19, 34, 69 2.11.4, 3.5.2 31, Rev 5Page 101 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 101 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 11 of 12) PURA Docket 2012 Rec Order Performance Standard # PURA Docket No. 20-08-03 N/A 9 PURA Docket No. 20-08-03 N/A 10 EP-CT-ELEC-PLN-2000 No later than June 30, 2021, the EDCs shall separately submit in a report to the Authority for its review and approval findings from the EDCs’ outreach to municipalities to understand what information and best form(s) of communicating that information is most useful and actionable to the towns during the first 48 hours following an Event Level 3 or greater event. The report shall also include a proposed template for use during future storms to communicate this information to towns for the Authority’s review, modification, and approval. The Authority will subsequently release such report for public comment. Once approved by the Authority, the EDCs shall communicate any required changes to the current communications protocols to all municipal leaders in their service territory and shall incorporate such protocols into the EDCs’ respective ERPs. No later than June 30, 2021, the EDCs shall separately work with municipalities in their service territories to identify ways that reporting blocked roads could be improved using the current manual reporting system. The EDCs shall summarize the input received from the municipalities in a report to the Authority. The report shall also include proposed improvements to the current reporting system for the Authority’s review, modification, and approval. The EDCs are directed to submit for the Authority’s review and approval the report and the proposed improvements. Once approved, the EDCs shall communicate any required changes to the current reporting system to all municipal leaders in their service territory and shall incorporate such changes into the EDCs’ respective ERPs. 101 of 108 CT ERP Section Page Table 1 Table 2 3.2, 3.10 17, 19, 34, 69 3.2, 3.6, Table 1 Table 2 34, 53, 17, 19 Rev 5Page 102 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 102 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 12 of 12) PURA Docket 2012 Rec Order # Performance Standard No later than June 30, 2021, the EDCs shall submit to the Authority a revised standard template for its 60-Day After Action Reports submitted to the Authority pursuant to Section 3.7 of Appendix A of the Performance Standards Decision that includes a section to consider corrective actions and lessons learned regarding performance efficiencies or cost saving measures. Upon approval of the compliance materials filed in response to Order No. 9, and upon approval of the compliance materials filed in response to Order No. 10, the EDCs shall re-file their ERPs with any changes authorized by the Authority. For the sake of clarity, each EDC shall refile its ERP twice, unless the Authority’s approval of the compliance filings in questions occur within one week of each other. CT ERP Section Page 2.10.4, 9.2, Attachment 3 26, 85, 103 PURA Docket No. 20-08-03 N/A 11 PURA Docket No. 20-08-03 N/A 12 PURA Docket No. 20-08-03 N/A 13 No later than January 1, 2022, Eversource shall file a motion for Authority review, modification, and approval of its CG ERP, updated as ordered herein. EP-ALL-ANX-1000 D, Customer Group Annex 18 No later than September 30, 2022, the EDCs shall include in their respective ERPs appropriate protocols related to ISO-NE operating procedures as described in Section II.C.2., Incorporation of Winter Reliability Emergency Protocols into ERP. 6, Public Information (Communications & Media) Annex to the AHERP 79 19 No later than September 30, 2022, the EDCs shall include in their respective ERPs Utilities’ critical infrastructure information and point-of-contact information consistent with Section II.C.3., Plan to Address Other Utility Critical Infrastructure. 2.11.1, 3.11.2d 28, 74 20 No later than June 30, 2024, each EDC shall include a Cybersecurity disruption response component in its ERP submitted pursuant to Conn. Gen. Stat. § 16-32e as described in Section II.C.4., Incorporation of Cybersecurity Plan into ERP. TBD TBD PURA Docket No. 17-1203RE08 PURA Docket No. 17-1203RE08 PURA Docket No. 17-1203RE08 EP-CT-ELEC-PLN-2000 N/A N/A N/A 102 of 108 Rev 5Page 103 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 103 of 108 Emergency Response Plan Electric System Operations - CT Attachment 3 – Sample AAR Form (Sheet 1 of 1) EP-CT-ELEC-PLN-2000 103 of 108 Rev 5Page 104 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 104 of 108 Emergency Response Plan Electric System Operations - CT Attachment 4 – Eversource Contractor Daily Time Sheet (Sheet 1 of 3) EP-CT-ELEC-PLN-2000 104 of 108 Rev 5Page 105 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 105 of 108 Emergency Response Plan Electric System Operations - CT Attachment 4 Eversource Contractor Daily Time Sheet (Sheet 2 of 3) Purpose. In this Eversource Contractor Storm Daily Time & Work Report (also known as the “timesheet”), Contractor personnel must document emergency event time worked in the Eversource Service Territory, relevant work that occurred, and the material(s) used. These sheets provide a reference for invoicing. Do not include mobilization or demobilization information on this timesheet (see Eversource Contractor - Storm Mobilization & Demobilization Time Report). Distribution. Eversource personnel provide blank timesheets and instructions to Contractor representatives. Submission. Each day, the Contractor representative must submit the completed timesheet to Eversource. The authorized Eversource representative verifies the time worked and provides their approval signature. The timesheets must be submitted to the designated state-specific mailbox2 daily. The Contractor must submit the Eversource-approved timesheet with their invoice. Notes: Use additional copies as continuation sheets as needed, and indicate pagination as used. Block # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Block Title Instructions Self-Explanatory. NOTE: If moved to another state within Eversource’s territory, start a new timesheet. Include travel time to the other State on the new timesheet in Block 10. Date Work Was Performed Self-Explanatory Storm Work Order Provided by the Eversource Representative Contractor’s Name Contractor Company Name Contractor’s Address Contractor Company Address Start Time Beginning of shift End Time End of shift Name Contractor employee name as it appears on roster Classification e.g., Lineman, Apprentice, etc. FOR BLOCKS 10, 11, 12, 15 & 17: TIME ENTERED IS PAID AT NOGOTIATED RATE HOURS AND ALLOWED EXPENSES Travel time to/from hotel and work reporting location and/or between Eversource service territories. Include Travel Time travel time to the new state on that respective state’s timesheet (see Block 1). DO NOT INCLUDE MOBILIZATION & DEMOBILIZATION TRAVEL TIME. Standby Time onsite waiting to be put to work Work Time Time performing work (Restoration) Description (Equipment) Type of equipment or vehicle (e.g., Bucket Truck, Digger, Pickup Truck) Vehicle ID Equipment number or license plate number Billable Hours Number of hours equipment or vehicle was in use State Work was Performed In Signature by Eversource constitutes acknowledgment of receipt of invoice/time sheet; but Eversource reserves the right to further review and audit this document and the associated charges, and seek reimbursement of any amounts that are found to be over-billed or inaccurate. 2 [email removed], [email removed], [email removed] EP-CT-ELEC-PLN-2000 105 of 108 Rev 5Page 106 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 106 of 108 Emergency Response Plan Electric System Operations - CT Attachment 4 Eversource Contractor Daily Time Sheet (Sheet 3 of 3) Block # 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Block Title Description (Expense & Material) Qty (Quantity) Unit of Measure Total of Hours OMS Event Number Location Circuit Description of Work Event Start Time Event End Time Contractor Representative Contractor Signature Telephone Number Date Approved by Eversource Representative Eversource Representative Signature Date Instructions Expenses (e.g., meals, tolls) and material charged back by Contractor. DO NOT INCLUDE MATERIAL PROVIDED BY EVERSOURCE. Cost ($) or Item used (e.g., wire, bolt holder) e.g., feet, each (N/A for expenses) Sum of Columns 10, 11 & 12 & 15, respectively Provided by Eversource Dispatcher Location work performed in – For Line, Tree, or Service FOR DAMAGE ASSESSORS ONLY: Circuit being assessed for damage e.g., replacement of pole/pole top, transformer, wire) Dispatch time for event Time work was completed on the event Printed Name of Authorized Contractor Representative Approval Signature of Authorized Contractor Representative Phone Number of Authorized Contractor Representative Date signed by Authorized Contractor Representative Printed Name of the Authorized Eversource Representative. NOTE: the Authorized Eversource Representative approves time, work, and the material used, NOT the rate(s). Approval Signature of Authorized Eversource Representative Date signed by Authorized Eversource Representative Signature by Eversource constitutes acknowledgment of receipt of invoice/time sheet; but Eversource reserves the right to further review and audit this document and the associated charges, and seek reimbursement of any amounts that are found to be over-billed or inaccurate. EP-CT-ELEC-PLN-2000 106 of 108 Rev 5Page 107 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 107 of 108 Emergency Response Plan Electric System Operations - CT Attachment 5 – LSC Customer Group Event Checklist (Sheet 1 of 2) Date: Event Day: Time: Operating Co(s): ITEM Event Name: Call Center(s): REQUIRED ACTION RESPONSIBLE PARTY COMMENTS PRE-EVENT ACTIVITIES Prior to any anticipated storm, the Company contacts all life support customers, using existing automated messaging channels, more than 24 hours in advance of the anticipated storm event. 01 02 EP-CT-ELEC-PLN-2000 Customers are: Notified of an impending storm or weather event. Made aware that there may be widespread damage, and to be prepared. • Advised that our crews are preparing for storm response. • Provided with resources available to them, if needed, such as the Red Cross. • • The company uses reporting to track the number of customers who answered the pre-storm call, received a voicemail message, hung up, or had a non-working number. 107 of 108 CG Message Delivery Complete CG Message Delivery Complete Rev 5Page 108 of 108
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 108 of 108 Emergency Response Plan Electric System Operations - CT Attachment 5 – LSC Customer Group Event Checklist (Sheet 2 of 2) DURING EVENT 03 04 05 During the outage restoration event, the company tracks the status of electrical service of all life support customers through its outage management system reporting. Eversource provides an updated file each day of life support customers without power to the municipality officials. The company runs daily outbound calling campaigns to Life Support customers to provide each an update on the status of their outage. Various Eversource ERP Teams Complete Community Liaison Group Complete CG Message Delivery/ Concierge Team/ Community Liaisons Complete CG Message Delivery/ Concierge Team Complete POST-EVENT 06 EP-CT-ELEC-PLN-2000 Following substantial completion during a storm event, the customer group obtains a list of all life support customers that were impacted during the event, and does a final, outbound calling campaign to all these customers. Depending on the number of customers impacted, this campaign will either be live outbound using CSR, or automated with an option to receive a call back from a CSR. The messaging confirms that power has been restored and thanks customers for their patience. Should the customer require any further assistance, CSRs address the customer’s needs and/or escalate the situation, as warranted. 108 of 108 Rev 5
As listed on the current system
Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026