Interrogatory responses
Answers to questions 119, 121
Files8
EOE-119_final.pdf
PDF · 135 KB · 4 pagesText searchable
Download EOE-119_final.pdfRead the text of EOE-119_final.pdf
EOE-119 Attachment 1.pdf
PDF · 2.9 MB · 176 pagesText searchable
Download EOE-119 Attachment 1.pdfRead the text of EOE-119 Attachment 1.pdf
EOE-119 Attachment 2.pdf
PDF · 1.2 MB · 39 pagesText searchable
Download EOE-119 Attachment 2.pdfRead the text of EOE-119 Attachment 2.pdf
EOE-121_final.pdf
PDF · 112 KB · 1 pageText searchable
Download EOE-121_final.pdfRead the text of EOE-121_final.pdf
EOE-121 Attachment 1.pdf
PDF · 119 KB · 2 pagesText searchable
Download EOE-121 Attachment 1.pdfRead the text of EOE-121 Attachment 1.pdf
EOE-121 Attachment 1.xlsx
Excel · 30 KBText searchable
Download EOE-121 Attachment 1.xlsxRead the text of EOE-121 Attachment 1.xlsx
EOE-121 Attachment 2.pdf
PDF · 100 KB · 1 pageText searchable
Download EOE-121 Attachment 2.pdfRead the text of EOE-121 Attachment 2.pdf
EOE-121 Attachment 2.xlsx
Excel · 25 KBText searchable
Download EOE-121 Attachment 2.xlsxRead the text of EOE-121 Attachment 2.xlsx
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-02 Date Issued August 07, 2026 EOE-119 Page 1 of 4 Date Filed: August 21, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM PURA ORDERS) Provide a detailed listing of all storm-related PURA Orders or Guidance, including cites, that supports the incremental storm costs included within the docket. Additionally, provide copies of each of the applicable documents with references to the specific sections that apply. Response: This request poses an impossible task in that PURA has addressed numerous aspects of the recovery of costs and the factual and legal parameters relevant thereto, in innumerable decisions spanning decades and the Company relies on that body of precedent as a whole. For purposes of responding to this request, the Company has identified the directives issued in PURA’s most recent proceeding (Docket No. 25-12-13) addressing storm-related costs and explains the manner in which the Company has complied, or will comply, with those directives. Please refer to EOE-119, Attachment 1, for a copy of the Docket No. 25-12-13 Decision (or the “2026 Storm Decision”). Docket No. 25-12-13 Directives Directive Page Compliance No later than August 31, 2026, the Company shall submit in Docket No. 26-05-10, an updated storm deferral balance calculating the catastrophic storm The Company plans to file the reserve accruals starting January 1, 2024, and through 144 updated storm deferral balance at least the start of the Company’s proposed rate year as directed by August 31, 2026. as specified in that proceeding, as discussed in Section III.H, Catastrophic Storm Costs Reserve Accruals.Page 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-02 Date Issued August 07, 2026 EOE-119 Page 2 of 4 Docket No. 25-12-13 Directives Directive Page Compliance No later than August 31, 2026, the Company shall submit documentation clarifying its policies governing the transition from standby status to emergency response work status as discussed in The Company plans to file the Section III.F.3.e, Standby Billing for Labor. The specified document as directed documentation shall demonstrate that vendor by August 31, 2026, but should instructions, contractual provisions, and billing 144 it need an extension, it will practices are applied consistently. The Company may request one consistent with the request an extension to this order, but any such request requirements in the Decision. must be accompanied by a status report, including scope of contractual amendments necessary and a proposed timeline for completion of those amendments. No later than August 31, 2026, the Company shall, in consultation with the OCC, submit to the Authority for review and approval a revised compensation policy that permits ERP Awards only for ERP Level 3 events or more severe, consistent to the greatest extent The Company plans to file a 144 response by August 31, 2026. possible with its New Hampshire and Massachusetts affiliates, and that excludes a minimum of nine overtime hours before an ERP Award applies, as discussed in Section III.F.2.b, Exempt Employee Emergency Response Plan Payments. No later than November 20, 2026, the Company shall submit in Docket No. 26-05-10: (a) a report on Eversource’s evaluation of options to replace the manual, paper-based contractor timesheet process with an electronic field time-capture system, as described in Section III.C.2, Accounting and The Company plans to file the Operational Controls; and (b) a plan to evaluate and 145 report and plan as directed by score the performance of its contractors, FRCs, and November 20, 2026. arborists against the timesheet requirements, which shall consider implementation of the factors regarding the completeness and timeliness of the contractors’, FRCs’, and arborists’ timesheets, as identified in Section III.C.3.b, Eversource Timesheets.Page 3
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-02 Date Issued August 07, 2026 EOE-119 Page 3 of 4 Docket No. 25-12-13 Directives Directive Page Compliance No later than November 30, 2026, the Company shall submit in Docket No. 26-05-10 an analysis of whether the storm fleet has provided a maximum positive The Company plans to file the benefit to ratepayers, including an evaluation of 145 analysis as directed by whether the storm fleet has provided net benefit to November 20, 2026. ratepayers for the catastrophic storms under review in that proceeding, as discussed in Section III.F.6.a, Storm Fleet. No later than December 31, 2026, Eversource shall update its Expense Policy to identify meal stipend criteria and to include the following two requirements: The Company is currently (1) supporting documentation for the calculated 145 assessing the steps necessary to number of meal stipends; and (2) an affirmation from comply with this directive. each employee to confirm that they did not receive a Company-provided meal, as discussed in Section III.F.7.a, Meal Stipends. No later than April 1, 2027, Eversource shall comply with mileage reimbursement requirements as outlined in Section III.F.7.b, Employee Mileage. In the Company’s next application to amend its base distribution rates, the Company shall separately account for prestaging and non-prestaging costs, if the Company is requesting recovery of prestaging costs, as discussed in Section III.E.2, Remediation and Materials Costs. 145 The Company is currently assessing the steps necessary to comply with this directive. 145 The Company is not seeking recovery for any pre-staging costs in Docket No. 26-05-10. The Company keeps separate FERC Accounts for both the catastrophic storm costs and pre-staging event costs. In addition to the Directives listed above, in the 2026 Storm Decision, PURA directed the Company to propose in Docket No. 26-05-10, a modification to the regulatory framework for deferred storm expenses (2026 Storm Decision, at 37). Consistent with that directive, the Company proposed a modified storm cost-recovery framework in this proceeding. The details of that proposal are set forth in Exhibit CLP-ELP-1 at pages 122-156. In addition, in this proceeding, as discussed in Exhibit CLP-STORM-1 at page 87, the Company adjusted by 25 percent the cost of small tools included in its requested recovery in this proceeding. This adjustment is reflected in the cost exhibits for each storm event, specifically Exhibits CLP-STORM-ACCT-2 (CLP-1 through CLP-14), “Materials” tab. The Company madePage 4
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-02 Date Issued August 07, 2026 EOE-119 Page 4 of 4 this adjustment based on PURA’s precedent in Docket No. 18-11-12 (the “2019 Storm Decision”). In the 2019 Storm Decision, PURA determined that a portion of the costs of tools, supplies, and personal protective equipment (“PPE”) should be considered normal operating expenses and, accordingly, found it reasonable to disallow 25 percent of those costs. 2019 Storm Decision, at 13-14. The Company has maintained this approach in this filing. Please refer to EOE119, Attachment 2, for a copy of the 2019 Storm Decision. After the Company filed its testimony in this proceeding, PURA issued the 2026 Storm Decision. In that decision, PURA found that 25 percent of materials expenses were nonincremental and therefore not eligible for deferral. 2026 Storm Decision, at 54, 107-109. The 2026 Storm Decision, however, differs from the 2019 Storm Decision in an important respect, which is that, rather than limiting the adjustment to categories such as tools, supplies and PPE, PURA applied the 25 percent adjustment to materials expenses generally. The Company’s proposal in this case is consistent with the fact that the more targeted approach reflected in the 2019 Storm Decision is appropriate. The relevant inquiry is whether the costs were incremental to the storm event, and the various categories of materials do not necessarily have the same characteristics for purposes of that determination, which is the implication of PURA’s decision in the 2026 Storm Decision. In particular, tools and durable goods may be reusable after the completion of storm restoration activities and therefore may provide benefits beyond the particular storm event for which recovery is sought. Those costs are fundamentally different from materials that are consumed in the restoration process and have no continuing utility following the storm. Accordingly, in this proceeding, the Company is requesting that PURA apply the targeted approach from the 2019 Storm Decision and limit the 25 percent adjustment to those categories of materials that may reasonably be considered reusable or otherwise part of the Company’s normal operating expenses, including tools and durable goods. Applying the 25 percent adjustment indiscriminately to all materials would overstate the portion of the Company’s storm-related costs that is properly characterized as non-incremental and would fail to account for the differing nature and use of the materials included in the Company’s request.
Text of EOE-121 Attachment 1.pdf
Extracted from the file · 2 pages · 13,183 characters
Text of EOE-121 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of EOE-121 Attachment 2.pdf
Extracted from the file · 1 page · 5,633 characters
Text of EOE-121 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
As listed on the current system
Question(s) Answered 119, 121 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/21/2026