Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

  1. Page 49 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 49 of 108 Emergency Response Plan Electric System Operations - CT b. ETR Monitoring The Planning Section Chief continuously gathers data, monitors conditions, and recalculates the global ETRs to achieve the best possible accuracy. c. Communication of ETRs Global ETRs are approved by the IC, in consultation with the President, prior to publication. The OMS System is used to create and manage Global level messages and Town level messages and projections. The system also has the ability to view the status of Event level messages and projections; event level messages are created and managed through the OMS. For event specific ETRs, customers receive the message and projection that is available at the most detailed level. The same information is provided to the customer from the Integrated Voice Response (IVR) system, company website, and Customer Care Center representatives, according to the customer’s preferred channel (any combination of voice, email, and text messaging the customer chooses). If there is an event-level message and projection, the customer is provided with this ETR. If an event-level message and projection are not available, then the customer receives the Town message and projection. Lastly, if neither the Event Level nor Town level ETR is available, the customer receives the Global level ETR message. ETR Messaging is dependent upon whether Eversource is operating in a Blue Sky, Gray Sky, or Black Sky mode: 1) Blue Sky Messaging ▪ An initial message with an ETR is sent to the customer’s channel of choice 15 minutes after the customer reports the outage ▪ If the ETR that was initially sent is changed by +/- 45 minutes, the customer is notified of the updated ETR ▪ When the outage is closed in OMS, a notification is sent to the customer, indicating that their power should have been restored ▪ There is no Global message during Blue Sky operation 2) Gray Sky Messaging ▪ An initial message (without an ETR) is sent to the customer’s channel of choice 30 minutes after the customer reports the outage, indicating that Eversource is aware of their outage and will provide more information when it becomes available ▪ When crews are on-site and provide a High Confidence ETR, the ETR is communicated to the customer ▪ When the event is updated in OMS with an ETR marked G (Global), the customer is sent a Global ETR message, including a description of what Global means ▪ When the outage is closed in OMS, a notification is sent to the customer, indicating that their power should have been restored 3) Black Sky Messaging ▪ ▪ ▪ EP-CT-ELEC-PLN-2000 An initial message (without an ETR) is sent to the customer’s channel of choice 60 minutes after the customer reports the outage, indicating that Eversource is aware of their outage and is experiencing a high volume of outage in the customer’s area The customer is sent a Global ETR message when the event ETR is marked as G in OMS, including a description of what Global means No ETR update or power restored notifications are sent to the customer 49 of 108 Rev 6
  2. Page 50 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 50 of 108 Emergency Response Plan Electric System Operations - CT 3.5 Logistics Section The Logistics Section, led by the Logistics Section Chief, supports and coordinates with other Command Staff and the IC to ensure that all organizations responding to an event are adequately supported. During a significant event, the Logistics Section is responsible for a variety of tasks, including, but not limited to: • Establishing and maintaining Satellite locations and Staging Areas • Supplying and replenishing necessary materials • Feeding, lodging, and ensuring the welfare of Company and restoration personnel • Fueling and maintaining vehicles and equipment • Supplying vehicles and specialty equipment needed to support the restoration • IT and Communications support services 3.5.1 Logistics Section Structure The Logistics Section is directed by the Logistics Section Chief who is a member of the General Staff and reports directly to the IC. In a major event, the Logistics section is composed of three branches: • • Services (Food & Lodging, Materials Logistics, Fleet Services, IT/Telecommunications, Staging Areas, Property Management, Security, Environmental, Procurement) Support (on-site coordination at the Regional EOCs and designated AWCs/Satellites, as appropriate) The Logistics Section Chief operates out of the ICC and ensures coordination with all Branch Directors throughout the preparation for, response to, and recovery from the event. An example of the Logistics Section organization is provided below in Figure 6. EP-CT-ELEC-PLN-2000 50 of 108 Rev 6
  3. Page 51 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 51 of 108 Emergency Response Plan Electric System Operations - CT Figure 6 – Example Logistics Section IMT Structure IMT Logistics Section ICC Logistics Section Chief ICC EOC Logistics Services Branch Director Logistics Support Branch Director ICC ICC ICC ICC Food & Lodging Services Unit Leader Material Logistics Services Unit Leader Fleet Services Unit Leader Staging Area Services Unit Leader Material Logistics Unit ICC Fleet Services Unit F&L Coordinator ICC ICC CT & MA Only IT/ Telecom Services Unit Leader Environmental Services Unit Leader NH Food & Lodging Coordination Is Within Logistics Support F Staging Area Supervisor F Staging Area Specialist IT Unit Telecom Unit ICC Security Services Unit Leader Security Unit EOC/AWC Logistics Support Unit Leader EOC/AWC Logistics Support Specialist Environmental Unit ICC Property Management Services Unit Leader Property Management Unit LOCATION KEY: Real Estate Unit ICC Procurement Services Unit Leader ICC – INCIDENT COMMAND CENTER EOC – EMERGENCY OPERATIONS CENTER AWC – AREA WORK CENTER F - FIELD Page 6 old Procurement Unit 3.5.2 Logistics Section Roles and Responsibilities Logistics activities are organized to efficiently assign critical services and resources when and where they are needed. In a higher-level event, there are two Logistics Branches: Services and Support. The Logistics Services Branch provides the various supporting services and resources throughout the IMT organization, and the Logistics Support Branch Directors and Unit Leaders (assigned to Regional EOCs) to ensure their Operations Section and Planning Section counterparts receive all the logistics services needed to effectively and efficiently carry out response activities and support the IAP. The Logistics Section provides support to the Gas IMT when it is activated. a. Logistics Section Chief The Logistics Section Chief ensures that all incident resources needed to support the strategic and tactical execution of incident objectives are made available. The Logistics Section Chief oversees the Logistics Section, which is organized into two Branches: Services and Support. Duties include: o o EP-CT-ELEC-PLN-2000 Ensure adequate logistics support for the EOCs and RMTs Obtain periodic updates from the Logistics Branch Directors on the status of resource requests and other logistics requirements 51 of 108 Rev 6
  4. Page 52 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 52 of 108 Emergency Response Plan Electric System Operations - CT o o o o Periodically update the Command and General Staff on actions and progress Order or request additional resources as needed Ensure that the positions within the Logistics Section execute their specific duties and responsibilities Support the development of a demobilization plan and implement it to return to normal business operations Logistics Services Branch An emergency event requires service support beyond that provided for day-to-day operations. The Logistics Section Services Branch oversees the activation and coordination of the following service units. b. Logistics Services Branch Director The Logistics Services Branch Director has the overall responsibility for the preparedness, planning, and coordination of a variety of logistical services including facilities, food and lodging, environmental response, procurement, transportation, materials, IT/ Telecom, and staging areas. The Logistics Services Branch Director oversees and supports the Services Branch Unit Leaders. c. Food and Lodging Services Unit Recovery efforts can continue around the clock for several days. It is therefore necessary to provide for proper rest and nourishment of personnel assisting in restoring the Electric System. The Food and Lodging Unit provides all coordinating activities for food services and housing and related transportation and parking services as needed. Food and Lodging Unit members are under the direction of the Food and Lodging Unit Leader within the Logistics Section when the IMT organization is established at the ICC. d. Material Logistics Services Unit Repair of damage requires line crews to have ready access to and availability of parts and materials. Material Logistics supports restoration by ensuring that appropriate warehouse and storeroom locations are staffed in order to supply the materials needed by personnel performing restoration activities. Material Logistics also has responsibility for material salvage and satellite and staging area location clean-up operations. e. Information Technology (IT)/Telecom Services Unit Many of the tools used by the IMT Organization to manage the emergency restoration process rely on computer hardware, databases, and software applications as well as communications equipment and infrastructure. The IT team ensures correct functioning of computer hardware, databases, and software applications used to produce this data. IT personnel support the Incident Command Staff and recovery efforts by setting up and maintaining computer equipment and providing application assistance throughout the restoration. The Telecommunications team supports telecommunications requirements during restoration efforts, including maintaining equipment such as radios, satellite phones, paging systems, and microwave and fiber optic systems used to communicate this data. These systems are critical to the Company’s ability to promptly and safely manage the restoration of customer outages. Telecommunications Services personnel ensure proper communications by maintaining, repairing, and modifying various types of telecommunication equipment to facilitate communications between IMT personnel. EP-CT-ELEC-PLN-2000 52 of 108 Rev 6
  5. Page 53 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 53 of 108 Emergency Response Plan Electric System Operations - CT f. Security Services Unit Security is paramount during emergency incidents where there is widespread physical damage. It is especially important when significant resources are brought to Connecticut to help restore service to customers. The Security Services Unit Leader is responsible for the oversight of all issues involving security. The Security Services Unit ensures that adequate security services are provided for on-scene response operations if required. Some examples would include staffing and positioning security at required locations, obtaining supplemental security contractors, investigating security issues and suspicious activities at company facilities, providing security in volatile situations, coordinating with state and local law enforcement as necessary, and ensuring all security-related incidents are properly reported. g. Fleet Services Unit Fueling and maintenance are coordinated by the Fleet Services Unit Leader. Fleet Services personnel perform required actions to support vehicles and equipment used in restoration activities on electric lines and equipment, including the coordination of refueling and traffic control. h. Environmental Services Unit The Environmental Services Unit is responsible for ensuring all applicable environmental rules and policies are understood and complied with during the restoration effort. The Environmental Services Unit Leader oversees and ensures compliance with all environmental regulations; prepares and submits all required regulatory reports; maintains open communications with regulatory bodies to keep them informed of any significant spills or other environmental issues resulting from the event damage; and coordinates associated mitigation efforts with the Operations, Planning, and Logistics Sections. i. Property Management Services Unit Organizations directing recovery efforts do so from various buildings and facilities. These buildings require support to maintain basic habitability. The Property Management Services Unit is comprised of primary facilities staff and is responsible for preparation, operation, and management of the facilities to support the response and recovery effort, including staging areas. The Property Management Services Unit supports any and all facility-related needs throughout the duration of the event. Facilities department personnel assist in emergency restoration activities by providing necessary support for such items as building maintenance, janitorial services, maintenance, and operation of HVAC systems, and maintenance and operation of emergency power generators. j. Staging Area Services Unit During significant emergency events, many resources converge on Connecticut to provide restoration support. Staging areas are critical for accommodating and ensuring the efficient utilization of these resources. To accommodate these additional resources and to ensure they are properly trained and informed regarding the scope of the event, staging areas are used to aggregate these resources as they enter the service territory. Pre-determined locations for staging of such resources are strategically located throughout Connecticut. The Staging Area Services Unit Leader ensures an organized migration of work crews into the restoration effort. EP-CT-ELEC-PLN-2000 53 of 108 Rev 6
  6. Page 54 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 54 of 108 Emergency Response Plan Electric System Operations - CT Logistics Support Branch The Logistics Support Branch Director ensures that all of the logistics needs for services, personnel, and equipment of the Regional EOCs, RMTs, and Satellite Work Centers are met in a timely and efficient manner and that the requirements defined in the IAPs are appropriately supported. k. Logistics Support Branch Director The Logistics Support Branch Director coordinates the activities of Logistics Support Unit Leaders to ensure that all of the Eversource facilities under the control of the IMT have their logistics needs satisfied. The Logistics Support Branch Director also works with Logistics Services Group to ensure all logistical needs are effectively met. 3.6 Public Safety Section The Public Safety Organization is responsible for addressing hazards impacting communities caused by electrical equipment. The Public Safety Section Chief works closely with other members of the Command and General staffs, particularly the Liaison Officer, Planning Section Chief, and Operations Section Chief to ensure that public safety locations are being mitigated in a safe and efficient manner. The Public Safety Section Chief ensures that the Public Safety team is addressing the highest priorities at any given point in time. During a significant event, the Public Safety Section is responsible for a variety of tasks, including, but not limited to: • Execute the work plan to achieve the Incident Action Plan (IAP) Operational Period objectives • Request additional resources to support the Public Safety tactical operations as required • Ensure safety procedures and protocols are being adhered to and exercise authority to stop or prevent any unsafe acts • Obtain a preliminary assessment of the number of public safety FPS locations impacted, by community, and coordinate with the Planning and Liaison Sections to allocate accordingly • Ensure that all hazard mitigation activities are being recorded appropriately in OMS, including updating and closing out FPS events and properly documenting mitigation actions in outage events. • Ensure field personnel coordinate with the applicable EOC or RMT for required switching and tagging • Continually assess restoration progress and allocate resources where necessary • Prepare status updates and provide to the IC as required or requested • Support the development of a Demobilization Plan to return to normal business operations 3.6.1 Public Safety Services Responding to an Eversource Emergency Event Emergency response services are a traditional government function. Eversource must respectfully decline to reimburse municipalities for public safety efforts undertaken in response to downed electrical wires or other electric system events during major storms or other emergency events. EP-CT-ELEC-PLN-2000 54 of 108 Rev 6
  7. Page 55 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 55 of 108 Emergency Response Plan Electric System Operations - CT 3.6.2 Fire, Police Standby (FPS) Calls The FPS Call classifications follow the Priority Level System (PLS), established following the 1997 Emergency Response Task Force Report. This PLS is applicable both in Normal and ERP operations, providing priority response, to make electrical hazards safe. FPS Calls may present significant challenges during emergency events due to increased call volume, availability of resources, difficulty gaining access to certain locations due to downed trees and wires, and reporting issues. Because of all of these factors, it is critical to have calls correctly classified as FPS 1 (Immediate Life-Threatening Situation), FPS 2 (Hindering Emergency Operations, Not Life-Threatening), or FPS 3 (Electrical Hazard, Not Life-Threatening). It is crucial to document the receipt of these calls and, in turn, establish a prioritization routine to respond to FPS Calls effectively. Consistent and efficient handling and processing of FPS Calls and locations allows the Public Safety Section and Operations RMTs to assess trouble areas and properly prioritize and plan required restoration activities, as well as to quickly dispatch repair crews when reports are received indicating that public safety could be threatened. Standardization of this process across Eversource also allows the use of personnel from outside the area to efficiently assist or replace local personnel. The FPS classification is determined by the Municipal Fire, Police, or Emergency Response Provider placing the call or entering the information into the Municipal Hub. Eversource responds to FPS Calls as they are received. EP-CT-ELEC-PLN-2000 55 of 108 Rev 6
  8. Page 56 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 56 of 108 Emergency Response Plan Electric System Operations - CT Table 4 - FPS Call Classifications Call Classification Description Example Reaction FPS 1: Immediate LifeThreatening Situation An immediate life-threatening situation in which electric utility equipment is preventing emergency response personnel from performing rescue efforts and/or administering first aid to someone who may be injured or is in danger of being injured. Emergency Response Provider is on scene and standing by. Electric utility wires are on a vehicle with entrapment, Fire Department is on scene and is standing by for the nearest qualified utility resource. MUST be reported using designated hotline, directly to the SOC. Customer Service Representative (CSR) can answer the FPS 1 Hotline as a backup for the SOC. An event in which electric utility equipment is preventing emergency response providers from responding to a situation that is not considered life threatening but requires the attention of emergency personnel. Emergency Response Provider is on-scene and standing by. A Make Safe Blocked Road where electric utility equipment is preventing emergency operations from reasonable means of access to an area and is not life-threatening. Fire, Police, or Public Works are enroute or on scene standing by for a qualified utility resource. A Wire Guard or temporary road closure may be appropriate to warn the public of the hazard. FPS 2: Hindering Emergency Operations, Not LifeThreatening The SOC Operations Supervisor takes call details, enters the information directly into the appropriate system, and the best, fastest to respond resource is dispatched to make the electrical hazard safe. Reported by Municipal Hub or designated priority hotline to a livevoice CSR. Municipal Hub users can enter FPS 2 information, which creates a new event in OMS. A qualified resource is dispatched to make the electrical hazard safe. During Level 4 or higher ERP, a Public Safety Specialist (if requested) coordinates with the Municipality to assist in prioritizing FPS 2 events. Make Safe / Protocol for Clearing Blocked Roads - Connecticut Emergency Support Function (ESF) 12 All Hazards Energy and Utilities Annex, August 2013 FPS 3: Electrical Hazard, Not LifeThreatening An event in which utility equipment has created the need for emergency response personnel to remain on the scene to protect the public from the hazard created by the utility’s equipment and is not considered life-threatening. Emergency Response Provider is enroute or standing by. EP-CT-ELEC-PLN-2000 Electric utility equipment is down, Reported by Municipal Hub or but not preventing emergency designated priority hotline to a liveoperations from having a voice CSR. reasonable means of access to an Municipal Hub users can enter FPS 3 area and is not life-threatening. A information, which creates a new event Wire Guard may be appropriate in OMS. A qualified resource is to warn the public of the hazard. dispatched to make the electrical hazard safe. 56 of 108 Rev 6
  9. Page 57 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 57 of 108 Emergency Response Plan Electric System Operations - CT Community Liaisons work collaboratively with pre-designated representatives (Single Points of Contact) from each Municipality to identify, validate, and address priorities appropriately. During Level 4 ERP or higher, a Public Safety Specialist may be requested by a Municipality that has multiple damage locations meeting the FPS 2 classification. When both the Community Liaison and Public Safety Specialist are engaged within a Municipality, the Community Liaison works with the Municipal Single Point of Contact (usually the Emergency Management Director or designee) to address community restoration priorities and the Public Safety Specialist works with the Community Point of Contact (usually the Department of Public Works Director) to address priority event FPS 2 Make Safe Blocked Roads. 3.6.3 Public Safety Section Structure The Public Safety Section is directed by the Public Safety Section Chief who is a member of the General Staff and reports directly to the IC. In a major event, the Public Safety section is composed of: • • • • • Public Safety Section Chief Public Safety Unit Leader Public Safety Specialist Coordinator RSO Public Safety Supervisor Public Safety Specialists The Public Safety Section Chief operates out of the ICC and ensures coordination with all Sections throughout the preparation for, response to, and recovery from the event. An example of the Public Safety Section organization is provided below in Figure 7. EP-CT-ELEC-PLN-2000 57 of 108 Rev 6
  10. Page 58 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 58 of 108 Emergency Response Plan Electric System Operations - CT Figure 7 – Example Public Safety Section IMT Structure IMT Public Safety Section ICC Electric Incident Commander ICC Public Safety Section Chief AWC Public Safety Unit Leader (Region) EOC/AWC F Public Safety Coordinator RSO Public Safety Coordinator F RSO Specialist/ Troubleshooter Public Safety Specialist (CT Only) LOCATION KEY: ICC – INCIDENT COMMAND CENTER EOC – EMERGENCY OPERATIONS CENTER AWC – AREA WORK CENTER F – FIELD RSO – RESPONSE SPECIALIST ORGANIZATION a. Public Safety Section Chief The Public Safety Section Chief has the overall responsibility to assemble, prepare, and deploy resources to address hazards impacting communities caused by electrical equipment. The Public Safety Section Chief works closely with other members of the Command and General staffs, particularly the Liaison Officer, Planning Section Chief, and Operations Section Chief to ensure that public safety events are mitigated in a safe and efficient manner. During widespread damage, there may be a high volume of public safety events across the Eversource service territory. The Public Safety Section Chief ensures that the Public Safety team is addressing the highest priorities in the following order (consistent with the PLS – 3.6.2): 1. FPS 1: Immediate Life-Threatening Situation 2. FPS 2: Hindering Emergency Operations, Not Life Threatening 3. FPS 3: Electrical Hazard, Not Life Threatening EP-CT-ELEC-PLN-2000 58 of 108 Rev 6

Text of EOE-040 Attachment 3.pdf

Extracted from the file · 328 pages · 663,868 characters

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)