Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

  1. Page 91 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 91 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 – Crosswalk Table of PURA Requirements (Sheet 1 of 12) 2012 Recommendations Order # Performance Standard CT ERP Section Page PURA Docket No. 12-06-09 Davies, Witt 1, 2.a.ii & vi Event Classification: Event Level Matrix (ELM) 1.2, 2.4.1, 2.8, 3.1, 0, 10.2, Table 1 Table 2 9, 16, 23, 35, 74, 85, 17, 19 PURA Docket No. 12-06-09 Witt 3.6 During an Emergency Event this includes, at a minimum, implementing all applicable components of the ERP related to restoration of service. 1.2 9 2.a.i The ERP for each EDC should incorporate the structure and process of the National Incident Management System (NIMS) and utilize the Incident Command System (ICS) to permit decentralization and re-centralization of command and control throughout an Emergency Event in order to provide optimum and efficient response and utilization of resources. 1.4, 2.2 11, 13 CL&P should review the existing procedures concerning restoration strategies to confirm alignment and consistency. Additionally, CL&P should provide input into tasks and objectives in order to ensure that future exercises incorporate multiple strategies within an operating area. 2.4 15 1. Each EDC shall conduct an exercise using the procedures set forth in the utility's ERP. If the EDC uses the plan during such 12 month period in responding to an Emergency Event, the utility must then complete an exercise within 18 months;2. Each EDC shall annually evaluate its response to an exercise or major outage. The evaluation shall be provided to the PURA within 60 days after the exercise or event. 2.10.4, 8.2 26, 83 PURA Docket PURA Docket No. 12-06-09 Witt Davies PURA Docket No. 12-06-09 EP-CT-ELEC-PLN-2000 2.c.i.1 91 of 108 Rev 6
  2. Page 92 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 92 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 – Crosswalk Table of PURA Requirements (Sheet 2 of 12) PURA Docket PURA Docket No. 12-06-09 PURA Docket No. 12-06-09 PURA Docket No. 12-06-09 EP-CT-ELEC-PLN-2000 2012 Order # Recommendations Performance Standard CT ERP Section Page 2.a.iv The ERP shall include guidelines for setting priorities for service restoration. In general, the EDC shall set priorities such that service is restored first to critical customers, and second such that the largest number of customers can receive service in the shortest amount of time. This provision does not prohibit an EDC from simultaneously restoring critical customers, the largest number of blocks of customers, and performing other restoration activities as described in its ERP. 2.11.1 28 2.a.iv Each EDC shall abide by the guidelines and priorities for service restoration contained in its ERP. In general, the utility shall set priorities so that service is restored first to critical customers, and second so that the largest number of customers can receive service in the shortest amount of time, but this provision does not prohibit a utility from simultaneously restoring critical customers, the largest number or blocks of customers, and performing other restoration activities described in its ERP. 2.11.1 28 2.a.vi The ERP must also specify mutual assistance protocols and prioritization. These could include: utilization of holding company resources, contract crew reservations, local utility assistance, and organizations the EDC belongs to and participates in, such as the North East Mutual Assistance Group (NEMAG), Edison Electric Institute (EEI) Restore Power, and others as appropriate. 2.11.4 31 92 of 108 Rev 6
  3. Page 93 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 93 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 – Crosswalk Table of PURA Requirements (Sheet 3 of 12) PURA Docket PURA Docket No. 12-06-09 PURA Docket No. 12-06-09 PURA Docket No. 12-06-09 EP-CT-ELEC-PLN-2000 2012 Order # Recommendations Performance Standard CT ERP Section Page Davies, Witt 2.a.vi The ERP must be designed to provide for mutual assistance parameters that describe how the EDC intends to employ resources available pursuant to mutual assistance agreements for emergency response. Mutual assistance shall be requested when the EDC reasonably believes that local resources are inadequate to assure timely restoration of service or public safety, or if mutual assistance would substantially improve restoration times or mitigate safety hazards. The ERP should include a storm matrix for various storm levels that identify the necessary mutual aid and/or contractor resources necessary to restore customers within a prescribed time period range. Additionally, the matrix should identify different types of storms and establish resource requirements specific to those types of Emergency Events. 2.11.4 31 2.a.vi The ERP must stipulate at what level of outage or anticipated outage level the EDC will request mutual assistance, taking into account travel times from remote resources, so as to ensure sufficient resources to rapidly and efficiently provide restoration. 2.11.4a 31 2.a.iii The ERP shall describe the process for assessing damage and, where appropriate, the use of contingency resources required to expedite a response to the emergency. The ERP should also specify the mode(s) of delivery of damage assessments. 3.4.4 47 Davies, Witt 93 of 108 Rev 6
  4. Page 94 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 94 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 – Crosswalk Table of PURA Requirements (Sheet 4 of 12) PURA Docket PURA Docket No. 12-06-09 PURA Docket No. 12-06-09 PURA Docket No. 12-06-09 EP-CT-ELEC-PLN-2000 2012 Recommendations Order # Davies Witt Performance Standard CT ERP Section 2.a.vi The ERP shall recognize the need to communicate mutual assistance activities with specified state and local agencies. 3.9.2d, 3.10.2c 70, 73 3 Each EDC shall train designated personnel each calendar year in preparation for events. The training shall be designed to overcome problems identified in the evaluations of responses to an event or exercise and shall reflect any relevant changes to the EDC's plan; 8.2 83 2.c.i.4 Each EDC shall provide no less than ten days prior notice of its annual exercise to the PURA, the Department of Emergency Services and Public Protection, the chief elected official of each municipality in its service territory and any state-established emergency office(s) for the region(s) in which the exercise is to be performed, and to appropriate local authorities. 8.2 83 94 of 108 Page Rev 6
  5. Page 95 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 95 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 – Crosswalk Table of PURA Requirements (Sheet 5 of 12) PURA Docket PURA Docket No. 12-06-09 EP-CT-ELEC-PLN-2000 2012 Order # Recommendations Performance Standard CT ERP Section Page Witt, Two Storm Every three calendar years, each EDC shall conduct or participate in a comprehensive emergency exercise to test and evaluate major components of its plan and shall invite a crosssection of the following, or their representatives, located within the EDC's service territory, to the exercise: • Chief elected official and other elected officials; • County/regional emergency management directors; • Fire and police departments; • Community organizations such as the American Red Cross, which have participated in prior such exercises or which the EDC reasonably concludes should participate in such exercises; and • the PURA. 2. Each EDC shall participate in each statewide emergency preparedness drill conducted by the state in which the state extended an invitation for participation to the EDC; 3. The large-scale exercises that are held every three years should consider the highest level event covered in the ERP, for example, a Level 4 event, with up to 70% of its customers suffering an extended outage; and 4. Provide after-action and lessons-learned reports to the EDC's participants and any other participants whom the EDC recommends should modify or improve their performance, and file these with PURA within 60 days following each exercise. 8.2 83 2.c.ii.1 95 of 108 Rev 6
  6. Page 96 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 96 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 6 of 12) PURA Docket 2012 Order # Recommendations Performance Standard CT ERP Section Page 8.2 83 PURA Docket No. 12-06-09 2.c.i.5 5. The EDC shall participate in other emergency exercises, which are conducted by the state or any state-established emergency office for one or more regions in the EDC's service territory, that is designed to address problems on electric distribution facilities or services and to which the utility has been invited to participate. PURA Docket No. 12-06-09 2 Each EDC will also file the ERP in full when there have been any material changes in the ERP. 9.2 84 PURA Docket No. 12-06-09 2 Submit ERP to the PURA for reviews of emergency plans every two years, on or before July 1st, pursuant to the General Statutes of Connecticut (Conn. Gen. Stat.) §16-32e. 10.2 85 2.a.vi Each EDC shall annually notify the PURA by July 1st of the mutual aid groups to which it belongs and whether there have been changes in the membership of those groups or material changes in the rules of those groups within the previous 12 months. 10.2 85 1 No later than June 30, 2021, Eversource and UI shall separately submit for the Authority’s review, modification, and approval updated ERPs incorporating all of the changes discussed herein. In this filing, the EDCs shall provide two sets of ERPs: a version with redline edits and a clean version. Such changes shall include the modifications to the ERP Event Level Classification Matrix outlined in Section IV.D.8. 2, Table 1 Table 2 12, 17, 19 PURA Docket No. 12-06-09 PURA Docket No. 20-08-03 EP-CT-ELEC-PLN-2000 N/A 96 of 108 Rev 6
  7. Page 97 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 97 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 7 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 20-08-03 N/A 1 (continued) PURA Docket No. 20-08-03 N/A 2 PURA Docket No. 20-08-03 N/A 3 EP-CT-ELEC-PLN-2000 Performance Standard The updated matrix shall include the number of total, internal, and external resources to be available at the onset of the storm, as well as the peak number of crews expected during the storm restoration process for each event level for the following categories of resources by number of crews and full time equivalent staff: a. Line Crews; b. Service Crews; c. Damage Assessors; d. Tree/Line Clearance/ Vegetation Mgt Crews; e. Liaisons; and f. Large customer account representatives (See, Section IV.G.1.). The EDCs shall also develop a process for identifying and tracking life support customers, which are customers that require electrical service for life-maintaining conditions. The EDCs shall incorporate into their respective ERPs filed for the Authority’s review, modification, and approval on or before June 30, 2021, a formal process to contact life support customers before, during, and after storm events. Specifically, the formal process must include steps to: contact all life support customers more than 24 hours before the onset of a major storm; track the status of electric service to life support customers; regularly update each municipality served by the EDC of the life support customers without power in their town; and provide daily communications to life support customers without power during the storm restoration process No later than June 30, 2021, Eversource and UI shall separately perform and submit to the Authority a study to determine the number of damage assessors needed to assist in the identification of Make Safe locations and restoration duties within the first 48 hours of storm onset for each of the event levels in its Event Level Matrix. 97 of 108 CT ERP Section Page 2, Table 1 Table 2 12, 17, 19 3.9 67 3.2, 3.6, Table 1 Table 2 35, 54, 17, 19 Rev 6
  8. Page 98 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 98 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 8 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 20-08-03 N/A 3 (continued) PURA Docket No. 20-08-03 N/A 4 EP-CT-ELEC-PLN-2000 Performance Standard Based on the findings of the study, UI and Eversource shall include in their respective updated ERPs the range of damage assessors likely needed in the event level classification, as directed in Order No. 1. Until further notice, the Authority directs Eversource and UI to include in their storm preparedness resource acquisition activities the ability to acquire enough line resources and liaisons sufficient to dedicate one of each to any potentially affected municipality in its territory who requests such. This requirement shall apply to any Event Level 4 or higher. a. In the case of Make Safe liaisons, Eversource and UI shall provide a Make Safe liaison that is in addition to the town liaison and will be dedicated solely during response to coordinate blocked roads with the towns until all Make Safe roads are cleared or until such a time as the EDC and town has conferred and determined that the town no longer needs a dedicated Make Safe Liaison. b. In the case of line resources, Eversource and UI shall have on hand line resources in advance of an event sufficient to provide one lineworker crew for each towns that request one. UI shall continue to provide a dedicated line resource crew and Make Safe crew to each municipality that requests one according to its current policy. In the case of an Event Level 4 or higher, Eversource and UI shall make these resources available for municipalities no later than 12 hours after the storm has left the area. Additional line resources brought to bear for which a town no longer has need may, upon confirmation with the town, be allocated to restoration or to other duties. 98 of 108 CT ERP Section Page 3.2, 3.6, Table 1 Table 2 35, 54, 17, 19 3.2, 3.6, Table 1 Table 2 35, 54, 17, 19 Rev 6
  9. Page 99 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 99 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 9 of 12) PURA Docket 2012 Rec Order # 4 (continued) PURA Docket No. 20-08-03 EP-CT-ELEC-PLN-2000 N/A 7 Performance Standard This requirement is not intended to prevent the EDCs from using all of its available crews to respond to higher priority needs to ensure public safety. c. Each EDC shall develop criteria such as, but not limited to, the number of damage locations as a percentage of miles of main line primary in a town, or total miles of primary that would be applied to determine the deployment of available Make Safe liaisons and line crews to those towns that have the highest public safety and outage impact, in the event that, and only so long as, available resources are not sufficient to address all public safety priorities at the same time in all towns. This requirement is intended to allow the EDCs to use all available crews to respond to higher priority needs to ensure public safety. Such criteria shall be included in the emergency response plan and reviewed annually with each town No later than June 30, 2021, the EDCs are directed to individually collaborate with CIEC to develop and submit to the Authority for review, modification, and approval the following modifications to the EDCs’ emergency response activities relating to major customer accounts, which shall be incorporated into each EDC’s ERP upon approval: a. Solutions to better to support major accounts during emergency events; b. Formal after action reporting process for major accounts; and c. Formal emergency preparedness and response communications plan with account representatives. 99 of 108 CT ERP Section Page Table 1 Table 2, 3.2, 3.9 17, 19, 35, 67 Rev 6
  10. Page 100 of 108

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 2 Page 100 of 108 Emergency Response Plan Electric System Operations - CT Attachment 2 Crosswalk Table of PURA Requirements (Sheet 10 of 12) PURA Docket 2012 Rec Order # PURA Docket No. 20-08-03 N/A 8 PURA Docket No. 20-08-03 N/A 9 EP-CT-ELEC-PLN-2000 Performance Standard No later than June 30, 2021, the EDCs shall revise and file for the Authority’s review, modification, and approval timesheets or other documentation used to track work performed by external or contractor line crews and damage assessors during future storms. Such revised timesheet or other documentation shall include the following minimum set of information per shift: a. Number or amount of work performed; b. Description and location of work performed; c. Beginning and ending locations; d. Paid time spent traveling at start and end of shift; e. Paid time traveled for mobilization, demobilization, and standby time f. Employee names; dates; and hours worked. The timesheets/documentation templates shall be included as an attachment to each EDC’s public version of its ERP. No later than June 30, 2021, the EDCs shall separately submit in a report to the Authority for its review and approval findings from the EDCs’ outreach to municipalities to understand what information and best form(s) of communicating that information is most useful and actionable to the towns during the first 48 hours following an Event Level 3 or greater event. The report shall also include a proposed template for use during future storms to communicate this information to towns for the Authority’s review, modification, and approval. 100 of 108 CT ERP Section Page 2.11.4, 3.5.2 31, Table 1 Table 2 3.2, 3.9 17, 19, 35, 67 Rev 6

Text of EOE-040 Attachment 3.pdf

Extracted from the file · 328 pages · 663,868 characters

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)