Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 101 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 101 of 328 Equipment and Supplies: G. Equipment Required: • Phone • Computer • MiFi, if needed • Storm PCard Personal: • 1. Safety Requirements: Any personal needs for multiple days away from home Personal Protective Equipment (PPE): If not working remotely, appropriate clothing for weather conditions, including anti-slip footwear as needed H. Position Work Location: Incident Command Center, Area Work Center, or other area as directed, if not working remotely I. Work Period: 8-16+ hour work period per day J. Activation Notification: Call Out, phone, email, Teams, text SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Initial Training • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Food Support Training (EP-503T) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-04 Food Support Request and Tracking Tool Training (EP-503T) Teams, SharePoint, FSRTT, Outlook, texting Rev 3 Page 2 of 2
  2. Page 102 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 102 of 328 EP-ALL-EPJD-LOG-06 , Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Material Logistics Services Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Material Logistics Services Unit Leader B. Reports To: Logistics Services Branch Director 1. Direct Reports: Material Logistics Unit C. Position Duties and Responsibilities: Coordinates materials logistics activities in support of the emergency, including receiving, storing and issuing inventory and non-inventory materials, equipment, and supplies. Ensures that the positions within the Unit execute their specific duties and responsibilities consistent with EP-ALLANX-1000 F, Supply Chain Procurement Annex. D. Pre-Event Preparations: • Coordinate Material Logistics Unit activation with the Director, Material Logistics • Coordinate, within the Logistics Services Branch, anticipated openings of staging areas • Project/ensure adequate materials based on predicted/actual conditions and coordinate with Procurement as needed • Ensure pre-staged material is deployed, as needed • Participate in Logistics briefings • Act as the central point of contact for material logistics issues for the IMT • Coordinate material logistics needs with the Logistics Support Unit Leader and Staging Area Services Unit Leader as needed • Project/ensure adequate materials based on predicted/actual conditions • Ensure Food and Lodging requirements have been communicated • Participate in Logistics briefings • Provide timely reports to Branch Director • Notify Director, Material Logistics of company return to normal operations • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A in ICC or office Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  3. Page 103 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 103 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-06 Eversource N:\ Drive Rev 0 Page 2 of 2
  4. Page 104 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 104 of 328 EP-ALL-EPJD-LOG-07, Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Fleet Services Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Fleet Services Unit Leader B. Reports To: Logistics Services Branch Director 1. Direct Reports: Fleet Services Unit C. Position Duties and Responsibilities: Coordinate fleet service issues in support of the emergency, including fleet availability, rental vehicle procurement and assignment, fleet maintenance and repairs, and emote fueling of all fleet and contractor vehicles. Ensures that the positions within the Unit execute their specific duties and responsibilities consistent with Fleet Services Annex. D. Pre-Event Preparations: • Coordinate, within the Logistics Services Branch, anticipated openings of staging areas • Coordinate Fleet Services Unit activation with the Vice President, Operation Services and initiate actions to support expected needs, including: E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: • o Determining the availability of Fleet vehicles o Updating contact information for rental vehicle vendors o Determining projected requirements for fleet and rental vehicles o Determining projected fueling needs and remote fueling locations and notify vendor(s) o Verifying adequate inventory of fleet parts and requesting procurement to fill gaps Coordinate fleet service activities, including: o Procurement and assignment of rental vehicles o Maintenance and repairs of fleet vehicles o Remote fueling activities at Staging Areas, hotels, and so on o Ensuring availability of vehicle maintenance personnel o Ensuring availability of vehicle repair parts o Movement of vehicle maintenance personnel to areas with large fleet concentration • Ensure Food and Lodging requirements have been communicated • Participate in Logistics briefings • Provide timely reports to Logistics Services Branch Director • Notify Vice President, Operation Services of company return to normal operation • Ensure return of rental vehicles • Ensure deactivation of remote fueling contractors • Direct relevant documentation to the Planning Section for disposition. • Participate in After Action Review(s) Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  5. Page 105 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 105 of 328 Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in ICC or office Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-07 Eversource N:\ Drive Rev 0 Page 2 of 2
  6. Page 106 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 106 of 328 EP-ALL-EPJD-LOG-08, Rev 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Staging Area Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Staging Area Unit Leader B. Reports To: Logistics Services Branch Director 1. Direct Reports: Staging Area Supervisors C. Position Duties and Responsibilities: The Staging Area Unit Leader is responsible for organizing, coordinating, and supporting staging areas. D. Pre-Event Preparations: • Collaborate with Logistics Services Branch Director and determine the locations, size, and anticipated functions of staging areas • Request the Property Management Services verify that pre-designated Staging Area agreements are current, and sites are ready for use • If a Logistic Contractor is anticipated to be used to support the Staging Areas, confirm that the Contractor(s) has been notified and activated • Determine resource staffing requirements for the staging areas • Notify/activate Staging Area Supervisors and Specialists • Notify and coordinate Logistics Services Section Unit Leaders needed to support staging area operations. For example, food and lodging, material logistics, security, fleet services, IT/ telecommunications, property management, environmental, and so on • Communicate staging area readiness to the Logistics Services Branch Director • Coordinate staging area needs with the Staging Area Supervisors • Gather information from Logistics Section Branch Director pertaining to the proposed number of crews and vehicles expected to use each Staging Area and their proposed working schedules • Coordinate with the Staging Area Supervisors to determine each staging area’s resource staffing requirements, and estimate activation and deployment response timelines • Ensure the layout and set up of staging area is available and workable and that the staging area can support the desired restoration crew work schedules • Reviews each day’s Incident Action Plan (IAP) for the next operational period and maintain awareness of the numbers and assigned work locations of all crews • Brief Staging Area Supervisor as needed • Conduct daily conference calls with Staging Area Supervisors to gather information about ongoing operations, rosters, unusual situations, and anticipated requirements during next Operational Period • Provide routine summary reports to the Logistics Section Services Branch Director • Coordinate with the Logistics Services Branch Director and develop and implement the overall Demobilization (DMOB) Plan as it relates to staging areas • Coordinate redeployment or release of the Staging Area personnel with Staging Area Supervisors and the applicable Logistics Section Unit Leaders • Notify the Logistics Contractor of demobilization plans E. Duties, Responsibilities, and Actions During an Emergency Event: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  7. Page 107 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 107 of 328 F. Post- Emergency Event Responsibilities and Reports: • Direct relevant documentation to the Planning Section for disposition • Coordinate with the Property Management Services Unit Leader any site remediation or cleanup requirements that are necessary to return the Staging Area to its original condition • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: 2. Primary Documentation: 3. Training Requirements: Electric ☒ Gas ☒ State or Business Unit Emergency Response Plan • EP-ALL-PD-2200B, Staging Area Process Description • EP-ALL-JA-2200B-1, Staging Unit Leader Job Aid • EP-ALL-GDL-1000-STG-1, Staging Area Guidelines for a Pandemic Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • ARCOS Call Out (EP-102) • ARCOS Siren Notification (EP-101) • eLearning: Staging Area Basics (EP-505P) • Initial Staging Area Training (EP-505) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-08 N:\ Drive; The Hub Rev 0 Page 2 of 2
  8. Page 108 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 108 of 328 EP-ALL-EPJD-LOG-09 , Rev. 0 All Hazards Emergency Response Program Effective Date: 10/13/2016 Approval Date: 10/13/2016 Staging Area Supervisor EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Staging Area Supervisor B. Reports To: Staging Area Unit Leader 1. Direct Reports: Staging Area Specialists C. Position Duties and Responsibilities: The Staging Area Supervisor is responsible for managing the day-to-day operations of a staging area and its supporting staff. D. Pre-Event Preparations: • Participate in Staging Area related emergency preparedness exercises and provide feedback about possible opportunities for improvement • Verify, and print copies if needed, of most current versions of process documents, maps, forms, phone numbers, contact sheets, and so on • Assess potential Staging Area locations to determine the viability of the sites in cooperation with the Staging Area Unit Leader, Logistics Contractor, and Property Management Unit Leader • When activated: E. Duties, Responsibilities, and Actions During an Emergency Event: o obtain a briefing from Staging Area Unit Leader including the initial and maximum number of crews and vehicles expected at the Staging Area o report to the designated Staging Area location o determine potential resource requirements for the Staging Area Specialists and request the Staging Area Unit Leader provide additional resources at desired reporting time • Ensure that the Staging Area Signs have been delivered • Ensure all assigned Staging Area Specialists are checked-in, briefed, and assigned their respective duties upon arrival (for example, Busing, Food & Lodging, Traffic Control, Fueling, Security, Parking, and so on) • Refer to the site layout map and coordinate the Staging Area Specialists, Eversource staff, and Logistics contractors/vendors to layout and set up the Staging Area as shown on the Site map • Develop and maintain a Staging Area Roster and ensure a copy is sent to the Staging Area Unit Leader (or placed in the appropriate Eversource Emergency Events N:/Drive folder) • Notify the Staging Area Unit Leader when the Staging Area is ready to receive crews • Participate in the Staging Area conference call hosted by the Staging Area Unit Leader. • Schedule and conduct briefings for the Staging Area Specialists as needed, including Staging Area actions and anticipated activities, status of restoration response, and so on • Brief the next shift relief on current, unusual, and expected actions during next operational period • Participate in the development and implementation of the Demobilization (DMOB) Plan as it relates to the Staging Area • Discontinue Staging Area operations when authorized by Staging Area Unit Leader and/or Logistics Section Chief and prepare for redeployment to new location or demobilization Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  9. Page 109 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 109 of 328 F. Post- Emergency Event Responsibilities and Reports: • Direct relevant documentation to the Planning Section for disposition. • Participate in After Action Review(s) • Begin the demobilization process when notified by the Staging Area Unit Leader and coordinate site demobilization activities with the Logistics Contractor and other vendors • Coordinate with the Staging Area Unit Leader and Property Management Unit Leader regarding any site remediation or cleanup requirements that are necessary to return the Staging Area to its original or better condition Personal Protective Equipment (PPE): G. Equipment Required: • Reflective vest, safety shoes, hard hat, gloves Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Staging area (TBD) I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: • State or Business Unit Emergency Response Plan • EP-ALL-PD-2200B, Staging Area Process Description • EP-ALL-JA-2200B-2A, Staging Area Supervisor Job Aid • EP-ALL-JA-2200B-2B, Staging Area Supervisor Shift Briefing Job Aid • EP-ALL-FRM-1000 A-203C, Staging Area Team / Check-In Team Roster • EP-ALL-GDL-1000-STG-1, Staging Area Guidelines for a Pandemic 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Initial Training • eLearning: Staging Area Basics (EP-505P) • Initial Staging Area Training (EP-505) • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-09 • N:\ drive; The Hub Rev 0 Page 2 of 2
  10. Page 110 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 110 of 328 All Hazards Emergency Response Program Effective Date: 10/13/2016 EP-ALL-EPJD-LOG-10 , Rev. 0 Approval Date: 10/13/2016 Staging Area Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Staging Area Specialist B. Reports To: Staging Area Supervisor 1. Direct Reports: N/A C. Position Duties and Responsibilities: The Staging Area Specialist is responsible for the day to day operations of a staging area including Feeding, Bussing, Fueling, Traffic Control, and Lodging Support. D. Pre-Event Preparations: • Obtain, assemble, and maintain information and materials needed for the emergency event position kit • Participate in Company, local, and state emergency preparedness exercises and drills and provide feedback to the Company about actions that can be taken to ensure continuous improvement • Verify your emergency event position kit is ready • If needed, verify/print copies of most current versions of process documents, maps, forms, phone numbers, contact sheets, and so on • When activated: E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: o report to designated Staging Area location and Check In o obtain a briefing from Staging Area Supervisor including a clear understanding of the assigned roles and responsibilities and working hour requirements • Refer to the site layout map and coordinate with the Staging Area Supervisor and Logistics Contractor to set up and activate the Staging Area • Perform duties as assigned by the Staging Area Supervisor • Obtain necessary information regarding meal times, lodging requirements, hotel bussing requirements, from the Staging Area Supervisor and Logistics Contractor • Monitor the effectiveness of the Staging Area logistics operation and report any required modifications to improve the performance to the Staging Area Supervisor • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Participate in the development and implementation of the Demobilization (DMOB) plan as it relates to the Staging Area • Support the demobilization process when notified by the Staging Area Supervisor and coordinate site demobilization activities with the Logistics Contractor • Continue to support logistic functions until Staging or Receiving Area operations are completed. • When notified by the Staging Area Supervisor, stand down and, as directed, either report to the next emergency event location or to your Blue Sky role Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)