Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 319 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 319 of 328 EP-ALL-EPJD-RM-14 BU, Rev. 0 All Hazards Emergency Response Program Effective Date: 9/26/2024 Approval Date: 9/26/2024 Crew Guide - BU EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Crew Guide BU (Bargaining Unit personnel only) B. Reports To: External Resource Field Coordinator 1. Direct Reports: None C. Position Duties and Responsibilities: The Crew Guide - BU is a bargaining unit employee that coordinates the activities of the crews assigned to them. They communicate the restoration strategy to the crews and provide them with logistical details concerning food and lodging. They provide two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the Restoration Management Team (RMT) and field crews. Additionally, they contact the External Resource Field Unit Leader to locate ESOP-1000 APL (Authorized Persons List) qualified personnel for switching and tagging for assigned contractors. D. Pre-Event Preparations: • Ensure all required Personal Protective Equipment is in order • Fully charge all portable devices • Coordinate/conduct required check-in activities for external crews 1. Physical Requirements: 2. Skills/Abilities: Driving ❑ Reaching above shoulder ❑ Lifting, pushing/pulling, carrying ❑ Bending ❑ Balancing Performing manual dexterity ❑ Ability to lift up to 20 lbs. Standing for long periods Exposed to extremes in temperature/humidity Strong communication skills Strong computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours ❑ Maintain ESOP-100 APL (Authorized Persons List) Qualification Walking ❑ Stair climbing ❑ Prolonged hours sitting ❑ Working at heights ❑ Operating heavy equipment ❑ Kneeling Traveling ❑ Working with hazardous equipment Strong interpersonal /phone skills Strong time management skills Ability to prioritize & delegate as needed Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness Documentation Database.
  2. Page 320 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 320 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Lead crews to work assignments and food/lodging accommodations • Contact designated ESOP-100 APL qualified personnel to coordinate switching and hold tagging clearances for contractors • Facilitate delivery of or deliver daily safety briefings to all contract line crews under their supervision • Act as field liaison between contractors and RMT Operations, should questions or issues arise • Ensure work assignments are provided to contractor crews • Ensure contractors are providing timely updates to be communicated to the RMT (Operations Coordinator, System Operator, or Operations Coordination Support) regarding work status (enroute, onsite, and so on), Estimated Times to Restoration (ETR), and scope of work regarding assigned outage/non outage events • Perform a general assessment of the next job assignments and work with the crew lead and RMT to arrange all necessary material, traffic control, and so on, are arranged prior to crew arrival • Ensure that each crew has been provided a contractor material kit and work with material logistics to secure any additional required material • Ensure that contractors are completing and submitting the Mobilization/Demobilization time sheets when both mobilization and demobilization processes are complete; sign Mob/Demob time sheets to indicate the processes are complete • Track contractor work and rest hours and ensure contractors properly complete time sheets, material lists, and equipment lists at the start and end of each shift; validate and authorize work timesheets and ensure they are submitted per existing practice • Obtain primary maps if available from the appropriate Area Work Center (AWC) • Direct relevant documentation to the Planning Section for disposition • Ensure contractors return materials to designated locations • Turn in signed contractor time sheets and completed contractor evaluation forms to the Resource Acquisition Group Manager • Participate in After Action Review(s) Equipment and Supplies: • Phone • Computer Personal: • 3. Safety Requirements: Appropriate clothing for weather conditions and any personal needs for multiple days away from home Personal Protective Equipment (PPE): • N/A – If in the ICC/EOC/AWC • Reflective vest, safety shoes, hard hat H. Position Work Location: Field I. Work Period: 8-16 hour work period per day J. Activation Notification: Email, Phone Call, or Call Out EP-ALL-EPJD-RM-14 BU Rev 0 Page 2 of 3
  3. Page 321 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 321 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • External Resource Field Coordinator Training (EP-506) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-RM-14 BU eLearning: External Resource Field Coordinator Refresher (EP-506R) Eversource N:\ Drive, SharePoint, Teams Rev 0 Page 3 of 3
  4. Page 322 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 322 of 328 EP-ALL-EPJD-RM-14, Rev. 1 All Hazards Emergency Response Program Effective Date: 5/14/2024 Approval Date: 5/7/2024 Crew Guide EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Resource: Crew Guide B. Reports To: External Resource Field Coordinator 1. Direct Reports: None C. Position Duties and Responsibilities: The Crew Guide coordinates the activities of the crews assigned to them. They communicate the restoration strategy to the crews and provide them with logistical details concerning food and lodging. They provide two-way communications regarding damage, restoration times, and materials needed between the Operations Coordinator in the Restoration Management Team (RMT) and field crews. Additionally, they contact the External Resource Field Unit Leader to locate ESOP-1000 APL (Authorized Persons List) qualified personnel for switching and tagging for assigned contractors. D. Pre-Event Preparations: • Ensure all required Personal Protective Equipment is in order • Fully charge all portable devices • 1. Physical Requirements: 2. Skills/Abilities: Coordinate/conduct required check-in activities for external crews Driving Reaching above shoulder Lifting, pushing/pulling, carrying Bending Balancing Performing manual dexterity Ability to lift up to 20 lbs. Standing for long periods Exposed to extremes in temperature/humidity Strong communication skills Strong computer skills – Excel Strong analytical & problem-solving skills Ability to work outdoors for 12 hours Maintain ESOP-100 APL (Authorized Persons List) Qualification Walking Stair climbing Prolonged hours sitting Working at heights Operating heavy equipment Kneeling Traveling Working with hazardous equipment Strong interpersonal /phone skills Strong time management skills Ability to prioritize & delegate as needed
  5. Page 323 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 323 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Lead crews to work assignments and food/lodging accommodations • Contact designated ESOP-100 APL qualified personnel to coordinate switching and hold tagging clearances for contractors • Facilitate delivery of or deliver daily safety briefings to all contract line crews under their supervision • Act as field liaison between contractors and RMT Operations, should questions or issues arise • Ensure work assignments are provided to contractor crews • Ensure contractors are providing timely updates to be communicated to the RMT (Operations Coordinator, System Operator, or Operations Coordination Support) regarding work status (enroute, onsite, and so on), Estimated Times to Restoration (ETR), and scope of work regarding assigned outage/non outage events • Perform a general assessment of the next job assignments and work with the crew lead and RMT to arrange all necessary material, traffic control, and so on, are arranged prior to crew arrival • Ensure that each crew has been provided a contractor material kit and work with material logistics to secure any additional required material • Ensure that contractors are completing and submitting the Mobilization/Demobilization time sheets when both mobilization and demobilization processes are complete; sign Mob/Demob time sheets to indicate the processes are complete • Track contractor work and rest hours and ensure contractors properly complete time sheets, material lists, and equipment lists at the start and end of each shift; validate and authorize work timesheets and ensure they are submitted per existing practice • Obtain primary maps if available from the appropriate Area Work Center (AWC) • Direct relevant documentation to the Planning Section for disposition • Ensure contractors return materials to designated locations • Turn in signed contractor time sheets and completed contractor evaluation forms to the Resource Acquisition Group Manager • Participate in After Action Review(s) Personal Protective Equipment (PPE): • Reflective vest, safety shoes, hard hat Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Field I. Work Period: 8-16 hour work period per day J. Activation Notification: Email, Phone Call, or Call Out
  6. Page 324 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 324 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 3. Applicability: Electric ☒ 4. Primary Documentation: State or Business Unit Emergency Response Plan 5. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • External Resource Field Coordinator Training (EP-506) Refresher Training • 6. Required System / Drives Access: eLearning: External Resource Field Coordinator Refresher (EP-506R) Eversource N:\ Drive, SharePoint, Teams
  7. Page 325 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 325 of 328 All Hazards Emergency Response Program Effective Date: 8/15/2023 EP-ALL-EPJD-RM-15, Rev. 0 Approval Date: 8/15/2023 Crew Contact Specialist EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Crew Contact Specialist B. Reports To: Resource Acquisition (RA) Unit Leader (Crew Management) 1. Direct Reports: N/A C. Position Duties and Responsibilities: D. Pre-Event Preparations: E. Duties, Responsibilities, and Actions During an Emergency Event: The Crew Contact Specialist provides support to the Resource Acquisition Branch by being the primary contact for contractors during an emergency event as assigned: • Contact external contractor crews at set intervals throughout the day • Maintain tracking and spreadsheets of crew locations and verify that the ARCOS Dashboard is up to date, providing updated crew locations prior to IMT calls • Ensure External Resource Field Coordinators (ERFC), Crew Guides (CG), or Authorized Person (APL) submit complete and accurate Daily Work Log and Timesheet forms each day for the duration of the event, including redeployment or demobilization of resources • Check individual lodging assignments, as requested • Review the process for acquisition, activation, de-activation, and check-in of external resources for both the centralized and de-centralized models • Ensure that your laptop is up to date Perform the following actions, as assigned, for the duration of the event: • Obtain a briefing from the External Resource RA Unit Leader on the status of the ERP event and resource strategy • Check individual lodging assignments, as requested • Contact the ERFC, CG, or APL assigned to each crew (if no Eversource representative is traveling with the crew(s), contact the Contractor Supervisor) and ▪ Request confirmation of a safety briefing daily ▪ Validate roster accuracy with the ERFC, CG, or APL and identify discrepancies to the RA Unit Leader ▪ Monitor and communicate the movement/location of external resources ▪ Verify that the Resource Management Dashboard is accurate ▪ Request feedback on any safety or other concerns from the crew(s) ▪ Track the redeployment of resources from one Emergency Operations Center or Area Work Center (EOC/AWC) to another based on crew communication and verify that they are deployed according to the resource plan ▪ Track redeployment and demobilization of crews based on communications from the ERFC, CG, or APL and communicate plans to the crews as directed ▪ Remind the ERFC/CG/APL to obtain daily timesheets from each crew, including material and equipment lists, at the start and end of each shift and to validate and authorize timesheets as instructed ▪ Communicate with the Eversource Resource Support Group (ERSG) on additions, releases, or redeployments, as directed Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  8. Page 326 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 326 of 328 F. Post- Emergency Event Responsibilities and Reports: • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • If not working remotely, anti-slip footwear and appropriate clothing as needed Equipment and Supplies: • Phone • Computer • MiFi, if needed Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: As directed or remote I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out, email, phone, Teams SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan Gas ☒ Form AD 6369-2, Emergency Restoration Services Daily Worksheet Form UNK-5008-A, Eversource Contractor Storm Daily Time Sheet and Work Log Form UNK-5008-B, Eversource Contractor Storm Mobilization & Demobilization Time Log 3. Training Requirements: Initial Training • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) • Crew Contact Specialist Initial Training (EP-805) Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-RM-15 Crew Contact Specialist Refresher Training (EP-805R) SharePoint, Teams, ARCOS Production Rev 0 Page 2 of 2
  9. Page 327 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 327 of 328 All Hazards Emergency Response Program Effective Date: 4/27/2016 EP-ALL-EPJD-S-01, Rev. 0 Approval Date: 4/27/2016 Safety Officer EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Safety Officer B. Reports To: Incident Commander 1. Direct Reports: Safety Specialists C. Position Duties and Responsibilities: The Safety Officer is responsible for the overall safety and health of all personnel participating in an emergency event. The Safety Officer ensures necessary safety resources are available to support the emergency response/recovery efforts. Additionally, the Safety Officer reiterates responsibility to all response/recovery personnel to stop unsafe acts. The Safety Officer is responsible for ensuring a safety orientation during the check-in process of all non-Eversource personnel. The Safety Officer is also responsible for proper documentation of safety activities and regulatory reporting. D. Pre-Event Preparations: • Ensure the staffing rosters for the Safety Officer’s staff positions are up to date and ready to be used • The position ensures annual meetings are held by the Branch Directors, Group Managers, or Unit Leaders for employees whose primary emergency assignment differs from their BlueSky position. The meeting will: E. Duties, Responsibilities, and Actions During an Emergency Event: • Review the processes related to employees’ primary emergency assignment • Review employees’ completion of related training • Review tasks and tools associated with employees’ primary emergency assignment • Confirm that employees have been issued Personal Protective Equipment (PPE) required to complete their primary emergency assignment • Review the obligation of all employees to report to work when activated and that employees are aware of notification methods • Participate in pre-event planning and operational conference calls and meetings • Determine staffing needs based on the predicted or actual Event Type or Event Level predictions • Deploy Safety staff to various field locations as needed • Ensure safety briefings are provided for all internal and external crews who work on restoration efforts and Safety Messaging Materials are available for all personnel • Provide regular reports and updates to the Incident Commander • Assign Safety staff as needed • Ensure staffing level continues to be sufficient • Ensure safety briefings are completed per the IAP for all personnel • Notify the Incident Commander about any safety related incidents • Develop safety messages to be used during an event • Facilitate Site Safety Inspections as appropriate • Reiterate responsibility to all Eversource employees to stop unsafe acts if observed • Ensure prompt investigation and documentation following a Safety Incident or Near Miss • Support the Demobilization process Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Database.
  10. Page 328 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 328 of 328 F. Post- Emergency Event Responsibilities and Reports: • Conduct debriefing with Safety staff • Direct relevant documentation to the Planning Section • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: Incident Command Center I. Work Period: 8 - 16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State Emergency Response Plan 3. Training Requirements: Gas ☐ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System / Drives Access: EP-ALL-EPJD-S-01 Eversource N:\ Drive Rev 0 Page 2 of 2

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)