Interrogatory responses
Answers to questions 30, 33, 36, 37, 40
Files13
EOE-030_final.pdf
PDF · 85 KB · 1 pageText searchable
Download EOE-030_final.pdfRead the text of EOE-030_final.pdf
EOE-030 Attachment 1.pdf
PDF · 816 KB · 1 pageText searchable
Download EOE-030 Attachment 1.pdfRead the text of EOE-030 Attachment 1.pdf
EOE-030 Attachment 1.xlsx
Excel · 33 KBText searchable
Download EOE-030 Attachment 1.xlsxRead the text of EOE-030 Attachment 1.xlsx
EOE-033_final.pdf
PDF · 109 KB · 2 pagesText searchable
Download EOE-033_final.pdfRead the text of EOE-033_final.pdf
EOE-036 Attachment 1.pdf
PDF · 825 KB · 5 pagesText searchable
Download EOE-036 Attachment 1.pdfRead the text of EOE-036 Attachment 1.pdf
EOE-036_final.pdf
PDF · 83 KB · 1 pageText searchable
Download EOE-036_final.pdfRead the text of EOE-036_final.pdf
EOE-037_final.pdf
PDF · 97 KB · 1 pageText searchable
Download EOE-037_final.pdfRead the text of EOE-037_final.pdf
EOE-037 Attachment 1.pdf
PDF · 89 KB · 1 pageText searchable
Download EOE-037 Attachment 1.pdfRead the text of EOE-037 Attachment 1.pdf
EOE-037 Attachment 1.xlsx
Excel · 23 KBText searchable
Download EOE-037 Attachment 1.xlsxRead the text of EOE-037 Attachment 1.xlsx
EOE-040_final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-040_final.pdfRead the text of EOE-040_final.pdf
EOE-040 Attachment 1.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-040 Attachment 1.pdfRead the text of EOE-040 Attachment 1.pdf
EOE-040 Attachment 2.pdf
PDF · 2.4 MB · 108 pagesText searchable
Download EOE-040 Attachment 2.pdfRead the text of EOE-040 Attachment 2.pdf
EOE-040 Attachment 3.pdf
PDF · 12 MB · 328 pagesText searchable
Download EOE-040 Attachment 3.pdfRead the text of EOE-040 Attachment 3.pdf
Text of EOE-033_final.pdf
Extracted from the file · 2 pages · 2,411 characters
Text of EOE-036 Attachment 1.pdf
Extracted from the file · 5 pages · 10,251 characters
Text of EOE-036_final.pdf
Extracted from the file · 1 page · 605 characters
Text of EOE-037_final.pdf
Extracted from the file · 1 page · 1,678 characters
Text of EOE-037 Attachment 1.pdf
Extracted from the file · 1 page · 1,360 characters
Text of EOE-037 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of EOE-040_final.pdf
Extracted from the file · 1 page · 1,218 characters
Text of EOE-040 Attachment 1.pdf
Extracted from the file · 108 pages · 301,257 characters
Text of EOE-040 Attachment 2.pdf
Extracted from the file · 108 pages · 299,821 characters
Page 261 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 261 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Execute the tactics consistent with the DA strategy provided by the Drone and Planning Branch Directors • Prioritize DA and assign Drone teams • Assist in uploading of photos to SharePoint and renaming of photos using Drone Engineering Tools • Create maps of photos using provided tools • Review photos and create/issue reports of damage found • Provided logistical details to RPIC and VO concerning feeding and lodging • Escalate any major outage-related issues to the Drone Unit Leader • Assist in creating and reviewing Special Governmental Interest (SGI) waivers • Aid in Air Traffic Communication • Provide updates on DA status to Planning Unit Leader – Tactical • Coordinate with the Wire Guard (WG) Coordinator, if needed, to deploy WG resources identified as a result of DA patrolling • Direct relevant documentation to the Planning Section for disposition • Update the Drone Patrol Log for future events • Participate in After Action Review(s) or debrief Equipment and Supplies: • Phone • Computer Personal: • 1. Safety Requirements: Appropriate clothing for weather conditions and any personal needs for multiple days away from home Personal Protective Equipment (PPE): • N/A – If in the ICC/EOC/AWC • Reflective vest, safety shoes, hard hat - if in the field or working from a Mobile Command Center (MCC) H. Position Work Location: Remote or Field area closest to damage locations I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out, Phone, Text, or Email SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan EP-ALL-EPJD-PLN-25 Gas Rev 0 ☒ Page 2 of 3Page 262 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 262 of 328 3. Training Requirements: Initial Training • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Initial Eversource VO Training (EP-XXX) • Part 107 FAA License on hand • GoCanvas Training Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-PLN-25 • Eversource Flight School completion • Yearly mock inspection training conducted by Drone Engineering Eversource N:\ Drive, SharePoint, Teams, Epoch Field, OMS, GoCanvas, Google Earth, Arc GIS Rev 0 Page 3 of 3Page 263 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 263 of 328 All Hazards Emergency Response Program Effective Date: EP-ALL-EPJD-PLN-26, Rev. 0 Approval Date: Drone Remote Pilot-in-Command/Visual Observer EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Planning: Drone Remote Pilot-in-Command (RPIC)/Visual Observer (VO) B. Reports To: Drone Damage Assessment (DA) Coordinator 1. Direct Reports: N/A C. Position Duties and Responsibilities: The Drone RPIC and VO work in a team of two to assist the Damage Assessment Patroller responsible for conducting DA patrols during emergency events. The RPIC is an approved contractor or trained Eversource Drone Pilot. The VO is responsible for checking for nearby aircraft and assisting the RPIC with specific tasks, as needed. 1. Physical Requirements: 2. Skills/Abilities: D. Pre-Event Preparations: Driving Reaching above shoulder Lifting, pushing/pulling, carrying Bending Balancing Performing manual dexterity Ability to lift up to 20 lbs. Standing for long periods Exposed to extremes in temperature/humidity Excellent communication skills Excellent computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours ❑ Maintain ESOP-100 APL (Authorized Persons List) Qualification Proficiency with e Operations Mobile Application (OMA) application Walking Stair climbing Prolonged hours sitting ❑ Working at heights Operating heavy equipment Kneeling Traveling ❑ Working with hazardous equipment Ability to visibly see and hear nearby aircraft Excellent interpersonal /phone skills Excellent time management skills Ability to prioritize & delegate as needed ❑ Proficiency with ARCOS application ❑ Proficiency with Outage Management System (OMS) software Ability to pass Eversource Skills Training specific to ERP • Assess availability, activate, and deploy unit personnel as needed • Ensure all required PPE is in order • Fully charge all portable devices • Ensure knowledge and understanding of the OMS including the damage assessment and referral processes • Complete equipment readiness evaluation • Participate in Just in Time job-specific training during pre-event activities and/or throughout the life of the event Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.Page 264 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 264 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Perform rapid patrols of a circuit or specific location that is inaccessible by conventional means • Perform DA and document as required using the technology tool or manual process, as instructed • Assist in the review of Special Governmental Interest (SGI) waivers • Guard downed electrical wires until relieved by a Wire Guard or line crew or until the hazard has been eliminated • Communicate critical outage-related damage effectively, as required in Drone Standard Operating Procedures (SOP) • Communicate location details to the Drone DA Coordinator using the prescribed method • Upload photos to the designated location in a timely manner for review by the Drone DA Coordinator • Monitor air traffic in the area to avoid manned aircraft • Direct relevant documentation to the Planning Section for disposition • Update the Drone Patrol Log for future events • Participate in After Action Review(s) Equipment and Supplies: • Phone • Computer/tablet • Done and all drone-related equipment • Two-way radio • Common Traffic Advisory Frequency (CTAF) radio • Fire extinguisher • Equipment required by FAA waivers, if applicable • First aid kit • Roadside Signage/cones • Drone license • Digital or hard copy of FAA waiver, if applicable Personal: • 1. Safety Requirements: Appropriate clothing for weather conditions and any personal needs for multiple days away from home Personal Protective Equipment (PPE): • N/A – If in the ICC/EOC/AWC • Reflective vest, safety shoes, hard hat H. Position Work Location: Field, Area Work Center (AWC) I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out, Phone, Text, or Email SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan EP-ALL-EPJD-PLN-26 Gas Rev 0 ☒ Page 2 of 3Page 265 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 265 of 328 3. Training Requirements: Initial Training • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Part 107 FAA License on hand • Eversource Visual Observer Training • GoCanvas Training Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-PLN-26 • Eversource Flight School completion • Yearly mock inspection training conducted by Drone Engineering Eversource N:\ Drive, SharePoint, Teams, Epoch Field, OMS, GoCanvas, Google Earth, ArcGIS Rev 0 Page 3 of 3Page 266 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 266 of 328 EP-ALL-EPJD-PS-01, Rev. 0 All Hazards Emergency Response Program Effective Date: 8/12/2022 Approval Date: 4/14/2021 Public Safety Section Chief EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Public Safety Section Chief B. Reports To: Incident Commander 1. Direct Reports: Public Safety Unit Leader C. Position Duties and Responsibilities: The Public Safety (PS) Section Chief has the overall responsibility to assemble, prepare, and deploy resources to address hazards impacting communities caused by electrical equipment. The Section Chief works closely with other members of the Command and General staffs, particularly the Liaison Officer, Planning Section Chief, and Operations Section Chief to ensure that public safety events are being mitigated in a safe and efficient manner. During widespread damage, there can be a high volume of public safety events across the Eversource service territory. The PS Section Chief ensures that the Public Safety team is addressing the highest priorities in the following order: 1. Life Threatening/Imminent Danger (Fire Police Standby first priority – FPS1) calls 2. Hindering Emergency Operations (FPS2) calls 3. Non-Life Threatening Electrical Hazard (FPS3) calls 4. The restoration of critical facilities in coordination and collaboration with the Operations Section D. Pre-Event Preparations: • Ensure the staffing rosters for all Public Safety Section positions are up to date and ready to be used • Ensure annual meetings are held by the Branch Directors, Group Managers, or Unit Leaders for employees whose primary emergency assignment differs from their Blue Sky position. The meeting will: • Review the processes related to employees’ primary emergency assignment • Review employees’ completion of related training • Review tasks and tools associated with employees’ primary emergency assignment • Confirm that employees have been issued Personal Protective Equipment (PPE) required to complete their primary emergency assignment • Review the obligation of all employees to report to work when activated and that employees are aware of notification methods • Understand the provisions of the company union agreements as they are interpreted under emergency operations • Deploy to the Incident Command Center (ICC) as directed, report to the Incident Commander (IC), and obtain a situational awareness and strategy briefing • Following activation of the Incident Management Team (IMT), activate the required Public Safety Section personnel as requested, develop staffing schedules, provide initial staffing plans to the IC, and ensure with the Planning Chief that the Resource Tracking Tool is updated and accurate • Conduct an initial briefing and routine update meetings and briefings with Section personnel • Ensure Public Safety Section personnel have a dedicated area to set up in the ICC or Emergency Operations Center (EOC) and all of the necessary equipment, supplies, and support Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.Page 267 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 267 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Ensure the Outage Management System (OMS) is used to assign and status all public safety events the team is working on • Work with the Logistics and Planning Sections to determine geographical locations within the territory for pre-deployment of personnel based on the threat • Ensure Satellite phones, when required, have been activated, tested, and assigned to key personnel • Ensure the Section executes the work plan to achieve the Incident Action Plan (IAP) Operational Period goals • Request additional resources to support the Public Safety tactical operations as required • Ensure safety procedures and protocols are being adhered to and exercise authority to stop or prevent any unsafe acts • Obtain a preliminary assessment of the number of public safety FPS locations impacted, by community, and coordinate with Planning and Liaison Sections to allocate resources to the highest impacted communities • Ensure that all hazard mitigation activities are being recorded appropriately in OMS, including updating and closing out FPS events and properly documenting mitigation actions in outage events. • Ensure the field personnel coordinate with the applicable EOC or RMT for required switching and tagging • Provide continual assessment of restoration progress and allocate resources where necessary • Prepare status updates and provide to the IC as required or requested • Ensure that the positions within the Section execute their specific duties and responsibilities effectively • Support the development of a Demobilization Plan to return to normal business operations • Develop resource release schedule and release crews as necessary to the Operations Section for demobilization or redeployment • Direct relevant documentation to the Planning Section for disposition • Ensure outside contractor time sheets are forwarded to appropriate financial personnel • Participate in After Action Review(s) Personal Protective Equipment (PPE): • N/A - If in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out EP-ALL-EPJD-PS-01 Rev 0 Page 2 of 3Page 268 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 268 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-PS-01 Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 3 of 3Page 269 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 269 of 328 EP-ALL-EPJD-PS-02, Rev. 0 All Hazards Emergency Response Program Effective Date: 8/12/2022 Approval Date: 4/14/2021 Public Safety Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Public Safety Unit Leader B. Reports To: Public Safety Section Chief 1. Direct Reports: C. Position Duties and Responsibilities: • Public Safety Specialist Coordinator • Response Specialist Organization (RSO) Public Safety Supervisor The Public Safety Section utilizes the Electric System Operations Response Organization, as well as substation and underground employees, to be deployed to communities that have experienced significant damage during an emergency event to assist in addressing the highest priorities in the following order: 1. Life Threatening/Imminent Danger (Fire Police Standby first priority – FPS1) calls 2. Hindering Emergency Operations (FPS2) calls 3. Non-Life Threatening Electrical Hazard (FPS3) calls 4. The restoration of critical facilities in coordination and collaboration with the Operations Section These employees are sent to communities with qualified line and forestry crews to perform the necessary tasks to open roads and perform some restoration activities. The Unit Leader (UL) is responsible for coordinating the deployment of Public Safety resources to communities and monitoring progress. The Public Safety UL works closely with the Liaison Unit Leader to ensure that the resources are addressing the highest priority public safety events and that work is being assigned and updated accurately in the Outage Management System (OMS). Other duties include: • Ensure safety of tactical operations • Exercise emergency authority to stop and prevent unsafe acts • Execute and supervise the operations portion of the Incident Action Plan (IAP) • Participate in scheduled ERP training sessions • Be knowledgeable about the Eversource ERP with a focus on the Public Safety Section and interdependencies with other ERP Sections. • Ensure that all hazard mitigation activities are being recorded appropriately in OMS, including updating and closing out FPS events and properly documenting mitigation actions in outage events. • Maintain a staffing roster of qualified and capable employees to perform the duties of Public Safety Coordinator, Public Safety Supervisor, and response resources. Ensure employees have attended training, have necessary equipment, and are in a state of readiness • Understand the provisions of company union agreements as they are interpreted under emergency operations • Ensure that the positions within the Public Safety Section execute their specific duties and responsibilities • Understand the process for on-boarding and managing external (Mutual Aid/Contractor Line) restoration personnel Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.Page 270 of 328
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 270 of 328 D. Pre-Event Preparations: E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Notify and activate personnel of an impending threat to the system • Work with the Public Safety Coordinators and Supervisors to prepare and record in the Resource Tracking Tool a staffing plan and schedules as dictated for the duration of the event in the response matrix (approved by the Public Safety Section Chief) • Work with the Operations and Planning Sections and the Liaison Unit Leader to develop areas of pre-deployment of personnel to geographic locations within the territory based on the threat to the area • Ensure safety procedures and protocols are being adhered to • Exercise authority to stop or prevent any unsafe acts • Deploy Public Safety Teams, monitor restoration status, and direct the response in accordance with the IAP • Monitor reports to ensure that assigned resources are engaged and productive • Coordinate with the Public Safety Section Chief for direction on deployment of resources to the hardest impacted communities • Ensure the OMS is used to assign and status all public safety events the team is working on, including restoration remarks when the hazard has been mitigated and how mitigation was accomplished • Escalate field response issues to the Public Safety Section Chief and/or Liaison Unit Leader as necessary • Coordinate with System Operations or Local EOCs on required switching, tagging, and clearances • Coordinate with the Operations and Planning Section Chiefs and the Liaison Officer for direction on deployment of Public Safety Specialists to hard hit communities • Provide continual assessment of restoration progress and allocate resources where necessary • Prepare for and present status updates on the operations • As directed, release crews as necessary to the Resource Coordinator for demobilization or redeployment • Conduct Demobilization process to return to normal business operations • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) Personal Protective Equipment (PPE): • N/A - If in the AWC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: EOC I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out EP-ALL-EPJD-PS-02 Rev 0 Page 2 of 3
As listed on the current system
Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026