Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 141 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 141 of 328 Equipment and Supplies: G. Equipment Required: • Phone • Computer Personal: • 1. Safety Requirements: Any personal needs for multiple days away from home Personal Protective Equipment (PPE): • N/A – If in the ICC/EOC/AWC If not working remotely, appropriate clothing for weather conditions, including anti-slip footwear as needed H. Position Work Location: Remote or as assigned I. Work Period: 8-16+ hour work period per day J. Activation Notification: Call Out, email, Teams, phone SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Initial Training • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Food Services Request and Tracking Tool (EP-503T) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LOG-36 Food Services Request and Tracking Tool (EP-503T) SharePoint, Teams, Shared Lodging Support email box, Maximo (for DRs), FSRTT Rev 1 Page 2 of 3
  2. Page 142 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 142 of 328 EP-ALL-EPJD-LOG-36 Rev 1 Page 3 of 3
  3. Page 143 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 143 of 328 All Hazards Emergency Response Program Effective Date: 7/8/2016 EP-ALL-EPJD-LSN-01 , Rev. 1 Approval Date: 7/8/2016 Liaison Officer EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Liaison Officer B. Reports To: Incident Commander 1. Direct Reports: • Community Liaison Unit Leader • Government Affairs Liaison • Assistant Liaison Officer – Escalation C. Position Duties and Responsibilities: The Liaison Officer is responsible for maintaining an information exchange and related coordination with the Incident Management Team (IMT) and, municipal officials, and government and non-government organizations, as required D. Pre-Event Preparations: • Ensure the staffing rosters for the Liaison Officer’s staff positions are up to date and ready to be used • The position ensures annual meetings are held by the Government Affairs Liaison or Community Liaison Unit Leader for employees whose primary emergency assignment differs from their Blue-Sky position. The meeting will: E. Duties, Responsibilities, and Actions During an Emergency Event: • Review the processes related to employees’ primary emergency assignment • Review employees’ completion of related training • Review tasks and tools associated with employees’ primary emergency assignment • Review the obligation of all employees to report to work when activated and that employees are aware of notification methods • Deploy to ICC as directed, report to Incident Commander, and obtain a briefing • Implement pre-event notifications to key stakeholders, including emergency planning officials, municipal officials, government and non-government organizations, and others as required, in coordination with the Communications Officer • Disseminate information to the Liaison organization • Ensure all required tools and technology are operating and available for use • Participate in monthly and pre-storm refresher skills training, as needed • Following activation of the IMT, notify and activate required Liaison support staff • Arrange and communicate staffing requirements and shift rotation for Liaison positions • Ensure Liaisons are briefed on incident conditions and provide overall direction to regarding messaging for key stakeholders • Collaborate with the Communications Officer to oversee the development of communication materials for use by the Liaison organization • Ensure the Liaison organization works with municipal officials to share information, including identification of community priorities as needed • Schedule update meetings or conference calls with the Liaison organization as needed • Inform the Incident Commander (IC) and General Staff of areas of concern and opportunities for coordination • Communicate and coordinate the applicable portions of the Demobilization Plan with stakeholders Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.
  4. Page 144 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 144 of 328 F. Post- Emergency Event Responsibilities and Reports: • Direct relevant documentation to the Planning Section • Conduct debrief with Liaison Section • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Initial Community Liaison Training (EP-402) • eLearning: OMS Customer Outage Communications (ETRs) (EP-604) • Initial Gas Emergency Preparedness Training (EP-301) • Community Liaison Unit Leader Training (EP-403) • NGA Natural Gas Safety Training Certification (EP-302) • OUA Role Based Dashboards for Community Relations (EP-DET-OUA-12) • eLearning: Municipal Hub (EP-407) • Gas Outage Portal Training (EP-313) • Initial Training Electric Supply Deficiency/Controlled Outages for Gas IMT (EP 308) Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-LSN-01 • Refresher Training Electric Supply Deficiency/Controlled Outages for Gas IMT (EP 308R) • Community Liaison Refresher (EP-402R) Eversource N:\ Drive, SharePoint, Teams, and PowerBI, OUA Rev 1 Page 2 of 2
  5. Page 145 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 145 of 328 All Hazards Emergency Response Program Effective Date: 12/16/2022 EP-ALL-EPJD-LSN-03, Rev. 0 Approval Date: 6/25/2021 Community Liaison Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Community Liaison Unit Leader B. Reports To: Liaison Officer 1. Direct Reports: Community Liaison C. Position Duties and Responsibilities: The Community Liaison Unit Leader coordinates with the Community Liaisons and the Liaison officer to provide a conduit for bi-directional information, support, notification, and communications with community officials. D. Pre-Event Preparations: • Assess availability, activate, and deploy unit personnel as directed • Review lists of contact information for municipal officials and update as necessary • Initiate pre-event communications to municipal officials, in coordination with the Communications Officer • Work with the Liaison Officer to ensure that key messages and information are being communicated on an on-going basis to the designated points of contact for their assigned communities • Direct the work of the Community Liaisons located in the Regional Emergency Operations Centers (EOC), including overseeing the outreach and communications efforts of the Community Liaisons with their assigned communities • Acts as the central point for Community Liaisons to receive guidance, track down specific information, or engage the Operations Branch Director or others to resolve issues raised by community officials • Work with the Government Affairs Liaison if requested to research local restoration issues raised by governmental personnel • Work closely with the Operations Branch Directors in the Regional EOC to ensure consistent and accurate information is being released to community officials in the towns the Region serves • Arrange and communicate staffing assignments for the Community Liaisons in their regions • Participate with the Operations Branch Director in the Regional EOC in regularly scheduled conference calls and incident briefings • Provide periodic briefings to the Community Liaisons each day to ensure up-to-date information flow • Participate in monthly and pre-storm refresher skills training, as needed • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Ensure that event records are finalized and stored in the designated shared folder and/or forwarded to the Liaison Officer • Conduct demobilization process to return to normal business operations • Provide debrief of Community Relations and municipal official outreach efforts for their Regions to improve responsiveness and effectiveness during future incidents E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  6. Page 146 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 146 of 328 Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ICC/EOC/AWC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: EOC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Initial Community Liaison Training (EP-402) • Community Liaison Unit Leader Training (EP-403) • NGA Natural Gas Safety Training Certification (EP-302) • eLearning: Municipal Hub (EP-407) • OUA Role Based Dashboards for Community Relations (EP-DET-OUA-12) • Gas Outage Portal Training (EP-313) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LSN-03 EP 402 Community Liaison Refresher Training (EP-402R) – Annual Eversource N:\ Drive, Pulse Secure VPN Access, SharePoint, Teams, Power BI, OUA Rev 0 Page 2 of 2
  7. Page 147 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 147 of 328 All Hazards Emergency Response Program Effective Date: 12/16/2022 EP-ALL-EPJD-LSN-05, Rev. 0 Approval Date: 6/25/2021 Community Liaison EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Community Liaison B. Reports To: Community Liaison Unit Leader 1. Direct Reports: N/A C. Position Duties and Responsibilities: The Community Liaison is the interface with towns and municipalities, providing the conduit for real-time information, support, notification, coordination, and communications between municipal officials and the Company for system restoration, including communication of mutual assistance activities. The Community Liaison is responsible for identifying critical information and issues to be relayed to the Community Liaison Unit Leader, and ultimately to the Liaison Officer, including issues such as damage assessment data, blocked roads, and requests to address emergent priorities that need to be relayed. D. Pre-Event Preparations: • Provide availability schedule to the Community Liaison Unit leader • Initiate “pre-event” phone calls to Emergency Managers in each town, and log results of phone calls on the Municipal Log • Participate in Pre-Job Refresher briefings • Participate in monthly and pre-storm refresher skills training, as needed Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  8. Page 148 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 148 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Call town officials to provide Eversource Point of Contact (PoC) information and to determine primary point of contact in the town for the event • Share town PoC information with Community Liaison Unit Leader • Keep call logs by town, each day of the event • Participate on conference calls with the Community Liaison Unit Leader • At shift change, reach out to impacted towns to provide the name of the Eversource contact and provide any status update • Answer Community Liaison telephone line and provide support to callers, including: o Research issues as needed o Escalate issues to the Community Liaison Unit Leader o Transfer callers to the E911 customer o Help towns prioritize events escalated through the Liaison telephone line • Work with the Community Liaison Unit Leader to share restoration information with the Operations Branch Director in their assigned communities • Interface with the Operations Branch Director at the Emergency Operations Center (EOC) and response personnel to understand the focus and progress of restoration in their assigned communities and share back to the EOC team critical issues raised by a town’s representative • Coordinate communications and messaging of municipal officials with the Community Liaison Unit Leader to ensure consistency and timeliness of information • Provide email and telephone updates to municipal emergency incident commanders in their towns • Research restoration-related issues with representatives of the EOC response team to address questions raised by municipal officials • Research the status of restoration for highly escalated customer calls • Coordinate messaging and outreach efforts with other Community Liaisons in the Region (and other Regional Restoration Management Teams (RMT), if serving the same community) through the Community Liaison Unit Leader • Participate in regularly scheduled conference calls and incident briefings arranged by the Liaison Officer • Coordinate with the Public Safety Specialist on the road-clearing process • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Call towns where outages may still exist and communicate expected ETRs and staffing strategies to get remaining customers online • Scan call logs to PDF documents and forward to the Community Liaison Unit Leader • Provide input to debrief process following a storm Personal Protective Equipment (PPE): • N/A if in the EOC/AWC • Reflective vest, safety shoes, safety glasses, hard hat if in the field Equipment and Supplies: • Phone • Computer Personal: • H. Position Work Location: EP-ALL-EPJD-LSN-05 Appropriate clothing for weather conditions and any personal needs for multiple days away from home EOC or AWC, as directed Rev 0 Page 2 of 3
  9. Page 149 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 149 of 328 I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Initial Community Liaison Training (EP-402) • NGA Natural Gas Safety Training Certification (EP-302) • Gas ERP Training for External Affairs (Liaison & Regulatory) (EP-406) • eLearning: Municipal Hub (EP-407) • OUA Role Based Dashboards for Community Relations (EP-DET-OUA-12) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-LSN-05 Community Liaison Refresher Training (EP-402R) – Annual Eversource N:\ Drive, Pulse Secure VPN Access, SharePoint, Teams, Power BI, OUA Rev 0 Page 3 of 3
  10. Page 150 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 150 of 328 EP-ALL-EPJD-LSN-07, Rev. 0 All Hazards Emergency Response Program Effective Date: 12/16/2022 Approval Date: 4/27/2020 Government Affairs Liaison EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Government Affairs Liaison B. Reports To: Liaison Officer 1. Direct Reports: N/A C. Position Duties and Responsibilities: Communicates with and provides reports to state agencies and legislators. D. Pre-Event Preparations: • Coordinate communication with state agencies and legislators regarding the Company’s ERP actions • Maintain up-to-date contact information for state agencies and legislators prior to activation, and reach out periodically to remain current • Respond to requests for information from state agencies and legislators • Provide the Liaison Officer with periodic updates • Coordinate with the Communications Officer to ensure the alignment of public information messaging and talking points • Participate in monthly and pre-storm refresher skills training, as needed • Notify state agencies and legislators of an emergency event, as needed • Coordinate communication and information sharing with state agencies and legislators • Respond to requests from state agencies and legislators • Provide the Liaison Officer with periodic updates • Collect information for development of After Action Review, and provide to Liaison Officer • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continutiy Documentation Database.

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)