Text of EOE-010 Attachment 2.pdf

Extracted from the file · 65 pages · 201,477 characters

Text of EOE-010 Attachment 3.pdf

Extracted from the file · 70 pages · 208,634 characters

Text of EOE-010 Attachment 4.pdf

Extracted from the file · 369 pages · 809,244 characters

  1. Page 41 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 41 of 108 Emergency Response Plan Electric System Operations - CT Figure 4 – Example Operations Section IMT Structure ICC ICC Incident Commander Operations Section Chief IMT Operations Section ICC Assistant Operations Section Chief ICC Operations Analyst EOC ICC EOC ICC Transmission Branch Director Operations Branch Director Vegetation Management Unit Leader F EOC EOC ICC/F Field Group Manager Operations Group Manager Vegetation Management Coordinator Substation Group Manager EOC Field Supervisors Dispatch Supervisor OMS Support Specialist Field Supervisors Dispatch Supervisor EOC/ AWC EOC/ AWC Operations Coordination Support Specialist RMT System Operator Service Crew Group Manager Central Location Central Location Wire Guard Unit Leader Service Crew Unit Leader Central Location F/AWC Central Location F/AWC Wire Guard Coordinator Wire Guard Field Coordinator Service Crew Coordinator Service Crew Supervisor F EOC/ AWC RMT Operations Coordinator Central Location Wire Guard Group Manager Group Manager Field Communications and Engineering TOC Dispatch Group Manager Central Location Substation Branch Director (CT/MA only) Service Crews Wire Guard Field Supervisors Restoration Management Team [EOC] LOCATION KEY: ICC – INCIDENT COMMAND CENTER EOC – EMERGENCY OPERATIONS CENTER TOC – TRANSMISSION OPERATIONS CENTER F - FIELD 3.3.2 Operations Section Roles and Responsibilities The basic functional areas of ICS (such as Operations or Logistics) may be expanded or contracted to meet requirements as an event progresses. Consistent with ICS principles, the IMT may be partially or fully implemented, in anticipation of a significant event or in response to an actual event. Selective implementation through the activation of one or more of the system’s components allows maximum flexibility in meeting the unique operational requirements of the situation. a. Operations Section Chief Based in the ICC when activated and reporting to the IC, the Operations Section Chief is responsible for overseeing the conversion of the IAP’s strategic goals into executable tactical plans that implement the Company’s restoration priorities. The Operations Section Chief monitors the overall effectiveness of the field restoration activities to accomplish the stated IAP goals. The Operation Section Chief collects and disseminates information pertaining to the overall operational progress and direction among the Operations Section Branch Directors in the ICC and the Regional EOCs and closely collaborates with the Planning and Logistics Section Chiefs to ensure that the required resources are being effectively obtained, allotted, and appropriately cared for. EP-CT-ELEC-PLN-2000 41 of 108 Rev 5
  2. Page 42 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 42 of 108 Emergency Response Plan Electric System Operations - CT b. Operations Branch Director Located in a Regional EOC and reporting to the Operations Section Chief, the Operations Branch Director oversees the overall readiness and operational capability of the Regional EOC, including coordination and communications with all functional areas that support the Regional EOC and other RMT locations. In partnership with the Community Liaison Unit, ensures that community priorities and critical care customer issues are being addressed. c. Substation Branch Director Based in the ICC or a Regional EOC and reporting to the Operations Section Chief, the Substation Branch Director has the overall responsibility to support the safe and reliable operation and restoration of the substations and communications equipment. d. Operations Group Manager The Operations Group Manager has direct management responsibilities and oversight of the Restoration Management Teams (RMTs) assigned to the EOC. The Operations Group Manager also manages (pre-activation, during activation, and post-activation) the overall readiness and operation of the assigned RMTs, including coordination and communications with the Community Liaison Unit. The Operations Group Manager is responsible for ensuring that all communications and restoration processes are being implemented as consistent with the ERP; ensures equipment is set up and operational; shift schedules for all RMT resources are developed; and the process is operating efficiently; ensures vegetation management issues are coordinated with RMTs; and in partnership with the Community Liaison Unit Leader, ensures that community priorities are being addressed and that the RMTs are coordinating and prioritizing with municipal restoration efforts accordingly. e. RMT Operations Coordinator Located in an RMT and reporting to the Operations Group Manager, the Operations Coordinator is responsible for implementing and overseeing the tactical restoration processes in coordination with field supervision. To accomplish this, the Operations Coordinator works closely with the Planning Branch Director, the Logistics Branch Director, and the Community Liaison Unit Leader to ensure the RMTs’ restoration goals and objectives are met and that the restoration crews and the IMT organization’s situational awareness is maintained up to date during the restoration process. f. RMT System Operator The System Operator prepares switching orders to support a restoration effort for a designated geographic area. As part of an RMT, they model the OMS to match the actual distribution system configuration related to switching evolutions, and enter and update information in the OMS, working closely with the Operations Coordinator and Operations Coordination Support Specialist. They prepare and issue switching orders and clearances unless controllership has been transferred to the field. g. Operations Coordination Support Specialist The Operations Coordination Support Specialist works collaboratively as part of the RMT with the Operations Coordinator and System Operator to identify call patterns in the OMS to validate and confirm outage locations. Using data modeling techniques, Operations Coordination Support Specialist determine what is happening on the system within their assigned zone and consolidate events in the OMS to accurately reflect conditions in the field. The Operations Coordination Support Specialist keeps the OMS up to date, including the model, ETRs and event status – enroute, ETA, onsite, or complete. EP-CT-ELEC-PLN-2000 42 of 108 Rev 5
  3. Page 43 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 43 of 108 Emergency Response Plan Electric System Operations - CT h. Vegetation Management Unit Leader The Vegetation Management Unit Leader is responsible for management and coordination of the vegetation management crews in their assigned region, working closely with the RMTs to ensure safe and efficient clearing of downed branches and trees. The Vegetation Management Unit Leader oversees contractor personnel performing tree cutting and clearing during emergency conditions to aid line crews in the restoration of service to customers. i. Assistant Operations Section Chief The Assistant Operations Section Chief manages and oversees the Wire Guard process by ensuring a Wire Guard is sent to stand by potential electrical hazards. Also manages and coordinates the deployment of Service Crews focused on the restoration of residential electrical services. 3.4 Planning Section The Planning Section evaluates all available information and, working with other Incident Command functions, develops and publishes an IAP. The IAP sets forth, among other items, the objectives and deliverables for each operational period. The Planning Section incorporates the guiding principles set forth in this ERP into the development of the IAP to ensure that the needs and expectations of customers are met. 3.4.1 Planning Section Organizational Structure The Planning Section is directed by the Planning Section Chief, who is a member of the General Staff. In a larger emergency event, there is a Planning Branch Director in each activated Regional EOC to coordinate with the Operations Branch Director, Logistics Branch Director, and any RMT Operations Coordinators. Independent of the scope of the emergency event, the Planning Section Chief has responsibility and accountability for all planning functions in preparation for and in response to an emergency event. To assist with these functions, the Planning Section Chief may activate additional job positions. An example of a Planning Section organization is provided in Figure 5. EP-CT-ELEC-PLN-2000 43 of 108 Rev 5
  4. Page 44 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 44 of 108 Emergency Response Plan Electric System Operations - CT Figure 5 – Example Planning Section IMT Structure IMT Planning Section ICC Electric Incident Commander ICC Planning Section Chief ICC ICC Planning Branch Director Transmission Planning Branch Director Forecasting EOC Planning Branch Director Tactical EOC/AWC ICC Transmission Support Specialist ICC ICC ICC Planning & ETR Specialist Event Statistician Specialist GIS Specialist LOCATION KEY: AWC AWC Damage Assessment Coordinator Planning Modeler F Damage Assessment Patroller ICC – INCIDENT COMMAND CENTER EOC – EMERGENCY OPERATIONS CENTER AWC – AREA WORK CENTER F - FIELD 3.4.2 Planning Unit Leader - Tactical Planning Section Roles and Responsibilities The Planning Section is responsible for maintaining, gathering, and disseminating information on the current and forecasted situation and the status of resources assigned to the incident, as well as preparing plans and maps a. Planning Section Chief The Planning Section Chief, in collaboration with the IC and other Command and General Staff personnel, is responsible for developing and recommending the overall restoration strategy, including ETRs based on current resources available, damage assessment data, and current and forecasted weather conditions. Oversees the execution of the damage assessment process and the development of situation and resource status information. Collaborates with the Operations and Logistics Section Chiefs to determine resource requirements, allots and tracks all emergency event resources once activated or checked in, and develops each operational period’s IAP. Ensures the OMS ETRs and Global Restoration Messaging are maintained, up to date and accurate, and ensures reporting to regulators is completed as required. EP-CT-ELEC-PLN-2000 44 of 108 Rev 5
  5. Page 45 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 45 of 108 Emergency Response Plan Electric System Operations - CT b. Planning Branch Director – Forecasting The Planning Branch Director – Forecasting oversees the collection, analysis, estimating and reporting of pre- and post-impact system data to provide situational awareness to the Planning Section Chief, IC, and other members of the IMT. The Planning Branch Director – Forecasting is responsible for ensuring the timely updating of models and dashboards and for analyzing, determining, and maintaining the current ETR for the overall state, regions, RMTs, and towns in the IMT’s area of responsibility. Along with determining ETRs, the Planning Branch Director – Forecasting collaborates with the Planning Branch Director – Tactical on priorities and with the Communications Officer to develop and publish the Global Restoration Messages, once they are approved. c. Planning Branch Director – Tactical The Planning Branch Director – Tactical is responsible for overseeing the Region’s Rapid and Detailed damage assessment (DA) processes once the Incident Commander has declared it safe to proceed with DA and the restoration process. The Planning Branch Director – Tactical verifies and collaborates with the Operations Branch Director to ensure that the resources that have been allotted are distributed appropriately among the RMTs and develops high level tactical plans to be implemented. As the restoration event nears completion, is responsible for developing a strategy for releasing external resources, internal resources, and support staff, in the most efficient and cost effective manner. 3.4.3 Incident Action Plan The Planning Section Chief ensures the IAP is completed and regularly updated by gathering input from appropriate organizations including the IC and Command and General Staff throughout the entire incident. Emergency incidents vary in type, complexity, size, and requirements for detailed and written plans. In an initial response for an incident that is readily controlled, a written plan might not be necessary. Larger, more complex incidents require that a formal, documented IAP is developed to coordinate activities. The level of detail required in an IAP also varies according to the size and complexity of the response. For incidents in which an IAP is prepared, the Plan must be accurate and capture the information generated during the planning process. Coordination with the Logistics Section is required to ensure the Plan can be executed. The Plan is prepared and distributed prior to the Operations briefing and a revised Plan is prepared for each Operational Period. An IAP should consider the strategic, operational, and intangible elements of the incident and include coordination with internal stakeholders. The Planning Section establishes and publishes the IAP that generally: • • • • • EP-CT-ELEC-PLN-2000 Identifies the Operational Period Defines goals for the Operational Period Identifies personnel in key IMT positions Describes weather conditions and forecasts – taking into consideration the impacts that current or future weather could have on the response to the event Communicates a timely and relevant Safety Message to all resources in the Electric Service territory, as provided by the Safety Officer or their designee 45 of 108 Rev 5
  6. Page 46 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 46 of 108 Emergency Response Plan Electric System Operations - CT 3.4.4 Damage Assessment & Situational Awareness During the response to a significant emergency event, damage assessment is a critical component that drives important response actions, including acquiring mutual aid resources; procuring additional material supplies; generating ETRs; and identifying an effective restoration strategy. The Damage Assessment process begins only once the Incident Commander has declared it safe to proceed. Fundamentally, damage assessment is a core component of the Planning function, and, in conjunction with other relevant information, is used to develop an IAP that is executed by the various functions, including Operations, engaged in the storm response. Specifically, damage assessment determines, among other things, the number and locations of blocked roads; the amount of physical damage caused by an event; including the number and locations of broken poles; the number and locations of damaged transformers and oil spills; the number and locations of wires down; and the number and locations of tree and tree limb damage. This information is critical in developing an IAP and deciding to acquire mutual aid or deploy additional support personnel. Furthermore, this information is helpful to inform the Logistics Section of potential needs (such as, materials and equipment) and to drive specific emergency response processes (for example, wires down). Damage Assessment Patrollers are used to assess the condition of the distribution system to identify possible hazards and equipment damage. Damage information is communicated from the field in the most efficient and effective manner using electronic means, if available, or paper assessment forms. The damage assessment process uses three types of damage assessments: • • • 3.4.5 Rapid Survey - This assessment utilizes a representative sampling of pre-selected circuits on the Distribution System, following a major emergency event, which can be extrapolated to provide an overall magnitude of damage, including an approximation of the number of events, broken poles, sections of wire down, and damaged oil filled equipment. Detailed Survey - There are two methods of performing the comprehensive survey as determined by the strategy developed by the Planning Section Chief: o Circuit Based - This is an assessment of an entire circuit where multiple events have been reported to determine the extent of damage and to confirm the actual number of events. o Event Based - This is an assessment of events at reported locations to determine the extent of damage. Post-Event Survey - This assessment is performed after-restoration but prior to releasing resources and is intended to identify any remaining work to restore the system to its normal configuration. It also includes the identification and documentation of any remaining Electric System debris or other hazards that require attention and services where temporary repairs were made to restore power. Work Estimating and Prioritization The Planning Branch Director - Forecasting uses information that is provided by the Damage Assessment teams to estimate the amount of work that is necessary to restore service to customers. This is done by allocating proxy man hour requirements to each trouble order that is evaluated by the damage assessment process. This information is aggregated to determine the overall resource requirement to restore service to customers. This information helps determine the global ETR and also whether additional resources are required to support the restoration process. EP-CT-ELEC-PLN-2000 46 of 108 Rev 5
  7. Page 47 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 47 of 108 Emergency Response Plan Electric System Operations - CT In addition, trouble orders are prioritized based on pre-established priority guidelines, which help guide the order in which trouble orders and circuits are responded to and restored. This information is presented to Operations personnel to guide their allocation of emergency response resources. 3.4.6 Estimated Times to Restoration and Restoration Projections Estimated Time to Restoration is a critical piece of information throughout the course of an emergency event. Eversource uses algorithms based on available objective and observational inputs to develop Global and/or Town ETRs. Early in an event, data is less available than in the later stages, thus, as the restoration progresses, more accurate estimates may be derived. Regional Planning Branch Directors work closely with the Regional Operations Branch Directors to relay important information necessary to maximize the accuracy of ETRs reported to customers and are strategically placed in the EOCs to relay important information necessary to maximize accuracy. A Global ETR is an overall estimate of the number of days required during a widespread outage event to restore 99% of all Eversource customers served. A Town ETR is an overall estimate of the number of days required to restore 99% of all Eversource customers served in a given town during a town-wide outage event. An Event ETR is an estimate of the time required to restore customers associated with a specific event or trouble spot. a. ETR Development Early in the process, the Planning Section Chief oversees the development of a planning estimate that is used to guide the Logistics team in securing resources, determining the maximum number of travel days; and determining the number of mutual aid crews needed. Once the storm has passed and the number of customers interrupted has peaked, the Planning Section develops restoration projections based on: o o o o o The number of trouble locations The relative geographic scope of those locations The condition of the transmission system The number of circuit breakers and reclosers affected The number of service-related trouble spots Trouble locations involving breakers and reclosers may have a multiplying effect on the restoration projection calculations, because these typically have additional trouble locations nested downstream. The number of service-related trouble spots also has an effect on the type of crews needed. Varying types of damage are also considered in determining the restoration projection and time to restore each trouble spot. Lightning, wind, ice, make-safe issues, and transmission involvement all have an effect on and are considered in the calculations. Another important parameter is the number of crews that are confirmed to be available, working in conjunction with the Logistics Section Chief. Considering all these parameters together helps the Company develop reasonably accurate global ETRs. Restoration projections are intended to be estimates that provide a guide for restoration planning and communications with stakeholders. The OMS System is used to create and manage both Global and Town level ETRs. Event specific ETRs are the responsibility of the Operations Section Chief and RMT Operations Coordinator and are normally created when crews are dispatched to the associated work location. EP-CT-ELEC-PLN-2000 47 of 108 Rev 5
  8. Page 48 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 48 of 108 Emergency Response Plan Electric System Operations - CT b. ETR Monitoring The Planning Section Chief continuously gathers data, monitors conditions, and recalculates the global ETRs to achieve the best possible accuracy. c. Communication of ETRs Global ETRs are approved by the IC, in consultation with the President, prior to publication. The OMS System is used to create and manage Global level messages and Town level messages and projections. The system also has the ability to view the status of Event level messages and projections; event level messages are created and managed through the OMS. For event specific ETRs, customers receive the message and projection that is available at the most detailed level. The same information is provided to the customer from the Integrated Voice Response (IVR) system, company website, and Customer Care Center representatives, according to the customer’s preferred channel (any combination of voice, email, and text messaging the customer chooses). If there is an event-level message and projection, the customer is provided with this ETR. If an event-level message and projection are not available, then the customer receives the Town message and projection. Lastly, if neither the Event Level nor Town level ETR is available, the customer receives the Global level ETR message. ETR Messaging is dependent upon whether Eversource is operating in a Blue Sky, Gray Sky, or Black Sky mode: 1) Blue Sky Messaging ▪ An initial message with an ETR is sent to the customer’s channel of choice 15 minutes after the customer reports the outage ▪ If the ETR that was initially sent is changed by +/- 45 minutes, the customer is notified of the updated ETR ▪ When the outage is closed in OMS, a notification is sent to the customer, indicating that their power should have been restored ▪ There is no Global message during Blue Sky operation 2) Gray Sky Messaging ▪ An initial message (without an ETR) is sent to the customer’s channel of choice 30 minutes after the customer reports the outage, indicating that Eversource is aware of their outage and will provide more information when it becomes available ▪ When crews are on-site and provide a High Confidence ETR, the ETR is communicated to the customer ▪ When the event is updated in OMS with an ETR marked G (Global), the customer is sent a Global ETR message, including a description of what Global means ▪ When the outage is closed in OMS, a notification is sent to the customer, indicating that their power should have been restored 3) Black Sky Messaging ▪ ▪ ▪ EP-CT-ELEC-PLN-2000 An initial message (without an ETR) is sent to the customer’s channel of choice 60 minutes after the customer reports the outage, indicating that Eversource is aware of their outage and is experiencing a high volume of outage in the customer’s area The customer is sent a Global ETR message when the event ETR is marked as G in OMS, including a description of what Global means No ETR update or power restored notifications are sent to the customer 48 of 108 Rev 5
  9. Page 49 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 49 of 108 Emergency Response Plan Electric System Operations - CT 3.5 Logistics Section The Logistics Section, led by the Logistics Section Chief, supports and coordinates with other Command Staff and the IC to ensure that all organizations responding to an event are adequately supported. During a significant event, the Logistics Section is responsible for a variety of tasks, including, but not limited to: • Establishing and maintaining Satellite locations and Staging Areas • Supplying and replenishing necessary materials • Feeding, lodging, and ensuring the welfare of Company and restoration personnel • Fueling and maintaining vehicles and equipment • Supplying vehicles and specialty equipment needed to support the restoration • IT and Communications support services 3.5.1 Logistics Section Structure The Logistics Section is directed by the Logistics Section Chief who is a member of the General Staff and reports directly to the IC. In a major event, the Logistics section is composed of three branches: • • Services (Food & Lodging, Materials Logistics, Fleet Services, IT/Telecommunications, Staging Areas, Property Management, Security, Environmental, Procurement) Support (on-site coordination at the Regional EOCs and designated AWCs/Satellites, as appropriate) The Logistics Section Chief operates out of the ICC and ensures coordination with all Branch Directors throughout the preparation for, response to, and recovery from the event. An example of the Logistics Section organization is provided below in Figure 6. EP-CT-ELEC-PLN-2000 49 of 108 Rev 5
  10. Page 50 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-010 Attachment 5 Page 50 of 108 Emergency Response Plan Electric System Operations - CT Figure 6 – Example Logistics Section IMT Structure IMT Logistics Section ICC Logistics Section Chief ICC EOC Logistics Services Branch Director Logistics Support Branch Director ICC ICC ICC ICC Food & Lodging Services Unit Leader Material Logistics Services Unit Leader Fleet Services Unit Leader Staging Area Services Unit Leader Material Logistics Unit ICC Fleet Services Unit F&L Coordinator ICC ICC CT & MA Only IT/ Telecom Services Unit Leader Environmental Services Unit Leader NH Food & Lodging Coordination Is Within Logistics Support F Staging Area Supervisor F Staging Area Specialist IT Unit Telecom Unit ICC Security Services Unit Leader Security Unit EOC/AWC Logistics Support Unit Leader EOC/AWC Logistics Support Specialist Environmental Unit ICC Property Management Services Unit Leader Property Management Unit LOCATION KEY: Real Estate Unit ICC Procurement Services Unit Leader ICC – INCIDENT COMMAND CENTER EOC – EMERGENCY OPERATIONS CENTER AWC – AREA WORK CENTER F - FIELD Page 6 old Procurement Unit 3.5.2 Logistics Section Roles and Responsibilities Logistics activities are organized to efficiently assign critical services and resources when and where they are needed. In a higher-level event, there are two Logistics Branches: Services and Support. The Logistics Services Branch provides the various supporting services and resources throughout the IMT organization, and the Logistics Support Branch Directors and Unit Leaders (assigned to Regional EOCs) to ensure their Operations Section and Planning Section counterparts receive all the logistics services needed to effectively and efficiently carry out response activities and support the IAP. The Logistics Section provides support to the Gas IMT when it is activated. a. Logistics Section Chief The Logistics Section Chief ensures that all incident resources needed to support the strategic and tactical execution of incident objectives are made available. The Logistics Section Chief oversees the Logistics Section, which is organized into two Branches: Services and Support. Duties include: o o EP-CT-ELEC-PLN-2000 Ensure adequate logistics support for the EOCs and RMTs Obtain periodic updates from the Logistics Branch Directors on the status of resource requests and other logistics requirements 50 of 108 Rev 5

As listed on the current system

Question(s) Answered 9, 10 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026