Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 239 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 239 of 328 EP-ALL-EPJD-PLN-06 , Rev. 1 All Hazards Emergency Response Program Effective Date: 8/16/2022 Approval Date: 1/13/2021 Planning & ETR Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning & ETR Specialist B. Reports To: Planning Branch Director - Forecasting 1. Direct Reports: None C. Position Duties and Responsibilities: The Planning & ETR Specialist is responsible for monitoring weather and road conditions, crew resources, trouble spot to crew ratios, developing and recommending global Estimated Times to Restoration (ETR), messaging, and monitoring ETRs against restoration progress. Advises the Planning Branch Director - Forecasting of strategic considerations/recommendations based on conditions and parameters monitored. D. Pre-Event Preparations: • Monitor weather forecasts in the region and damage to other utilities • Review data from available damage prediction models • Collect and compile data from the OMS, System Operations, and Resource Tracking Branch in order to predict and report damage and customer impact; and recommended movement, addition, or releases of resources as appropriate • Develop and recommend Global ETRs by system, region, AWC, and town; and messaging to Planning Branch Director - Forecasting • Update system OMS and messaging tool with approved ETR messages • Monitor restoration progress against communicated ETRs and report at-risk ETRs • Direct relevant documentation to the Planning Section Chief for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  2. Page 240 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 240 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • eLearning OMS Customer Outage Communications (ETRs) (EP-604) • OMS Initial Training – Modeler (EP-603C) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-06 Eversource N:\ Drive, SharePoint, Teams, OMS Rev 1 Page 2 of 2
  3. Page 241 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 241 of 328 EP-ALL-EPJD-PLN-08 , Rev. 0 All Hazards Emergency Response Program Effective Date: 4/26/2016 Approval Date: 4/26/2016 Event Statistician Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Event Statistician Specialist B. Reports To: Planning Branch Director - Forecasting 1. Direct Reports: None C. Position Duties and Responsibilities: The Event Statistician Specialist compiles key decision-making data such as resource counts, outage data, damage assessment data, and restoration progress. Provides input and validates other inputs into the IAP in coordination with the Planning Branch Directors. Provides reports to the ECT as requested. D. Pre-Event Preparations: • Discuss availability with Planning Branch Director - Forecasting E. • Compile key data and restoration progress • Provide insights and advice during development of the global ETR(s) based on the DA data collected & compiled • Monitor & record key metrics for Electric or Gas IMTs, as applicable including # of crews and types, trouble spot to crew ratios, % DA complete, customers out and restored, % customers with ETRs, ETR type (global or event ), and so on • Direct relevant documentation to the Planning Section Chief for disposition • Participate in After Action Review(s) F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  4. Page 242 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 242 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-08 Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 2 of 2
  5. Page 243 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 243 of 328 All Hazards Emergency Response Program Effective Date: 4/27/2016 EP-ALL-EPJD-PLN-10 , Rev. 0 Approval Date: 4/27/2016 Planning Branch Director - Tactical EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning Branch Director - Tactical B. Reports To: Planning Section Chief 1. Direct Reports: Planning Unit Leader - Tactical C. Position Duties and Responsibilities: The Planning Branch Director – Tactical is responsible for overseeing the Region’s Rapid and Detailed damage assessment (DA) processes. The Planning Branch Director – Tactical collaborates and verifies with the Operations Branch Director that the resources that have been allotted are distributed appropriately among the Restoration Management Teams and develops high level tactical plans to be implemented. As the restoration event nears completion, is responsible for developing a strategy for releasing external resources, internal resources, and support staff, in the most efficient and cost effective manner. D. Pre-Event Preparations: • Ensure the staffing rosters for the Planning Branch Tactical staff positions are up to date and ready to be used • Support the Planning Section Chief in conducting the annual Section Meeting with all appropriate personnel to ensure they are prepared and trained to carry out their Emergency Positions • Deploy to EOC as directed, report to the Planning Section Chief, and obtain a situational awareness and strategy briefing • Following activation of the IMT, activate Planning Tactical personnel, develop staffing schedule, and provide initial staffing plans to the Resource Tracking Branch • Conduct an initial briefing, and routine update meetings and briefings with personnel • Ensure the Branch staff has all of the necessary equipment, supplies, and support • Collaborate with the Forecasting Branch and assess potential system impact/number of outage events • Collaborate with other Planning Branch Directors on preparedness activities and expectations for timeliness and accuracy of DA • Prepare routine updates, reports, and information for the Planning Section Chief as required or requested • Collaborate with the Planning Branch Director - Forecasting and support the development of the first Operational Period Incident Action Plan (IAP) • Notify the Planning Section Chief of Logistics requirements to support the Damage Assessment efforts • Inform the Planning Section Chief when the Planning Tactical Branch personnel are set up and operational Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  6. Page 244 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 244 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: • Oversee and ensure the effective performance of the damage assessment to support, develop, and disseminate an accurate global ETR within required timeframes • Notify the Planning Section Chief if additional resources are needed to support the damage assessment effort • Ensure positions within the Branch execute their specific duties and responsibilities • Provide any necessary support to developing the IAP, including the Regional Operation Plans • Monitor and redeploy the Branch resources to areas of need as required or directed by the Planning Section Chief. Notify Resource Tracking Branch of any authorized resource movement • When notified that demobilization is being considered, develop overall strategy for final release of the Branch resources in the most efficient and cost effective manner • Release any contract personnel to the Logistics Resource Acquisition Branch for demobilization or redeployment • Ensure all models and data are saved for post event analysis • Ensure that all forms and documentation are properly completed and provided to the Planning Section Chief • Ensure outside contractor time sheets are forwarded to appropriate financial personnel. • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center or one of the activated EOCs as directed by the Planning Section Chief I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • • • • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) eLearning: Introduction to the Incident Command System (EP-304) eLearning: ARCOS and You (EP-103) eLearning: Introduction to Business Continuity (EP-201) Initial Training • eLearning: OMS Customer Outage Communications (ETRs) (EP-604) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-10 Eversource N:\ Drive Rev 0 Page 2 of 2
  7. Page 245 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 245 of 328 EP-ALL-EPJD-PLN-11 , Rev. 0 All Hazards Emergency Response Program Effective Date: 4/27/2016 Approval Date: 4/27/2016 Planning Unit Leader - Tactical EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning Unit Leader - Tactical B. Reports To: Planning Branch Director - Tactical 1. Direct Reports: • Damage Assessment Coordinator • Planning Modeler C. Position Duties and Responsibilities: The Planning Unit Leader - Tactical executes the strategy for the damage assessment (DA). Ensures the OMS is updated with DA details, and the system is modeled to accurately reflect conditions in the field. Feedback from the Planning Unit Leader is used in the development of the Incident Action Plan (IAP) Regional Allocation Plan. D. Pre-Event Preparations: • Discuss availability with Planning Branch Director - Tactical • Assess availability, activate, and deploy unit personnel as directed • Prepare rosters for Planning Unit in the assigned region • When Damage Assessment Unit is activated, ensure Damage Assessment Patrol crews are built in OMS • Ensure availability of DA Mobile technology • Ensure technology users validate credentials and access • Execute the damage assessment process to support timely ETRs, as required to aid operations • Monitor Damage assessment progress and update Planning Branch Director - Tactical • Escalate requests for additional Damage Assessment resources as needed • Ensure Food and Lodging requirements have been communicated • Address any logistical issues with Logistics Support Specialist • Ensure damage information is entered in the OMS and is modeled to reflect field conditions • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the EOC or AWC Equipment and Supplies: • Phone Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: EOC or AWC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  8. Page 246 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 246 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Gas ☐ Initial Training • eLearning: OMS Customer Outage Communications (ETRs) (EP-604) • OMA for Damage Assessment Patrollers (EP-OMA-01) • OMA Lifecycle of an Outage Event (EP-OMA-02) • Initial Damage Assessment Patroller Instructor-Led Training (EP-803) • Initial OMA Training (EP-605) • Initial OMS for Damage Assessment Coordinators (EP-603B) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-11 Eversource N:\ Drive, Teams, SharePoint Rev 0 Page 2 of 2
  9. Page 247 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 247 of 328 All Hazards Emergency Response Program Effective Date: 10/31/2022 EP-ALL-EPJD-PLN-13 , Rev. 1 Approval Date: 8/19/2022 Damage Assessment Coordinator EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Damage Assessment Coordinator B. Reports To: Planning Unit Leader -Tactical 1. Direct Reports: Damage Assessment Patroller C. Position Duties and Responsibilities: The Damage Assessment (DA) Coordinator is responsible to execute the damage assessment process within the assigned Region or AWC. Additionally, they assign and communicate regularly with the Damage Assessment Patrollers in the field, ensure the OMS is updated with damage assessment details, and provide status updates to the Planning Unit Leader - Tactical. D. Pre-Event Preparations: • Discuss availability with Planning Unit Leader - Tactical • Build DA Patrol crews in OMS • Reach out to DA Patrollers to ensure all pre-event equipment checks, including technology updates, are completed • Execute the tactics consistent with the damage assessment strategy provided by the Branch Directors • Prioritize DA and assign DA Patrollers in the OMS • Ensure damage information is entered in the OMS DA form • Provide logistical details to DA Patrollers concerning feeding and lodging • Escalate any issues to the Planning Unit Leader • Provide updates on DA status to Planning Unit Leader Tactical • Coordinate with the Wire Guard Coordinator to deploy needed Wire Guard resources identified as a result of damage assessment patrolling • Direct relevant documentation to the Planning Branch Director for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the AWC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Area Work Center I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  10. Page 248 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 248 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • eLearning: OMS Customer Outage Communication (ETRs) Refresher (EP-604) • Initial OMS Training – Damage Assessment Coordinators (EP-603B) • eLearning: OMA for Damage Assessment Patrollers (EP-OMA-01) • eLearning: OMA Lifecycle of an Outage Event(EP-OMA-02) • Initial OMA Training (EP-605) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PLN-13 EP OMA - Refresher (EP-605R) Eversource N:\ Drive, SharePoint, Teams, OMS, OMA Rev 1 Page 2 of 2

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)