Interrogatory responses
Answers to questions 234, 235
Filed by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
EOE-234_Final.pdf
PDF · 112 KB · 1 pageText searchable
Download EOE-234_Final.pdfRead the text of EOE-234_Final.pdf
EOE-234 Attachment 1.pdf
PDF · 724 KB · 1 pageText searchable
Download EOE-234 Attachment 1.pdfRead the text of EOE-234 Attachment 1.pdf
EOE-235_Final.pdf
PDF · 100 KB · 2 pagesText searchable
Download EOE-235_Final.pdfRead the text of EOE-235_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set EOE-05
Date Issued September 11, 2026
EOE-234
Page 1 of 1
Date Filed: September 25, 2026
Witness:
Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M.
Landry
Request from: Office of Education, Outreach, and Enforcement
Question:
(MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2
CLP-1A-16, pp. 193-212. The Company reported two incremental charges in the combined
amount of $153,711 for the M J Electric LLC vendor. Respond to the following:
a. Explain why the equipment was charged at 50% for standby. If applicable, cite the
applicable contract provisions. Additionally, identify the remaining amount ($) of
equipment that was charged for standby.
b. Referring to p. 207, confirm that the Company included a charge applicable to “car vs
pole”. If confirmed, identify the total impact of this activity and explain why this amount
was not eliminated from the storm recovery request. As part of the response, please provide
an unlocked Excel spreadsheet supporting applicable calculations.
Response:
Please refer to Exhibit ACCT-2 (CLP-1)(MS24A), Outside Line Contractors, Lines 443-444, MJ
Electric LLC, in the combined amount of $153,711.
a. Per the COC contract provisions in Exhibit B “Pricing Schedule” and within Appendix PS5, the contractor is required to charge 50% of the equipment rates while on standby.
Additionally, the remaining amount of equipment charged for standby was $4,896.75.
b. During the internal review process, it was determined that the work associated with Event
5234191 was related to storm-induced tree damage to equipment and not a car vs pole
incident as indicated on the timesheet. Therefore, the associated charges were retained as
storm-related costs and were not removed. The incorrect work description appears to have
been a documentation error. During storm restoration activities, personnel are often
managing multiple work orders simultaneously and recording information in the field,
including handwritten notes when necessary. Based on the review of the supporting
documentation, the Company determined that the work performed was storm-related and
that the discrepancy was limited to the description recorded on the timesheet. In addition,
please refer to EOE-234, Attachment 1, for the OMS details related to Event 5234191 to
validate repairs were due to tree damage.
As listed on the current system
Question(s) Answered 234, 235 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/25/2026