Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 215, 218

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-215 Page 1 of 1 Date Filed: September 28, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 98-99. The Company reported an incremental charge of $1,010 for the H I Stone & Son Trucking Inc vendor. The charge related to the assistance “to stop water” for activity that occurred on February 9, 2024 (one month after the MS24A event) and included a reference to the MS23B011 workorder number. Please explain how this charge was applicable to the MS24A event and provide supporting documentation. If the Company’s response identifies the charge as being applicable to the MS23B event, please provide a similar explanation and supporting documentation. Response: Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, at Line 270, H I Stone & Son Trucking Inc. (HI Stone), in the amount of $1,010. During the storm event, Connecticut experienced significant rainfall that resulted in localized flooding. As a result of the flooding, water entered the underground electrical infrastructure through the electric conduits and made its way into the handhole and meter box that impacted a customer and as a result. The Company was notified. The condition was not related to a failure of the electrical equipment itself, but rather water entering the conduit system due to the extreme weather conditions. Newtown field operations responded in conjunction with HI Stone to make repairs that included adding a sweep to the conduit and install spray foam in the conduit. This customer issue was addressed as part of post storm follow up work and the charges are applicable to the MS24A event.

As listed on the current system

Question(s) Answered 215, 218 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/28/2026

This filing on the current system (opens in a new tab)