Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

Text of EOE-037_final.pdf

Extracted from the file · 1 page · 1,678 characters

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

  1. Page 71 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 71 of 328 Personal Protective Equipment (PPE): G. Equipment Required: • N/A if in the ICC Equipment and Supplies: • Phone • Computer Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ICC or Strategic Field Locations as needed I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Refresher Training • 4. Required System/Drives Access: EP-ALL-EPJD-COM-07 Eversource N:\ Drive, SharePoint, Teams Rev 1 Page 2 of 2
  2. Page 72 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 72 of 328 All Hazards Emergency Response Program Effective Date: 8/29/2023 EP-ALL-EPJD-ERSG-01, Rev. 0 Approval Date: 1/4/2022 ERSG Director EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Eversource Resource Support Group (ERSG) Director B. Reports To: Emergency Coordination Team (ECT) 1. Direct Reports: C. Position Duties and Responsibilities: D. Pre-Event Preparations: • ERSG Resource Ordering Unit Leader • ERSG Resource Tracking Unit Leader • ERSG Roster Management Unit Leader • ERSG Resource Finance Unit Leader The ERSG Director oversees the activation, operations, and demobilization of the ERSG to ensure it is ordering/hiring external resources as requested by the ECT and in doing so: • tracks external resources by State or Business Unit (such as Gas) • communicates with external resources until received by the State or Business Unit • manages movement of rosters to the appropriate State or Business Unit in the resource tracking system • provides support to contract procurement/accounts payable as needed • Assess availability, activate, and deploy unit personnel as needed • Ensure the staffing rosters for the ERSG staff positions are up to date and ready to be used • Maintain roster of non-affiliated external resources and mutual aid assistance contracts, review lists with State and Gas Business Unit Resource Acquisition, when necessary, and check on availability • Collaborate with State and Gas Resource Acquisition, as needed • Conduct an initial briefing and routine update meetings and briefings with personnel • Maintain and update ERSG tools • Have access to and proficient use of the Resource Allocation Management Program for Utility Personnel (RAMP-UP) • Fully charge all portable devices • Build and maintain relationships with Eversource Vendor Network • Work with Emergency Preparedness (EP) Logistics personnel to update and maintain policies and procedures for resources • Monitor weather updates that could impact Eversource territory • Create and update template messaging for storm hiring, demobilization, and reporting for use during incidents/events • Ensure ERSG team members have access to tools to support events Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  3. Page 73 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 73 of 328 E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: G. Equipment Required: • Create initial incident briefing for ERSG Team and ERSG Incident Action Plan (IAP) for incident response • Activate ERSG Team members • Supervise operations of the ERSG during events • Aid in and oversee acquisition of non-affiliated external resources and mutual aid resources, as requested by the ECT • Coordinate formal and informal communications between the ERSG, ECT, Northeast Gas Association (NGA), Edison Electric Institute (EEI), and North Atlantic Mutual Assistance Group (NAMAG) during incident response • Participate in all NAMAG, NGA, and EEI mutual assistance calls • Ensure resource requests are entered into the NAMAG RAMP-UP tool on behalf of Eversource • Following activation of the ERSG by the ECT, activate ERSG support personnel as appropriate • Develop an ERSG staffing schedule for the next 48 hours • Ensure the ERSG Resource Tracking Unit keeps acquired external resource counts accurate, up-to-date, and reconciled with State and Business Unit counts • Ensure the ERSG Resource Tracking Unit maintains contact with inbound acquired external resources and obtains their status at least every four hours until received by State or Business Unit resource tracking • Ensure the ERSG Roster Management Unit receives rosters from all acquired external resources and forwards them to the appropriate audience • Ensure the ERSG Finance Unit is supported during incident response and Desktop Requisitions are completed in a timely manner, as needed • Participate in NAMAG calls • Support the development of a Demobilization Plan to return to normal business operations • Ensure Food and Lodging requirements have been communicated • Aid vendors in the invoicing and payment process • Provide mutual aid information for after action reports to regulating bodies • Lead after action reviews for the ERSG • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) and lead after action improvement for the ERSG Personal Protective Equipment (PPE): • N/A - If in the ERSG Equipment and Supplies: • Phone • Computer • Two monitors • Vendor phone book Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ERSG I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out EP-ALL-EPJD-ERSG-01 Rev 0 Page 2 of 3
  4. Page 74 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 74 of 328 SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: Eversource All Hazards Emergency Response Plan, State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • resource Acquisition Training – Initial • Eversource Resource Support Group – Initial (TBD) • RAMP-UP training Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-ERSG-01 • Resource Acquisition Training – Refresher • Eversource Resource Support Group – Refresher (TBD) • Eversource N:\ Drive, SharePoint, Teams • ARCOS Crew Manager • Maximo • UConn Outage Prediction Model (OPM) • Weather Services (DTN, StormGEO, Utiliweather) • Group email boxes (for example, ERSG Roster) Rev 0 Page 3 of 3
  5. Page 75 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 75 of 328 All Hazards Emergency Response Program Effective Date: 1/4/2022 EP-ALL-EPJD-ERSG-02, Rev. 0 Approval Date: 1/4/2022 ERSG Resource Ordering Unit Leader (ERSG ROUL) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Eversource Resource Support Group Resource Ordering Unit Leader (ERSG ROUL) B. Reports To: ERSG Director 1. Direct Reports: ERSG Resource Ordering Specialist C. Position Duties and Responsibilities: Primarily responsible for procuring external mutual aid resources (personnel, equipment, and support) requested by the Emergency Coordination Team (ECT) during an incident or event. The ERSG ROUL is also responsible for Coordination between ERSG Resource Trackers and the ERSG Director to ensure resource requests are being tracked and updated appropriately to ensure ECT resource needs are being addressed during an event. D. Pre-Event Preparations: • Review common and leadership responsibilities • Assist the ERSG Director in maintaining a listing of non-affiliated external mutual aid resources. Review lists with State and Gas Business Unit Resource Acquisition; check resource availability as directed • Collaborate with State and Gas Business Unit Resource Acquisition (RA) as needed • Coordinate ERSG activation with the ERSG Director • Fully charge all portable devices • Ensure training and tools needed to execute response tasks are up to date. • Receive and respond to requests for personnel, supplies, and equipment from authorized personnel • Work with the ERSG Finance Unit and Procurement if resources are not yet in Ariba and/or require a Purchase Order (P.O.) • Maintain hiring email template • Order, receive, aid in the distribution external mutual aid resources, working with State and Gas Business Unit Resource Acquisition groups • Participate in ERSG as well as Logistics Section/Support Branch planning activities • Address informal resource requests • Record the type and amount of supplies, tactical resources, and personnel ordered and enroute to destinations, including report of status and location • Assist in the maintenance and inventory of Eversource resources • Communicate with state RA, ERSG Resource Tracking Unit Leader, ERSG Roster Management Unit Leader, and ERSG Resource Communication Unit Leader, regarding resource movements • Assist in the ERSG Demobilization Plan • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  6. Page 76 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 76 of 328 Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ERSG Equipment and Supplies: • Phone • Computer • Two monitors Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ERSG I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: Eversource All Hazards Emergency Response Plan, State or Business Unit Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Resource Acquisition Training – Initial • Eversource Resource Support Group – Initial (TBD) • RAMP-UP training Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-ERSG-02 • Resource Acquisition Training – Refresher • Eversource Resource Support Group – Refresher (TBD) • Eversource N:\ Drive, SharePoint, Teams • ARCOS Crew Manager • ERSG Request Tool • RAMP-UP • Group email boxes (for example, ERSG Roster) • TBD Rev 0 Page 2 of 2
  7. Page 77 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 77 of 328 EP-ALL-EPJD-ERSG-03, Rev. 0 All Hazards Emergency Response Program Effective Date: 1/4/2022 Approval Date: 1/4/2022 ERSG Resource Tracking Unit Leader (ERSG RTUL) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Resource Tracking Unit Leader B. Reports To: ERSG Director 1. Direct Reports: ERSG Resource Tracking Specialist C. Position Duties and Responsibilities: The ERSG RTUL ensures accurate tracking of external resources working during an emergency event to provide accurate and timely updates to the Emergency Coordination Team (ECT). D. Pre-Event Preparations: • Assist the ERSG Director with RT Unit personnel availability; activation, and deployment as needed • Assist in setup of the ERSG Room (for example, monitors, time card (t-card) board and Situation Report (SitRep) displays, standard trackers, and so on) • Fully charge all portable devices • Ensure inclusion of distribution mailing list of each State Resource Acquisition Report (and any applicable Gas Business Unit Resource Acquisition Reports) • Coordinate with each state RA Director to gather counts of on-system and off-system contract line and service resources acquired by the ERSG for the event • Coordinate with the ERSG Resource Ordering Unit Leader (ERSG ROUL) to gather counts of off-system contract line and service resources acquired by the ERSG for the event • Gather counts of off-system contract resources to be tracked, including: E. Duties, Responsibilities, and Actions During an Emergency Event: o o o o Tree crews Damage assessors Wire guards Gas resources • Establish and maintain an event-specific T-Card display • Create and maintain an event-specific ERSG Resource Tracking Report; ensure the report is accurate and up-to-date • Provide the ERSG Resource Tracking Report in a timely manner to the ECT, State RA, and others, as requested • Ensure each State/Business Unit RA Report is included in the ERSG Resource Tracking Report and the appropriate Business Unit contact is on the distribution list • Participate in the Resource Acquisition Working Group (CT) call • Participate in other meetings and calls as requested by the ERSG Director • Coordinate with the ERSG Resource Ordering Unit Leader (ERSG ROUL) to gather counts of external mutual aid resources acquired by the ERSG for the event • Gather counts of external mutual aid resources to be tracked, including, but not limited to: o o o o Tree Crews Damage Assessors Wire Guards Gas resources Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  8. Page 78 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 78 of 328 F. Post- Emergency Event Responsibilities and Reports: • Reconcile the ERSG Tracking Report with other resource tracking sources, such as State RA Reports, ARCOS, RA Working Group (CT); address and attempt to resolve any discrepancies between the ERSG Resource Tracking Report and other sources • Communicate with State RA, the ERSG ROUL, the ERSG Roster Management Unit Leader (ERSG RMUL), and the ERSG Resource Communication Unit Leader (ERSG RCUL) regarding resource movements and demobilization • Assist in the development of the ERSG Demobilization Plan • In coordination with the ERSG Director, determine the final ERSG Resource Tracking Report and notify all recipients • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ERSG • Reflective vest, safety shoes, hard hat Equipment and Supplies: • Phone • Computer • Two monitors Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ERSG I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out 1. Applicability: Electric ☒ 2. Primary Documentation: Eversource All Hazards Emergency Response Plan, State or Gas Emergency Response Plan 3. Training Requirements: SUPPLEMENTAL JOB DESCRIPTION INFORMATION Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Resource Acquisition Training – Initial • Eversource Resource Support Group – Initial (TBD) • ERSG Tracking Unit training Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-ERSG-03 • Resource Acquisition Training – Refresher • Eversource Resource Support Group – Refresher (TBD) • Eversource N:\ Drive, SharePoint, Teams • ARCOS Crew Manager • TBD Rev 0 Page 2 of 2
  9. Page 79 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 79 of 328 All Hazards Emergency Response Program Effective Date: 1/4/2022 EP-ALL-EPJD-ERSG-05, Rev. 0 Approval Date: 1/4/2022 ERSG Roster Management Unit Leader (ERSG RMUL) EMERGENCY POSITION JOB DESCRIPTION INFORMATION A. Position Title: Eversource Resource Support Group (ERSG) Roster Management Unit Leader (ERSG RMUL) B. Reports To: ERSG Director 1. Direct Reports: ERSG Roster Management Specialist C. Position Duties and Responsibilities: The ERSG Roster Management Unit Leader is responsible for coordination communication and of crew rosters between the ERSG and contracted, and among the separate Incident Management Teams (IMT). The ERSG RMUL manages and administers the ERSG email boxand communicates the confirmed number of resources that are inbound to the Eversource service territory to the ERSG Resource Trackers. D. Pre-Event Preparations: • Assist the ERSG Director with availability, activate and deploy unit personnel as needed • Assist in ERSG Room set-up (for example, monitors, time card (t-card) board, Situation Report (SitRep) displays, and Standard Trackers • Ensure proper functioning of the ERSG email box • Ensure any response email templates are formatted and operational • Fully charge all portable devices • Ensure inclusion of distribution mailing list of each State Resource Acquisition (RA) Report (and any applicable Gas Resource Acquisition Report) • Receive the current Incident Management Team (IMT) Incident Action Plan (IAP) briefing from the ERSG Director • Monitor incoming rosters from the ERSG Rosters email box E. F. Duties, Responsibilities, and Actions During an Emergency Event: Post- Emergency Event Responsibilities and Reports: o Reject rosters that do not meet Eversource standards o Capture summary roster information for rosters (# of buckets, diggers, full time equivalents (FTE), and so on) o Forward rosters to appropriate resource acquisition IMT members for scrubbing (CT RA, MA RA, NH RA, Gas RA) • Record “handoff” of resource rosters to and from the ERSG • Coordinate with the ERSG Resource Ordering Unit Leader (ROUL) to stay informed of hired or incoming resources and expected rosters • Assist in the maintenance of an event-specific T-Card display • Update event-specific ERSG Resource Tracking Report for roster completion by company • Participate in other meetings and calls as requested by the ERSG Director • Communicate with State RA, ERSG ROUL, ERST Resource Tracking Unit Leader (RTUL), and ERSG Resource Communications Unit Leader (RCUL) regarding resource movements and demobilization • Assist in the ERSG Demobilization Plan • Direct relevant documentation to the Planning Section for disposition • Participate in After Action Review(s) Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Preparedness & Business Continuity Documentation Database.
  10. Page 80 of 328

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-040 Attachment 3 Page 80 of 328 Personal Protective Equipment (PPE): G. Equipment Required: • N/A - If in the ERSG • Reflective vest, safety shoes, hard hat Equipment and Supplies: • Phone • Computer • Two monitors Personal: • Appropriate clothing for weather conditions and any personal needs for multiple days away from home H. Position Work Location: ERSG I. Work Period: 8-16 hour work period per day J. Activation Notification: Call Out SUPPLEMENTAL JOB DESCRIPTION INFORMATION 1. Applicability: Electric ☒ 2. Primary Documentation: Eversource All Hazards Emergency Response Plan, State or Gas Emergency Response Plan 3. Training Requirements: Gas ☒ Prerequisites • eLearning: Introduction to Emergency Preparedness at Eversource (EP-303) • eLearning: Introduction to the Incident Command System (EP-304) • eLearning: ARCOS and You (EP-103) • eLearning: Introduction to Business Continuity (EP-201) Initial Training • Resource Acquisition Training – Initial • Eversource Resource Support Group – Initial (TBD) Refresher Training 4. Required System / Drives Access: EP-ALL-EPJD-ERSG-05 • Resource Acquisition Training – Refresher • Eversource Resource Support Group – Refresher (TBD) • Eversource N:\ Drive, SharePoint, Teams • ARCOS Crew Manager • ERSG Roster Email box • ERSG SharePoint site • ERSG Request Tool (Realtime Systems) • TBD Rev 0 Page 2 of 2

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)