Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 299 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 299 of 328 Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ICC/EOC/AWC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Emergency Operations Center (EOC), Area Work Center (AWC), Incident Command Center (ICC), or Virtual, as assigned I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Resource Management Process and Tool Training (EP-804) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-RM-07 Resource Management Tool Refresher (EP-804R) Eversource N:\ Drive, SharePoint, Teams, ARCOS Rev 0 Page 2 of 2
  2. Page 300 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 300 of 328 EP-ALL-EPJD-RM-08, Rev. 0 All Hazards Emergency Response Program Effective Date: 9/6/2022 Approval Date: 9/6/2022 External Resource Field Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: External Resource Field Unit Leader B. Reports To: Resource Acquisition Group Manager 1. Direct Reports: External Resource Field Coordinator C. Position Duties and Responsibilities: External Resource Field Unit Leaders oversee External Resource Field Coordinators who are assigned to contract crews. They determine Coordinator schedules and assign them to contractors, and act as a key point of contact to address any logistical, operational, or safety issues that might arise. D. Pre-Event Preparations: • Assess availability, activate, and deploy unit personnel as directed, including Crew Guides • Assign External Resource Field Coordinators with contract crews in anticipation of arrival • Provide a schedule for all personnel for location, shifts, and contractor coverage • Ensure Food and Lodging requirements have been communicated • Coordinate External Resource Field Coordinators assignments and contract crews • Ensure External Resource Field Coordinators are tracking contractor work and rest hours and coordinating safety briefings • Respond to questions and issues raised by External Resource Field Coordinators • Ensure all contractor time sheets and evaluation forms have been turned in to the Resource Acquisition Group Manager • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Reconcile ARCOS based on demobilization in Manual E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Personal Protective Equipment (PPE): G. Equipment Required: • Ensure all contractor time sheets and evaluation forms have been turned in to the Logistics Resource Acquisition Branch Director Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Regional EOC or AWC I. Work Period: 8-16 hour work period per day J. Activation Notification: Email, Teams, Phone Call, or Call Out Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  3. Page 301 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 301 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • External Resource Field Coordinator Training (EP-506) • eLearning: Overhead Line Equipment Recognition (MEA ELEC-02301I/R-01) Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-RM-08 • eLearning: External Resource Field Coordinator Refresher (EP-506R) • Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 2 of 2
  4. Page 302 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 302 of 328 All Hazards Emergency Response Program Effective Date: 9/26/2024 EP-ALL-EPJD-RM-09 BU, Rev. 0 Approval Date: 9/26/2024 External Resource Field Coordinator - BU EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Resource: External Resource Field Coordinator BU (Bargaining Unit personnel only) B. Reports To: External Resource Field Unit Leader 1. Direct Reports: N/A External Resource Field Coordinators-BU (ERFC-BU) are bargaining unit personnel that coordinate the activities of crews assigned to them. They communicate the restoration strategy to the crews, and provide them with logistical details concerning food and lodging. Additionally, they provide two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the RMT and field crews. As an ESOP-100 APL (Authorized Persons List) Qualified person, hold clearances for contractors. C. Position Duties and Responsibilities: 1. Physical Requirements: 2. Skills/Abilities: D. Pre-Event Preparations: E. Duties, Responsibilities, and Actions During an Emergency Event: Driving ❑ Reaching above shoulder ❑ Lifting, pushing/pulling, carrying ❑ Bending ❑ Balancing Performing manual dexterity ❑ Ability to lift up to 20 lbs. Standing for long periods Exposed to extremes in temperature/humidity Strong communication skills Strong computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours Maintain ESOP-100 APL (Authorized Persons List) Qualification Walking ❑ Stair climbing ❑ Prolonged hours sitting ❑ Working at heights ❑ Operating heavy equipment ❑ Kneeling Traveling ❑ Working with hazardous equipment Strong interpersonal /phone skills Strong time management skills Ability to prioritize & delegate as needed • Ensure all required Personal Protective Equipment (PPE) is in order • Maintain ESOP-100 APL Qualified person classification in order to hold switching clearances for restoration contractors • Fully charge all portable devices • Coordinate/ conduct required check-in activities for external crews • Ensure the check-in process has been completed for all contract line crews under their supervision prior to beginning work • Coordinate the switching and hold the tagging clearance for all contract line crews under their supervision • Assist Crew Guides with holding switching and tagging clearances as needed • Facilitate delivery of or deliver daily safety briefings to all contract line crews under their supervision • Act as an interface to coordinate food and lodging activities • Effectively communicate with RMTs and Logistics • Ensure work assignments are provided to contractor crews • Ensure the proper number of resources are assigned to any given event so as to maximize productivity Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.
  5. Page 303 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 303 of 328 F. Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Ensure contractors are providing timely updates to the RMT ( Operations Coordinator, System Operator, or Operations Coordination Support) regarding work status (enroute, onsite, and so on), Estimated Time to Restoration (ETR), and scope of work regarding assigned outage/non outage events • Travel to assigned restoration event in advance of contract line crew(s) and assess resources necessary to complete the work (tree crews, materials, poles/transformers, and so on) • Allow only a reasonable amount of material to be procured by crews and ensure any unused material is returned before crews are released from the system • Ensure that contractors are completing and submitting the Mobilization/Demobilization time sheets when both mobilization and demobilization processes are complete; sign Mob/Demob time sheets to indicate the processes are complete • Track contractor work and rest hours and ensure contractors properly complete time sheets, material lists, and equipment lists at the start and end of each shift; validate and authorize work timesheets and ensure they are submitted per existing practice • Act as field liaison between contractors and RMT Operations, should questions or issues arise • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Return materials to designated locations • Turn in signed contractor time sheets and completed contractor evaluation forms to the Logistics Resource Acquisition Branch Director Equipment and Supplies: • Phone • Computer • MiFi Personal: • 1. Safety Requirements: Appropriate clothing for weather conditions and any personal needs for multiple days away from home Personal Protective Equipment (PPE): • N/A – If in the ICC/EOC/AWC • Reflective vest, safety shoes, hard hat H. Position Work Location: Field I. Work Period: 8-16 hour work period per day J. Activation Notification: Email, Teams, Phone Call, or Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan SUPPLEMENTAL JOB DESCRIPTION INFORMATION EP-ALL-EPJD-RM-09 BU Gas Rev 0 ☐ Page 2 of 3
  6. Page 304 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 304 of 328 3. Training Requirements: Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • External Resource Field Coordinator Training (EP-506) • eLearning: Overhead Line Equipment Recognition (MEA ELEC-02301-I/R-01) • ESOP-100 • ESOP-99 Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-RM-09 BU • eLearning: External Resource Field Coordinator Refresher (EP-506R) • ESOP-100, every three years Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 3 of 3
  7. Page 305 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 305 of 328 All Hazards Emergency Response Program Effective Date: 5/14/2024 EP-ALL-EPJD-RM-09, Rev. 1 Approval Date: 5/7/2024 External Resource Field Coordinator EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Resource: External Resource Field Coordinator (ERFC) B. Reports To: External Resource Field Unit Leader 1. Direct Reports: N/A C. Position Duties and Responsibilities: 1. Physical Requirements: 2. Skills/Abilities: D. Pre-Event Preparations: E. Duties, Responsibilities, and Actions During an Emergency Event: External Resource Field Coordinators coordinate the activities of crews assigned to them. They communicate the restoration strategy to the crews, and provide them with logistical details concerning food and lodging. Additionally, they provide two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the RMT and field crews. As an ESOP-100 APL (Authorized Persons List) Qualified person, hold clearances for contractors. Driving ❑ Reaching above shoulder ❑ Lifting, pushing/pulling, carrying ❑ Bending ❑ Balancing Performing manual dexterity ❑ Ability to lift up to 20 lbs. Standing for long periods Exposed to extremes in temperature/humidity Strong communication skills Strong computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours Maintain ESOP-100 APL (Authorized Persons List) Qualification Walking ❑ Stair climbing ❑ Prolonged hours sitting ❑ Working at heights ❑ Operating heavy equipment ❑ Kneeling Traveling ❑ Working with hazardous equipment Strong interpersonal /phone skills Strong time management skills Ability to prioritize & delegate as needed • Ensure all required Personal Protective Equipment (PPE) is in order • Maintain ESOP-100 APL Qualified person classification in order to hold switching clearances for restoration contractors • Fully charge all portable devices • Coordinate/ conduct required check-in activities for external crews • Ensure the check-in process has been completed for all contract line crews under their supervision prior to beginning work • Coordinate the switching and hold the tagging clearance for all contract line crews under their supervision • Assist Crew Guides with holding switching and tagging clearances as needed • Facilitate delivery of or deliver daily safety briefings to all contract line crews under their supervision • Act as an interface to coordinate food and lodging activities • Effectively communicate with RMTs and Logistics • Ensure work assignments are provided to contractor crews • Ensure the proper number of resources are assigned to any given event so as to maximize Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.
  8. Page 306 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 306 of 328 productivity Ensure contractors are providing timely updates to the RMT (Operations Coordinator, System Operator, or Operations Coordination Support Specialist) regarding work status (enroute, onsite, and so on), Estimated Time to Restoration (ETR), and scope of work regarding assigned outage/non outage events • Travel to assigned restoration event in advance of contract line crew(s) and assess resources necessary to complete the work (tree crews, materials, poles/transformers, and so on) • Allow only a reasonable amount of material to be procured by crews and ensure any unused material is returned before crews are released from the system Ensure that contractors are completing and submitting the Mobilization/Demobilization time sheets when both mobilization and demobilization processes are complete; sign Mob/Demob time sheets to indicate the processes are complete Track contractor work and rest hours and ensure contractors properly complete time sheets, material lists, and equipment lists at the start and end of each shift; validate and authorize work timesheets and ensure they are submitted per existing practice F. Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Act as field liaison between contractors and RMT Operations, should questions or issues arise • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) • Return materials to designated locations • Turn in signed contractor time sheets and completed contractor evaluation forms to the Logistics Resource Acquisition Branch Director Personal Protective Equipment (PPE): • Reflective vest, safety shoes, hard hat Equipment and Supplies: • Phone • Computer • MiFi Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Field I. Work Period: 8-16 hour work period per day J. Activation Notification: Email, Teams, Phone Call, or Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 3. Applicability: Electric ☒ 4. Primary Documentation: State or Business Unit Emergency Response Plan EP-ALL-EPJD-RM-09 Gas Rev 1 ☐ Page 2 of 3
  9. Page 307 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 307 of 328 5. Training Requirements: Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • External Resource Field Coordinator Training (EP-506) • eLearning: Overhead Line Equipment Recognition (MEA ELEC-02301-I/R-01) • ESOP-100 • ESOP-99 Refresher Training 6. Required System / Drives Access: EP-ALL-EPJD-RM-09 • eLearning: External Resource Field Coordinator Refresher (EP-506R) • ESOP-100, every three years • Eversource N:\ Drive, SharePoint, Teams Rev 1 Page 3 of 3
  10. Page 308 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 308 of 328 All Hazards Emergency Response Program Effective Date: 9/6/2022 EP-ALL-EPJD-RM-10, Rev. 0 Approval Date: 9/6/2022 Resource Acquisition Unit Leader EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Resource Acquisition Unit Leader (Acquisition, Tracking, ARCOS, Check-in, Crew Management) B. Reports To: Resource Acquisition Group Manager 1. Direct Reports: Resource Acquisition Specialist (Acquisition, ARCOS, Tracking, Check-in, Callers) C. Position Duties and Responsibilities: The Resource Acquisition Unit Leader (Acquisition, Tracking, ARCOS, Check-in, Crew Management) is responsible for organizing and responding to external and internal resource requests from all areas of the Emergency Response Organization. Resource requests can include but are not limited to line crews, digger crews, tree crews, DA patrollers, service crews, and wire guards. The Resource Acquisition Unit Leader is responsible for the timely scrubbing and uploading of all external rosters. Also responsible for ARCOS Dashboard accuracy, initial movement of resources to first location and, if necessary, movement to other business units. Interfaces with the Eversource Resource Support Group (ERSG) for contract support and mutual aid support from outside their local area. Maintains communications with crews as they approach Eversource territory, verifies and checks in resources, and verifies that rosters are accurate and safety briefings are completed. Uploads rosters into the resource tracking system and tracks crews until they are assigned their first work location. Maintains contact with External Resource Field Coordinators (ERFC)/Crew Guides to ensure resources are working as assigned and timesheets are completed as required. Ensures the demobilization or redeployment of resources is performed efficiently and effectively. Works in coordination with the Resource Management Branch, to maintain an accurate tabulation of acquired external and internal resources. Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)