Interrogatory responses
Answers to questions 30, 33, 36, 37, 40
Files13
EOE-030_final.pdf
PDF · 85 KB · 1 pageText searchable
Download EOE-030_final.pdfRead the text of EOE-030_final.pdf
EOE-030 Attachment 1.pdf
PDF · 816 KB · 1 pageText searchable
Download EOE-030 Attachment 1.pdfRead the text of EOE-030 Attachment 1.pdf
EOE-030 Attachment 1.xlsx
Excel · 33 KBText searchable
Download EOE-030 Attachment 1.xlsxRead the text of EOE-030 Attachment 1.xlsx
EOE-033_final.pdf
PDF · 109 KB · 2 pagesText searchable
Download EOE-033_final.pdfRead the text of EOE-033_final.pdf
EOE-036 Attachment 1.pdf
PDF · 825 KB · 5 pagesText searchable
Download EOE-036 Attachment 1.pdfRead the text of EOE-036 Attachment 1.pdf
EOE-036_final.pdf
PDF · 83 KB · 1 pageText searchable
Download EOE-036_final.pdfRead the text of EOE-036_final.pdf
EOE-037_final.pdf
PDF · 97 KB · 1 pageText searchable
Download EOE-037_final.pdfRead the text of EOE-037_final.pdf
EOE-037 Attachment 1.pdf
PDF · 89 KB · 1 pageText searchable
Download EOE-037 Attachment 1.pdfRead the text of EOE-037 Attachment 1.pdf
EOE-037 Attachment 1.xlsx
Excel · 23 KBText searchable
Download EOE-037 Attachment 1.xlsxRead the text of EOE-037 Attachment 1.xlsx
EOE-040_final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-040_final.pdfRead the text of EOE-040_final.pdf
EOE-040 Attachment 1.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-040 Attachment 1.pdfRead the text of EOE-040 Attachment 1.pdf
EOE-040 Attachment 2.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-040 Attachment 2.pdfRead the text of EOE-040 Attachment 2.pdf
EOE-040 Attachment 3.pdf
PDF · 12 MB · 328 pagesText searchable
Download EOE-040 Attachment 3.pdfRead the text of EOE-040 Attachment 3.pdf
Text of EOE-033_final.pdf
Extracted from the file · 2 pages · 2,411 characters
Text of EOE-036 Attachment 1.pdf
Extracted from the file · 5 pages · 10,251 characters
Text of EOE-036_final.pdf
Extracted from the file · 1 page · 605 characters
Text of EOE-037_final.pdf
Extracted from the file · 1 page · 1,678 characters
Text of EOE-037 Attachment 1.pdf
Extracted from the file · 1 page · 1,360 characters
Text of EOE-037 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of EOE-040_final.pdf
Extracted from the file · 1 page · 1,218 characters
Text of EOE-040 Attachment 1.pdf
Extracted from the file · 108 pages · 301,257 characters
Text of EOE-040 Attachment 2.pdf
Extracted from the file · 108 pages · 299,821 characters
Page 209 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 209 of 328 All Hazards Emergency Response Program Effective Date: 7/8/2016 EP-ALL-EPJD-OP-32 , Rev. 0 Approval Date: 7/8/2016 Field Group Manager (CT & MA) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Field Group Manager (CT & MA) B. Reports To: Transmission Branch Director 1. Direct Reports: Field Supervisors C. Position Duties and Responsibilities: The Field Group Manager coordinates and manages Damage Assessment (DA) and field activities associated with repairs to the transmission system. D. Pre-Event Preparations: • Ensure adequate field personnel are available for the expected duration of the event • Following activation of the IMT, activate any required Field Group personnel, develop a staffing schedule, and provide initial staffing plans to the Operations Section Chief and the Logistics Section • Conduct an initial briefing and routine update meetings and briefings with Field Group personnel • Ensure the provisions of Eversource union agreements are observed • Ensure all of the Field Group equipment is ready for use and operational (that is, bucket trucks, lifts, off road vehicles, test equipment, cranes, and other rental equipment) • Collaborate with the Vegetation Management Unit Leader and gather contact information required for tree crew coordination and assistance • Verify with the Logistics Services Branch Director, as needed, that there are an adequate number of vehicles (including possible rentals), whether vehicle wheel chains are necessary, if there is an adequate stock of poles, cross arms, and conductor, and so on, and that the stock is reasonably distributed • Ensure safety of tactical operations and exercise emergency authority to stop and prevent unsafe acts • Oversee repairs and restoration of transmission lines and equipment consistent with the work plan • Inform the Transmission Branch Director if additional resources are required • Coordinate with the applicable Dispatch Authority to perform the necessary switching and tagging and requirements • Ensure the appropriate and effective distribution of the Transmission restoration crews among the damage locations based on the estimated time to restore each line • Provide continual assessment of restoration progress and allocate resources as necessary • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Ensure outside contractor time sheets are forwarded to appropriate financial personnel E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.Page 210 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 210 of 328 Personal Protective Equipment (PPE): G. Equipment Required: • Reflective vest, safety shoes, hard hat Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Field I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-32 Eversource N:\ Drive Rev 0 Page 2 of 2Page 211 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 211 of 328 EP-ALL-EPJD-OP-34 , Rev. 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Dispatch Group Manager (CT & MA) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Dispatch Group Manager (CT & MA) B. Reports To: Transmission Branch Director 1. Direct Reports: Dispatch Supervisor C. Position Duties and Responsibilities: The Dispatch Group Manager position during emergencies is the same as the Manager, Operations CONVEX for CT and Bulk Power operations for MA. Responsible for ensuring that all transmission-related operations are implemented as described in procedures and other applicable documentation. D. Pre-Event Preparations: • Ensure adequate staffing is available for the expected duration of the event • Ensure the provisions of Eversource union agreements are observed • Ensure safety of tactical operations and exercise emergency authority to stop and prevent unsafe acts • Ensure the necessary actions are implemented to achieve the IAP strategy and goals • Coordinate with the applicable RMT System Operator to perform the necessary distribution switching and tagging and requirements • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the Control Center Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Transmission Operations Center (TOC) I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Lotus Notes Database.Page 212 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 212 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-34 Eversource N:\ Drive Rev 0 Page 2 of 2Page 213 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 213 of 328 EP-ALL-EPJD-OP-43, Rev. 0 All Hazards Emergency Response Program Effective Date: 8/11/2022 Approval Date: 5/15/2019 Operations Analyst EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Operations Analyst B. Reports To: Assistant Operations Section Chief 1. Direct Reports: None C. Position Duties and Responsibilities: The Operations Analyst assists the assigned Branch/Group (Wire Guard (WG) and Service Crew (SC) units) in compiling relevant data to support the mission, including reporting. D. Pre-Event Preparations: • Participate in pre-event planning, as requested. • Assist with pre-event statistics and reporting for assigned area. • Monitor/maintain data streams & dashboards for assigned process(es) • Monitor the Outage Management System (OMS) data and forward needed model changes to a Modeler or Coordinator • Develop reporting to accurately reflect process progress and identify areas requiring management attention • Provide reports, work plans, & analysis of the process work queue • Provide advisory support for optimizing process efficiency • When necessary, provide support to other Eversource state or business unit WG and SC branches. Ensure any reporting for or from the responding state or business unit WG/SC personnel is channeled through the requesting state or business unit’s Operations Analyst • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in office location Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Designated office locations I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.Page 214 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 214 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: NA 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Initial OMS Training – Coordinators (EP-603A) Refresher Training • 4. Required System / Drives Access: EP-ALL-PJD-OP-43 Eversource N:\ Drive, Teams, SharePoint, OMS Rev 0 Page 2 of 2Page 215 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 215 of 328 EP-ALL-EPJD-OP-44, Rev. 0 All Hazards Emergency Response Program Effective Date: 9/28/2022 Approval Date: 9/28/2022 Substation Branch Director (CT/MA only) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Substation Branch Director B. Reports To: Operations Section Chief 1. Direct Reports: • Substation Group Manager • Group Manager Field Communications and Engineering C. Position Duties and Responsibilities: The Substation Branch Director has the overall responsibility to support the safe and reliable operation and restoration of the substations and communications equipment in Connecticut and Massachusetts. D. Pre-Event Preparations: • Ensure the staffing rosters for all Substation Branch positions are up-to-date and ready to be used • Understand the provisions of the company union agreements as they are interpreted under emergency operations • Deploy to the Incident Command Center (ICC) as directed, report to the Operations Section Chief, and obtain a situational awareness and strategy briefing • Following activation of the Incident Management Team (IMT), activate the required Substation Branch personnel as requested, develop staffing schedules, and provide initial staffing plans to the Operations Section Chief and the Resource Section • Conduct an initial briefing and routine update meetings and briefings with Substation Branch personnel • Ensure the Substation Branch personnel have a dedicated area to set up in the ICC or Emergency Operations Center (EOC) with all the necessary equipment, supplies, and support • Inform the Operations Section Chief of additional Substation Branch resource requirements • Ensure checks and repairs on radio repeater locations, back-up generators and fuel, and vehicles have been performed • Ensure Satellite phones have been activated, tested and assigned to key personnel (MA) • Ensure inspections of key substations have been performed • Ensure the Substation Branch executes the work plan to achieve the Incident Action Plan (IAP) Operational Period goals • Request additional resources to support the Substation Branch tactical operations as required • Ensure safety procedures and protocols are being adhered to and exercise authority to stop or prevent any unsafe acts • Obtain a preliminary assessment of the number of customers affected and substations or circuits impacted • Ensure the Substation Branch coordinates with the applicable EOC Restoration Management Team (RMT) for requested switching and tagging • Coordinate with the Transmission Section to support transmission repairs that require switching and tagging or access to substations E. Duties, Responsibilities, and Actions During an Emergency Event: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.Page 216 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 216 of 328 F. Post- Emergency Event Responsibilities and Reports: • Provide continual assessment of restoration progress and allocate resources where necessary • Prepare status updates and provide to the Operations Section Chief • Ensure that the positions within the Branch execute their specific duties and responsibilities effectively • Support the development of a demobilization plan to return to normal business operations • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ICC/EOC/AWC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC or EOC as directed I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-44 Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 2 of 2Page 217 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 217 of 328 EP-ALL-EPJD-OP-45, Rev. 0 All Hazards Emergency Response Program Effective Date: 9/23/2024 Approval Date: 9/23/2024 Pole Setting Branch Director EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Pole Setting Branch Director B. Reports To: Operations Section Chief 1. Direct Reports: Pole Setting Coordinator Dig Safe Coordinator C. Position Duties and Responsibilities: The Pole Setting Branch Director ensures that the positions within the Branch execute their specific duties and responsibilities consistent with the Pole Setting Service Plan. The Pole Setting Branch Director is responsible for overseeing the conversion of the Incident Action Plan’s strategic goals into executable tactical plans that implement the company’s restoration priorities. The Pole Setting Branch Director monitors the overall effectiveness of the field restoration activities for the Pole Setting Crews to accomplish the stated Incident Action Plan goals. The Pole Setting Branch Director collects and disseminates information pertaining to the overall operational progress and direction among the Pole Setting Coordinators, Dig Safe Coordinators, the Incident Management Team (IMT), and the Restoration Management Teams (RMT). The Pole Setting Branch Director, working under the direction of the Operations Section Chief, closely collaborates with the Planning and Logistics Section Chiefs to ensure that the required Pole Setting resources are being effectively obtained, allotted, tracked, and appropriately cared for. 1. Physical Requirements: 2. Skills/Abilities: Driving Reaching above shoulder Lifting, pushing/pulling, carrying Bending ❑ Balancing Performing manual dexterity Ability to lift up to 20 lbs. ❑ Standing for long periods Exposed to extremes in temperature/humidity Excellent communication skills Excellent computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours ❑ Maintain ESOP-100 APL (Authorized Persons List) Qualification ❑ Proficiency with e Operations Mobile Application (OMA) application Walking ❑ Stair climbing Prolonged hours sitting ❑ Working at heights ❑ Operating heavy equipment ❑ Kneeling Traveling ❑ Working with hazardous equipment ❑ Excellent interpersonal/phone skills Excellent time management skills Ability to prioritize & delegate as needed ❑ Proficiency with ARCOS application Proficiency with Outage Management System software Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.Page 218 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 218 of 328 D. Pre-Event Preparations: E. Duties, Responsibilities, and Actions During an Emergency Event: • Assess availability, activate, and deploy Branch personnel as needed • Coordinate Pole Setting Branch activation with the Operations Section Chief • Coordinate, within the Pole Setting Branch, anticipated Pole Setting Resource needs • Set up Broken Pole Tracker for event • Work with Logistics Section Procurement Unit to identify material laydown sites, material needs, and so on • Ensure all required PPE is in order • Fully charge all portable devices • Ensure knowledge and understanding of the OMS including the damage assessment and the referral processes • Ensure Food and Lodging requirements for the unit have been communicated • Oversee the preparation of the Pole Setting Service Plan to include developing a strategy for setting poles throughout the Eversource Service Territory • Monitor and redeploy Branch resources to areas of need as required or directed by the Operations Section Chief • Notify Resource Acquisition/Tracking Branch of any authorized resource movement • Notify the Operations Section Chief if additional resources are needed to support the Pole Setting effort • Ensure positions within the Branch execute their specific duties and responsibilities • When notified that demobilization is being considered, develop overall strategy for final release of Branch resources in the most efficient and cost effective manner • Release any contract personnel to the Resource Acquisition/Tracking Branch for demobilization or redeployment • F. Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Direct relevant documentation to the Planning Section for disposition • Direct relevant documentation to Emergency Preparedness for Regulatory reporting • Ensure all models and data are saved for post-event analysis • Ensure outside contractor time sheets are forwarded to appropriate financial personnel • Participate in After Action Review(s) Equipment and Supplies: • Phone • Computer • Workstation set up (Dual monitors, docking station, and so on) • Satellite Phone Personal: • 1. Safety Requirements: Appropriate clothing for weather conditions and any personal needs for multiple days away from home Personal Protective Equipment (PPE): • N/A – If in the AWC • Reflective vest, safety shoes, hard hat H. Position Work Location: Area Work Center or specific reporting location as directed I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out, Phone, Text, or Email EP-ALL-EPJD-OP-45 Rev 0 Page 2 of 3
As listed on the current system
Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026