Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 211 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 211 of 328 EP-ALL-EPJD-OP-34 , Rev. 0 All Hazards Emergency Response Program Effective Date: 7/8/2016 Approval Date: 7/8/2016 Dispatch Group Manager (CT & MA) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Dispatch Group Manager (CT & MA) B. Reports To: Transmission Branch Director 1. Direct Reports: Dispatch Supervisor C. Position Duties and Responsibilities: The Dispatch Group Manager position during emergencies is the same as the Manager, Operations CONVEX for CT and Bulk Power operations for MA. Responsible for ensuring that all transmission-related operations are implemented as described in procedures and other applicable documentation. D. Pre-Event Preparations: • Ensure adequate staffing is available for the expected duration of the event • Ensure the provisions of Eversource union agreements are observed • Ensure safety of tactical operations and exercise emergency authority to stop and prevent unsafe acts • Ensure the necessary actions are implemented to achieve the IAP strategy and goals • Coordinate with the applicable RMT System Operator to perform the necessary distribution switching and tagging and requirements • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the Control Center Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Transmission Operations Center (TOC) I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Lotus Notes Database.
  2. Page 212 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 212 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-34 Eversource N:\ Drive Rev 0 Page 2 of 2
  3. Page 213 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 213 of 328 EP-ALL-EPJD-OP-43, Rev. 0 All Hazards Emergency Response Program Effective Date: 8/11/2022 Approval Date: 5/15/2019 Operations Analyst EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Operations Analyst B. Reports To: Assistant Operations Section Chief 1. Direct Reports: None C. Position Duties and Responsibilities: The Operations Analyst assists the assigned Branch/Group (Wire Guard (WG) and Service Crew (SC) units) in compiling relevant data to support the mission, including reporting. D. Pre-Event Preparations: • Participate in pre-event planning, as requested. • Assist with pre-event statistics and reporting for assigned area. • Monitor/maintain data streams & dashboards for assigned process(es) • Monitor the Outage Management System (OMS) data and forward needed model changes to a Modeler or Coordinator • Develop reporting to accurately reflect process progress and identify areas requiring management attention • Provide reports, work plans, & analysis of the process work queue • Provide advisory support for optimizing process efficiency • When necessary, provide support to other Eversource state or business unit WG and SC branches. Ensure any reporting for or from the responding state or business unit WG/SC personnel is channeled through the requesting state or business unit’s Operations Analyst • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in office location Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Designated office locations I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  4. Page 214 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 214 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: NA 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Initial OMS Training – Coordinators (EP-603A) Refresher Training • 4. Required System / Drives Access: EP-ALL-PJD-OP-43 Eversource N:\ Drive, Teams, SharePoint, OMS Rev 0 Page 2 of 2
  5. Page 215 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 215 of 328 EP-ALL-EPJD-OP-44, Rev. 0 All Hazards Emergency Response Program Effective Date: 9/28/2022 Approval Date: 9/28/2022 Substation Branch Director (CT/MA only) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Substation Branch Director B. Reports To: Operations Section Chief 1. Direct Reports: • Substation Group Manager • Group Manager Field Communications and Engineering C. Position Duties and Responsibilities: The Substation Branch Director has the overall responsibility to support the safe and reliable operation and restoration of the substations and communications equipment in Connecticut and Massachusetts. D. Pre-Event Preparations: • Ensure the staffing rosters for all Substation Branch positions are up-to-date and ready to be used • Understand the provisions of the company union agreements as they are interpreted under emergency operations • Deploy to the Incident Command Center (ICC) as directed, report to the Operations Section Chief, and obtain a situational awareness and strategy briefing • Following activation of the Incident Management Team (IMT), activate the required Substation Branch personnel as requested, develop staffing schedules, and provide initial staffing plans to the Operations Section Chief and the Resource Section • Conduct an initial briefing and routine update meetings and briefings with Substation Branch personnel • Ensure the Substation Branch personnel have a dedicated area to set up in the ICC or Emergency Operations Center (EOC) with all the necessary equipment, supplies, and support • Inform the Operations Section Chief of additional Substation Branch resource requirements • Ensure checks and repairs on radio repeater locations, back-up generators and fuel, and vehicles have been performed • Ensure Satellite phones have been activated, tested and assigned to key personnel (MA) • Ensure inspections of key substations have been performed • Ensure the Substation Branch executes the work plan to achieve the Incident Action Plan (IAP) Operational Period goals • Request additional resources to support the Substation Branch tactical operations as required • Ensure safety procedures and protocols are being adhered to and exercise authority to stop or prevent any unsafe acts • Obtain a preliminary assessment of the number of customers affected and substations or circuits impacted • Ensure the Substation Branch coordinates with the applicable EOC Restoration Management Team (RMT) for requested switching and tagging • Coordinate with the Transmission Section to support transmission repairs that require switching and tagging or access to substations E. Duties, Responsibilities, and Actions During an Emergency Event: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  6. Page 216 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 216 of 328 F. Post- Emergency Event Responsibilities and Reports: • Provide continual assessment of restoration progress and allocate resources where necessary • Prepare status updates and provide to the Operations Section Chief • Ensure that the positions within the Branch execute their specific duties and responsibilities effectively • Support the development of a demobilization plan to return to normal business operations • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ICC/EOC/AWC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC or EOC as directed I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-OP-44 Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 2 of 2
  7. Page 217 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 217 of 328 EP-ALL-EPJD-OP-45, Rev. 0 All Hazards Emergency Response Program Effective Date: 9/23/2024 Approval Date: 9/23/2024 Pole Setting Branch Director EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Pole Setting Branch Director B. Reports To: Operations Section Chief 1. Direct Reports: Pole Setting Coordinator Dig Safe Coordinator C. Position Duties and Responsibilities: The Pole Setting Branch Director ensures that the positions within the Branch execute their specific duties and responsibilities consistent with the Pole Setting Service Plan. The Pole Setting Branch Director is responsible for overseeing the conversion of the Incident Action Plan’s strategic goals into executable tactical plans that implement the company’s restoration priorities. The Pole Setting Branch Director monitors the overall effectiveness of the field restoration activities for the Pole Setting Crews to accomplish the stated Incident Action Plan goals. The Pole Setting Branch Director collects and disseminates information pertaining to the overall operational progress and direction among the Pole Setting Coordinators, Dig Safe Coordinators, the Incident Management Team (IMT), and the Restoration Management Teams (RMT). The Pole Setting Branch Director, working under the direction of the Operations Section Chief, closely collaborates with the Planning and Logistics Section Chiefs to ensure that the required Pole Setting resources are being effectively obtained, allotted, tracked, and appropriately cared for. 1. Physical Requirements: 2. Skills/Abilities: Driving Reaching above shoulder Lifting, pushing/pulling, carrying Bending ❑ Balancing Performing manual dexterity Ability to lift up to 20 lbs. ❑ Standing for long periods Exposed to extremes in temperature/humidity Excellent communication skills Excellent computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours ❑ Maintain ESOP-100 APL (Authorized Persons List) Qualification ❑ Proficiency with e Operations Mobile Application (OMA) application Walking ❑ Stair climbing Prolonged hours sitting ❑ Working at heights ❑ Operating heavy equipment ❑ Kneeling Traveling ❑ Working with hazardous equipment ❑ Excellent interpersonal/phone skills Excellent time management skills Ability to prioritize & delegate as needed ❑ Proficiency with ARCOS application Proficiency with Outage Management System software Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.
  8. Page 218 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 218 of 328 D. Pre-Event Preparations: E. Duties, Responsibilities, and Actions During an Emergency Event: • Assess availability, activate, and deploy Branch personnel as needed • Coordinate Pole Setting Branch activation with the Operations Section Chief • Coordinate, within the Pole Setting Branch, anticipated Pole Setting Resource needs • Set up Broken Pole Tracker for event • Work with Logistics Section Procurement Unit to identify material laydown sites, material needs, and so on • Ensure all required PPE is in order • Fully charge all portable devices • Ensure knowledge and understanding of the OMS including the damage assessment and the referral processes • Ensure Food and Lodging requirements for the unit have been communicated • Oversee the preparation of the Pole Setting Service Plan to include developing a strategy for setting poles throughout the Eversource Service Territory • Monitor and redeploy Branch resources to areas of need as required or directed by the Operations Section Chief • Notify Resource Acquisition/Tracking Branch of any authorized resource movement • Notify the Operations Section Chief if additional resources are needed to support the Pole Setting effort • Ensure positions within the Branch execute their specific duties and responsibilities • When notified that demobilization is being considered, develop overall strategy for final release of Branch resources in the most efficient and cost effective manner • Release any contract personnel to the Resource Acquisition/Tracking Branch for demobilization or redeployment • F. Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Direct relevant documentation to the Planning Section for disposition • Direct relevant documentation to Emergency Preparedness for Regulatory reporting • Ensure all models and data are saved for post-event analysis • Ensure outside contractor time sheets are forwarded to appropriate financial personnel • Participate in After Action Review(s) Equipment and Supplies: • Phone • Computer • Workstation set up (Dual monitors, docking station, and so on) • Satellite Phone Personal: • 1. Safety Requirements: Appropriate clothing for weather conditions and any personal needs for multiple days away from home Personal Protective Equipment (PPE): • N/A – If in the AWC • Reflective vest, safety shoes, hard hat H. Position Work Location: Area Work Center or specific reporting location as directed I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out, Phone, Text, or Email EP-ALL-EPJD-OP-45 Rev 0 Page 2 of 3
  9. Page 219 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 219 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan Gas ☐ Pole Setting Service Plan (EP-ALL-PD-1000-POLE) Broken Pole Tracker Spreadsheet (available from the State or Business Unit EP Manager) 3. Training Requirements: Initial Training • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Annual Pole Setting Branch Training (EP-705) • OMS Pole Replacement Coordination (SOT-OMS-11) Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-OP-45 • Annual Pole Setting Branch Training (EP-705) • OMS Pole Replacement Coordination (SOT-OMS-11) Eversource N:\ Drive, SharePoint, Teams, OMS Rev 0 Page 3 of 3
  10. Page 220 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 220 of 328 EP-ALL-EPJD-OP-46, Rev. 0 All Hazards Emergency Response Program Effective Date: 9/23/2024 Approval Date: 9/23/2024 Pole Setting Coordinator EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Pole Setting Coordinator B. Reports To: Pole Setting Branch Director 1. Direct Reports: Digger Crew Lead C. Position Duties and Responsibilities: 1. Physical Requirements: 2. Skills/Abilities: D. Pre-Event Preparations: • • Reviews and dispositions Pole Setting Restoration Management Team (RMT) Operations Coordination Support Specialist, and Operations Coordinator on the RMT • • Communicates with Digger Crew Leads working in the field, and updates events in the OMS with work progress, and estimated times for completion • • Communicates with the RMT regarding work status Driving Reaching above shoulder Lifting, pushing/pulling, carrying Bending ❑ Balancing Performing manual dexterity Ability to lift up to 20 lbs. ❑ Standing for long periods Exposed to extremes in temperature/humidity Excellent communication skills Excellent computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours ❑ Maintain ESOP-100 APL (Authorized Persons List) Qualification ❑ Proficiency with e Operations Mobile Application (OMA) application Walking ❑ Stair climbing Prolonged hours sitting ❑ Working at heights ❑ Operating heavy equipment ❑ Kneeling Traveling ❑ Working with hazardous equipment Excellent interpersonal /phone skills Excellent time management skills Ability to prioritize & delegate as needed ❑ Proficiency with ARCOS application Proficiency with Outage Management System software • Ensure all required PPE is in order • Fully charge all portable devices • Ensure knowledge and understanding of OMS, including the damage assessment and referral processes • Participate on Pole Setting Branch Director pre-event conference calls and discuss availability with Branch Director • Log in to OMS and review training materials and other job aids, address any technology issues Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)