Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 231 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 231 of 328 H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Initial Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-01 Eversource N:\ Drive, Teams, SharePoint Rev 0 Page 3 of 3
  2. Page 232 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 232 of 328 All Hazards Emergency Response Program Effective Date: 4/27/2016 EP-ALL-EPJD-PLN-02 , Rev. 0 Approval Date: 4/27/2016 Planning Branch Director - Forecasting EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning Branch Director - Forecasting B. Reports To: Planning Section Chief 1. Direct Reports: • Planning & ETR Specialist • Event Statistician Specialist • GIS Specialist C. Position Duties and Responsibilities: The Planning Branch Director - Forecasting oversees the collection, analysis, estimating and reporting of pre- and post-impact system data to provide situational awareness to the Planning Section Chief, Incident Commander, and other members of the Incident Management Team (IMT). The Planning Branch Director - Forecasting is responsible for ensuring the timely updating of models and dashboards and for analyzing, determining, and maintaining current Estimated Times to Restoration (ETR) for the overall State, Regions, RMTs, and Towns within the IMT’s area of responsibility. Along with determining ETRs, collaborates with the Planning Branch Director Tactical on priorities and with the Communications Officer to develop and publish the Global Restoration Messages, once they are approved. D. Pre-Event Preparations: • Ensure the staffing rosters for the Planning Branch Forecasting’s staff positions are up to date and ready to be used • Support the Planning Section Chief in conducting the annual Section Meeting with all appropriate personnel to ensure they are prepared and trained to carry out their Emergency Positions • Ensure the Planning Branch Forecasting staff has a dedicated area to set up in the ICC or nearby location and has all of the necessary equipment, supplies, and support • Deploy to the ICC as directed, report to the Planning Section Chief, and obtain a situational awareness and strategy briefing • Following activation of the IMT, activate the required Planning Branch - Forecasting personnel and provide initial staffing plans to the Planning Section Chief and Resource Tracking Branch • Conduct an initial briefing and routine update meetings and briefings with Planning Branch Forecasting personnel • Instruct the Branch staff to monitor weather forecasts and damage that has occurred to neighboring utilities • Review data from weather-based Damage Prediction Models • Assess potential system impact and the possible number of outage events based upon event predictions and historical system information • Prepare routine updates, reports, and information for the Planning Section Chief as required or requested • Verify that the required ICC, EOC, and AWC IMT Rosters are being developed as part of the IAP • Develop the first Operational Period IAP Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  3. Page 233 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 233 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Collect and compile outage and damage data to predict and report damage impact • Formulate an overall response and recovery strategy in collaboration with others and develop an IAP including providing recommendations of movement, addition, or releases of resources as appropriate • Inform the Planning Section Chief of additional Planning Branch Forecasting resources required • Collaborate with the Liaison Officer to develop and validate reporting to regulators, as required • In collaboration with Operations, use the Outage Management System (OMS) Storm Management module and other data and considerations to determine the Global ETR; ensure entry into (override) the OMS ETRs at the various zones (State, Region, AWC, Town, Circuit) within the IMTs geographical jurisdiction • Collaborate with the Communications Officer to develop global restoration messages for the various zones (Region and AWC) within the IMT’s geographical jurisdiction and ensure update of the RTS Global Restoration Messaging tool • Collaborate with the Planning Branch Director - Tactical on a DA strategy and associated time constraints • Monitor restoration progress against communicated ETRs, identify at risk ETRs, and adjust as necessary • Oversee development of “what if scenarios” to determine optimum staffing levels • Ensure positions within the Branch execute their specific duties and responsibilities effectively • Support the development of a Demobilization Plan, including resource schedule, and release resources as necessary to the Planning Section Chief for demobilization or redeployment • Ensure all models and data are saved for post event analysis • Ensure that all forms and documentation are properly completed and provided to the Planning Section Chief • Participate in After Action Review(s) Personal Protective Equipment (PPE): • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out EP-ALL-EPJD-PLN-02 Rev 0 Page 2 of 3
  4. Page 234 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 234 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-02 Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 3 of 3
  5. Page 235 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 235 of 328 All Hazards Emergency Response Program Effective Date: 4/27/2016 EP-ALL-EPJD-PLN-03 , Rev. 0 Approval Date: 4/27/2016 Planning Branch Director - Transmission EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning Branch Director - Transmission B. Reports To: Planning Section Chief 1. Direct Reports: Transmission Support Specialist C. Position Duties and Responsibilities: The Planning Branch Director - Transmission, in collaboration with the Incident Commander and other Command and General staff personnel, is responsible for developing and recommending the overall transmission system restoration strategy, including estimated restoration times based on resources available, damage assessment data, and current and forecasted weather conditions. Coordinates engineering and technical support needed to support transmission repair activities. D. Pre-Event Preparations: • Assess availability, activate, and deploy branch personnel, as needed • Support the Planning Section Chief in conducting the annual Section Meeting with all appropriate personnel to ensure they are prepared and trained to carry out their Emergency Positions • Review system equipment out-of-service and SCLLs, and recall work, as needed • Participate in the development of the first Operational Period Incident Action Plan (IAP), as needed • Processes information and data for input into Operational Period’s Incident Action Plan. • Determine the damage assessment process for the transmission system • Oversee the collecting, analyzing, and managing of transmission event status information, including damage assessment, resource needs, allocation, and so on, and ensure it is compiled and displayed as necessary • Coordinate with the Planning Branch Director – Forecasting and other IMT leadership positions to develop a mutually agreed upon strategy and sequence of priorities • Ensure the development, updating, and communication times of the required Estimated Restoration Times (ETR) for transmission system repairs • Prepare regular reports and information for the Planning Section Chief as required or requested • Inform the Logistics Section of additional resource requirements (including the need for specialized resources) or when resources will soon become available for redeployment • Ensure that all damage assessment data is being compiled in a timely fashion • Participate in the development of the IAP in collaboration with the Incident Commander and the General and Command staffs • Coordinate engineering and technical support needed to support transmission repair activities • Recognize and report significant changes in incident status to the Planning Section Chief/Incident Commander • Ensure that the positions within the Branch execute their specific duties and responsibilities • Oversee the preparation of the Demobilization Plan to include developing a strategy for releasing external crews in the most cost effective manner and return the organization to normal business operations E. Duties, Responsibilities, and Actions During an Emergency Event: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  6. Page 236 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 236 of 328 F. Post- Emergency Event Responsibilities and Reports: • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Ensure outside contractor time sheets are forwarded to appropriate financial personnel Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-03 Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 2 of 2
  7. Page 237 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 237 of 328 EP-ALL-EPJD-PLN-04 , Rev 0 All Hazards Emergency Response Program Effective Date: 6/13/2016 Approval Date: 6/13/2016 Transmission Support Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Transmission Support Specialist B. Reports To: Planning Branch Director - Transmission 1. Direct Reports: None C. Position Duties and Responsibilities: The Transmission Support Specialist supports the Planning Branch Director – Transmission in the assessment of transmission system damage and the development of an integrated restoration strategy in coordination with the Planning Forecasting Branch. D. Pre-Event Preparations: • Support the Planning Branch Director – Transmission • Maintain Situational awareness • Support the compilation of transmission system damage • Support the development of a prioritized transmission restoration strategy and coordinate with the Planning Forecasting Branch to ensure an integrated plan • Provide an interface with engineering/technical support, as needed • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  8. Page 238 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 238 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-04 Eversource N:\ Drive Rev 0 Page 2 of 2
  9. Page 239 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 239 of 328 EP-ALL-EPJD-PLN-06 , Rev. 1 All Hazards Emergency Response Program Effective Date: 8/16/2022 Approval Date: 1/13/2021 Planning & ETR Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning & ETR Specialist B. Reports To: Planning Branch Director - Forecasting 1. Direct Reports: None C. Position Duties and Responsibilities: The Planning & ETR Specialist is responsible for monitoring weather and road conditions, crew resources, trouble spot to crew ratios, developing and recommending global Estimated Times to Restoration (ETR), messaging, and monitoring ETRs against restoration progress. Advises the Planning Branch Director - Forecasting of strategic considerations/recommendations based on conditions and parameters monitored. D. Pre-Event Preparations: • Monitor weather forecasts in the region and damage to other utilities • Review data from available damage prediction models • Collect and compile data from the OMS, System Operations, and Resource Tracking Branch in order to predict and report damage and customer impact; and recommended movement, addition, or releases of resources as appropriate • Develop and recommend Global ETRs by system, region, AWC, and town; and messaging to Planning Branch Director - Forecasting • Update system OMS and messaging tool with approved ETR messages • Monitor restoration progress against communicated ETRs and report at-risk ETRs • Direct relevant documentation to the Planning Section Chief for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  10. Page 240 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 240 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • eLearning OMS Customer Outage Communications (ETRs) (EP-604) • OMS Initial Training – Modeler (EP-603C) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-06 Eversource N:\ Drive, SharePoint, Teams, OMS Rev 1 Page 2 of 2

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)