Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

  1. Page 99 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 99 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 9 of 12) PURA Docket 2012 Rec Order # 4 (continued) PURA Docket No. 20-08-03 EP-CT-ELEC-PLN-2000 N/A 7 Performance Standard This requirement is not intended to prevent the EDCs from using all of its available crews to respond to higher priority needs to ensure public safety. c. Each EDC shall develop criteria such as, but not limited to, the number of damage locations as a percentage of miles of main line primary in a town, or total miles of primary that would be applied to determine the deployment of available Make Safe liaisons and line crews to those towns that have the highest public safety and outage impact, in the event that, and only so long as, available resources are not sufficient to address all public safety priorities at the same time in all towns. This requirement is intended to allow the EDCs to use all available crews to respond to higher priority needs to ensure public safety. Such criteria shall be included in the emergency response plan and reviewed annually with each town No later than June 30, 2021, the EDCs are directed to individually collaborate with CIEC to develop and submit to the Authority for review, modification, and approval the following modifications to the EDCs’ emergency response activities relating to major customer accounts, which shall be incorporated into each EDC’s ERP upon approval: a. Solutions to better to support major accounts during emergency events; b. Formal after action reporting process for major accounts; and c. Formal emergency preparedness and response communications plan with account representatives. 99 of 108 CT ERP Section Page Table 1 Table 2, 3.2, 3.9 17, 19, 35, 67 Rev 6
  2. Page 100 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 100 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 10 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 20-08-03 N/A 8 PURA Docket No. 20-08-03 N/A 9 EP-CT-ELEC-PLN-2000 Performance Standard No later than June 30, 2021, the EDCs shall revise and file for the Authority’s review, modification, and approval timesheets or other documentation used to track work performed by external or contractor line crews and damage assessors during future storms. Such revised timesheet or other documentation shall include the following minimum set of information per shift: a. Number or amount of work performed; b. Description and location of work performed; c. Beginning and ending locations; d. Paid time spent traveling at start and end of shift; e. Paid time traveled for mobilization, demobilization, and standby time f. Employee names; dates; and hours worked. The timesheets/documentation templates shall be included as an attachment to each EDC’s public version of its ERP. No later than June 30, 2021, the EDCs shall separately submit in a report to the Authority for its review and approval findings from the EDCs’ outreach to municipalities to understand what information and best form(s) of communicating that information is most useful and actionable to the towns during the first 48 hours following an Event Level 3 or greater event. The report shall also include a proposed template for use during future storms to communicate this information to towns for the Authority’s review, modification, and approval. 100 of 108 CT ERP Section Page 2.11.4, 3.5.2 31, Table 1 Table 2 3.2, 3.9 17, 19, 35, 67 Rev 6
  3. Page 101 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 101 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 11 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 20-08-03 N/A 9 (continued) PURA Docket No. 20-08-03 N/A 10 PURA Docket No. 20-08-03 N/A 11 EP-CT-ELEC-PLN-2000 Performance Standard The Authority will subsequently release such report for public comment. Once approved by the Authority, the EDCs shall communicate any required changes to the current communications protocols to all municipal leaders in their service territory and shall incorporate such protocols into the EDCs’ respective ERPs. No later than June 30, 2021, the EDCs shall separately work with municipalities in their service territories to identify ways that reporting blocked roads could be improved using the current manual reporting system. The EDCs shall summarize the input received from the municipalities in a report to the Authority. The report shall also include proposed improvements to the current reporting system for the Authority’s review, modification, and approval. The EDCs are directed to submit for the Authority’s review and approval the report and the proposed improvements. Once approved, the EDCs shall communicate any required changes to the current reporting system to all municipal leaders in their service territory and shall incorporate such changes into the EDCs’ respective ERPs. No later than June 30, 2021, the EDCs shall submit to the Authority a revised standard template for its 60-Day After Action Reports submitted to the Authority pursuant to Section 3.7 of Appendix A of the Performance Standards Decision that includes a section to consider corrective actions and lessons learned regarding performance efficiencies or cost saving measures. 101 of 108 CT ERP Section Page Table 1 Table 2 3.2, 3.9 17, 19, 35, 67 3.2, 3.6, Table 1 Table 2 35, 54, 17, 19 2.10.4, 9.2, Attachment 3 26, 84, 102 Rev 6
  4. Page 102 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 102 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 12 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 17-1203RE08 N/A 18 PURA Docket No. 17-1203RE08 N/A 19 PURA Docket No. 17-1203RE08 EP-CT-ELEC-PLN-2000 N/A 20 Performance Standard No later than September 30, 2022, the EDCs shall include in their respective ERPs appropriate protocols related to ISO-NE operating procedures as described in Section II.C.2., Incorporation of Winter Reliability Emergency Protocols into ERP. No later than September 30, 2022, the EDCs shall include in their respective ERPs Utilities’ critical infrastructure information and point-of-contact information consistent with Section II.C.3., Plan to Address Other Utility Critical Infrastructure. No later than June 30, 2024, each EDC shall include a Cybersecurity disruption response component in its ERP submitted pursuant to Conn. Gen. Stat. § 16-32e as described in Section II.C.4., Incorporation of Cybersecurity Plan into ERP. 102 of 108 CT ERP Section Page 6, Public Information (Communications & Media) Annex to the AHERP 34, 78 2.11.1, 3.10.2d 28, 73 2.13 34 Rev 6
  5. Page 103 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 103 of 108 Emergency Response Plan Electric System Operations - CT Attachment 3 – Sample AAR Form (Sheet 1 of 1) EP-CT-ELEC-PLN-2000 103 of 108 Rev 6
  6. Page 104 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 104 of 108 Emergency Response Plan Electric System Operations - CT Attachment 4 – Eversource Contractor Daily Time Sheet (Sheet 1 of 3) EP-CT-ELEC-PLN-2000 104 of 108 Rev 6
  7. Page 105 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 105 of 108 Emergency Response Plan Electric System Operations - CT Attachment 4 Eversource Contractor Daily Time Sheet (Sheet 2 of 3) Purpose. This Eversource Contractor Storm Daily Time & Work Report records details of emergency event time worked and worked performed by contractors. These sheets provide detail work documentation, and a reference for any invoicing. THIS TIMESHEET IS FOR USE ONLY UPON ARRIVAL ON EVERSOURCE PROPERTY AND SHOULD NOT BE USED FOR TRAVEL TIME FROM HOME BASE AND BACK TO HOME BASE. ONCE CONTRACTOR IS PUT TO WORK THE WORK RATE APPLIES FOR ALL HOURS WORKED (Travel, Standby, Work) Preparation. The authorized Eversource Representative ensures the Eversource Contractor Storm Daily Time & Work Report is completed and validated. It is signed by the Contractor Representative and submitted to and signed by Eversource Representative daily. Personnel should document time worked, relevant work that occurred and material used. Distribution. Blank Eversource Contractor Storm Daily Time & Work Report are provided to Contractor Representatives. The reports are submitted by the authorized Eversource Representative to the designated state-specific mailbox end of each day.2 Notes: Use additional copies as continuation sheets as needed, and indicate pagination as used. Block # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Block Title Instructions State Work was Performed Self-Explanatory. NOTE: If moved to another state within Eversource’s territory, start a In new timesheet. Include travel time to the other State on the new timesheet in Block 10. Date Work Was Performed Self-Explanatory Storm Work Order Provided by the Eversource Representative Contractor’s Name Contractor Company Name Contractor’s Address Contractor Company Address Start Time Beginning of shift End Time End of shift Name Contractor employee name as it appears on roster Classification e.g., Lineman, Apprentice, etc. FOR BLOCKS 10, 11, 12, 15 & 17: TIME ENTERED IS PAID AT NOGOTIATED RATE HOURS AND ALLOWED EXPENSES Travel time to/from hotel and work reporting location and/or between Eversource service Travel Time territories. Include travel time to the new state on that respective state’s timesheet (see Block 1). DO NOT INCLUDE MOBILIZATION & DEMOBILIZATION TRAVEL TIME. Standby Time onsite waiting to be put to work Work Time Time performing work (Restoration) Description (Equipment) Type of equipment or vehicle (e.g., Bucket Truck, Digger, Pickup Truck) Vehicle ID Equipment number or license plate number Billable Hours Number of hours equipment or vehicle was in use Description (Expense & Expenses (e.g., meals, tolls) and material charged back by Contractor. DO NOT INCLUDE Material) MATERIAL PROVIDED BY EVERSOURCE. Qty (Quantity) Cost ($) or Item used (e.g., wire, bolt holder) Unit of Measure e.g., feet, each (N/A for expenses) Total of Hours Sum of Columns 10, 11, & 12, & 15, respectively OMS Event Number Provided by Eversource Dispatcher Location Location work performed in – For Line, Tree, or Service Circuit FOR DAMAGE ASSESSORS ONLY: Circuit being assessed for damage Description of Work e.g., replacement of pole/pole top, transformer, wire) 2 [email removed], [email removed], [email removed] EP-CT-ELEC-PLN-2000 105 of 108 Rev 6
  8. Page 106 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 106 of 108 Emergency Response Plan Electric System Operations - CT Attachment 4 Eversource Contractor Daily Time Sheet (Sheet 3 of 3) Block # 24 25 26 27 28 29 30 31 32 Block Title Instructions Event Start Time Event End Time Contractor Representative Contractor Signature Telephone Number Date Approved by Eversource Representative Eversource Representative Signature Date Dispatch time for event Time work was completed on the event Printed Name of Authorized Contractor Representative Approval Signature of Authorized Contractor Representative Phone Number of Authorized Contractor Representative Date signed by Authorized Contractor Representative Printed Name of the Authorized Eversource Representative. NOTE: the Authorized Eversource Representative approves time, work, and the material used, NOT the rate(s). Approval Signature of Authorized Eversource Representative Date signed by Authorized Eversource Representative Signature by Eversource constitutes acknowledgment of receipt of invoice/time sheet; but Eversource reserves the right to further review and audit this document and the associated charges, and seek reimbursement of any amounts that are found to be over-billed or inaccurate. EP-CT-ELEC-PLN-2000 106 of 108 Rev 6
  9. Page 107 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 107 of 108 Emergency Response Plan Electric System Operations - CT Attachment 5 – LSC Customer Group Event Checklist (Sheet 1 of 2) Date: Event Day: ITEM Time: Operating Co(s): Event Name: Contact Center(s): REQUIRED ACTION RESPONSIBLE PARTY COMMENTS PRE-EVENT ACTIVITIES Prior to any anticipated storm, the Company will contact all life support customers, using existing automated messaging channels more than 24 hours in advance of the anticipated storm event. Life Support customers are identified and tracked through a Blue Sky business process. 01 02 Customers will be provided with the following information: • Notifying of an impending storm or weather event. • Making them aware that there may be widespread damage, and to be prepared. • Advising that our crews are preparing for storm response. • Providing them with resources available to them, if needed, such as the Red Cross. The company can track, using reporting, the number of customers who answered the call, received a voicemail message, hung up, or had a non-working number. Message Delivery Team Complete Message Delivery Team Complete DURING EVENT 03 04 During the outage restoration event, the company will track the status of electrical service of all life support customers through its outage management system reporting. The company provides a daily updated file containing all life support customers without power to municipal officials. EP-CT-ELEC-PLN-2000 Community Liaisons Complete Community Liaisons Complete 107 of 108 Rev 6
  10. Page 108 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 108 of 108 Emergency Response Plan Electric System Operations - CT Attachment 5 – LSC Customer Group Event Checklist (Sheet 2 of 2) The company runs daily outbound calling campaigns to life support customers to provide them an update on the status of their outage. 05 These campaigns are conducted using live outbound calling or through automated message delivery, based on current volume of outages. Community Liaisons/ Concierge Call Team/ Message Delivery Team Complete These campaigns continue daily until all customers are restored. POST-EVENT 06 07 Following substantial completion during a storm event, the customer group obtains a list of all life support customers who were impacted during the event, and does a final, outbound calling campaign to these customers. Depending on the number of customers impacted, the post-event campaign will either be live outbound by CSR or automated with an option to receive a call back from a CSR. The messaging will be to confirm that power has been restored and thank customers for their patience. 08 Should the customer require any further assistance, CSRs address the customer’s needs and/or escalate the situation, as warranted. EP-CT-ELEC-PLN-2000 Operations and Concierge Call Team Complete Concierge Team / Message Delivery Team Complete Concierge Team Complete 108 of 108 Rev 6

Text of EOE-040 Attachment 3.pdf

Extracted from the file · 328 pages · 663,868 characters

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)