Interrogatory responses
Answers to questions 224, 226, 229
Filed by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
EOE-224_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-224_Final.pdfRead the text of EOE-224_Final.pdf
EOE-226_Final.pdf
PDF · 91 KB · 1 pageText searchable
Download EOE-226_Final.pdfRead the text of EOE-226_Final.pdf
EOE-229_Final.pdf
PDF · 92 KB · 1 pageText searchable
Download EOE-229_Final.pdfRead the text of EOE-229_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set EOE-05
Date Issued September 11, 2026
EOE-224
Page 1 of 1
Date Filed: September 25, 2026
Witness:
John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner
Request from: Office of Education, Outreach, and Enforcement
Question:
(MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2
CLP-1A-11, pp. 252-254. The Company reported an incremental charge of $7,002 for the Lewis
Tree Service Inc vendor. Explain why the vendor was necessary for January 11, 2024 when the
storm was demobilized on January 10, 2024, the crew had only performed standby activity on both
January 9th and 10th, and the crew was only used for standby on January 11th (p. 254). As part of
the response, please identify the incremental charge associated with the standby activity on January
11th.
Response:
Throughout a storm event, Vegetation Management and Operations stay in close communication
to ensure tree crew resources are appropriate. In many storm events tree crew counts are decreased
gradually, rather than occurring all at once. Demobilization of tree crews is paired with
demobilization of line crew resources and the number of outage events remaining per AWC or
division. Even when customers are substantially restored from a storm event, there are often
remaining outage and non-outage Outage Management System (“OMS”) tickets that need to be
addressed. It is not uncommon for Operations to request that tree crews remain on shift to address
any remaining vegetation related work or to support line crews as needed. Once released from the
storm shift and sent home to rest, it will take longer for tree crew personnel to travel in and respond.
The decision to keep tree crews on shift is made by Operations leadership based on the state of
OMS tickets regionally or by area work center.
The Company does not track time differently between standby and work time for tree crews in the
same manner as line crews. There are no separate billing rates or work designations for vegetation
management crews that would differentiate standby and remediation work. Contracts with tree
contractors do not differentiate standby time or billing rates as is typical with line crew contracts.
The term “standby” on a tree crew timesheet indicates that the crew was assigned a storm shift and
was actively ready to respond to events. The charge associated with the work time on January 11,
2024, was $1,795.27.
As listed on the current system
Question(s) Answered 224, 226, 229 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/25/2026