Interrogatory responses
Answers to questions 182
Filed by Connecticut Light and Power Company dba Eversource Energy2 files
Part of docket 26-05-10Files2
EOE-182_Final.pdf
PDF · 87 KB · 1 pageText searchable
Download EOE-182_Final.pdfRead the text of EOE-182_Final.pdf
EOE-182 Attachment 1 Revised - REDACTED v2.pdf
PDF · 105 KB · 1 pageNo text in this file
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-182 Page 1 of 1 Date Filed: September 28, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (WIRE GUARDS/COMP BID) Provide the competitive bid assessments performed for all vendors performing wire guard services included in the Company’s response to EOE-970 in Docket No. 25-12-13. (i.e. applicable for the years 2024-2025) Please provide any additional competitive bid assessments for all vendors performing wire guard services that have been performed that were not included in the Company’s response to EOE-970 applicable for the years 2024-2025. Response: The Company’s response to EOE-970 in Docket No. 25-12-13 addressed competitive bid information applicable through 2023 and did not include the subsequent procurement applicable to the 2024–2025 period. Please refer to EOE-182, Attachment 1 CONFIDENTIAL, for the competitive bid results associated with the 2024–2026 ERP Wires Down Guard RFP, which includes the competitive bid assessment applicable to vendors performing wire guard services during 2024–2025. The Company has not identified any additional competitive bid assessments applicable to the 2024–2025 period beyond those provided in EOE-182, Attachment 1 CONFIDENTIAL.
As listed on the current system
Question(s) Answered 182 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/28/2026