Interrogatory responses
Answers to questions 206
Filed by Connecticut Light and Power Company dba Eversource Energy2 files
Part of docket 26-05-10Files2
EOE-206_Final.pdf
PDF · 177 KB · 3 pagesText searchable
Download EOE-206_Final.pdfRead the text of EOE-206_Final.pdf
EOE-206 Attachment 1 REDACTED.pdf
PDF · 2.7 MB · 24 pagesText searchable
Download EOE-206 Attachment 1 REDACTED.pdfRead the text of EOE-206 Attachment 1 REDACTED.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-206 Page 1 of 3 Date Filed: September 29, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 230-250. The Company reported an incremental charge of $151,095 for the E-J Electric T&D LLC vendor. Respond to the following: a. Cite the location of the vendor’s contractual Pricing Schedule Exhibit b. (i.e., typically referred to as Exhibit A). EOE observed that the contract c. provided at OCC-044, Att.2 (Confidential), starting at p. 1147 includes a List of Exhibits at p. 1153 which references the Pricing Schedule as Exhibit B but was unable to locate the document. Additionally, EOE observed similar documentation within EOE-024, Att.3 (Confidential) with a similar omission. b. Explain why the equipment was charged at 50% during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the remaining amount ($) of equipment that was charged for standby. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, at Line 249, E-J Electric T&D LLC, in the amount of $151,095. a. The Company confirms that, due to a clerical error during the submission process, the vendor’s Exhibit B Pricing Schedule was inadvertently omitted from the materials provided at OCC044, Attachment 2 CONFIDENTIAL, and EOE-024, Attachment 3 CONFIDENTIAL. The Exhibit B Pricing Schedule is detailed in EOE-206, Attachment 1 CONFIDENTIAL. b. The contractor was a COC and falls under subpart (e). in the pricing schedule or Exhibit B of the COC agreement. “(e) Equipment Rates: Equipment Rates for Emergency Response Work shall be at the rates set forth in Appendix PS-6 PRICING SCHEDULE - T&M. All maintenance, fuel, delivery, and other charges associated with the equipment shall be included in the Emergency Response Rates for Equipment. If Owner provides any fuel, Contractor shall reimburse Owner for such fuel costs and at Owner’s option, Owner may either invoice Contractor for such fuel costs orPage 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-206 Page 2 of 3 the cost of such fuel may be deducted from Contractor’s invoice amount for Emergency Response Work.” Please see the Company’s response to EOE-267 i for additional detail regarding billing for Equipment during Standby. The remaining amount of equipment that was charged for standby is $4,224. This amount was paid in accordance with contract provisions. Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: The Company’s accounting system does not separately track amounts billed by vendors for equipment during standby. Accordingly, the Company cannot generate the requested spreadsheet directly from its accounting system to provide the details requested. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. For additional context regarding these charges, the Company’s policy for billing equipment is described below: In the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the full duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made severalPage 3
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-206 Page 3 of 3 recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors— and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
As listed on the current system
Question(s) Answered 206 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/29/2026