Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 269, 270, 274, 275, 276, 277

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

Text of EOE-275_Final.pdf

Extracted from the file · 1 page · 1,432 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-277 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 51-77. The Company reported an incremental charge of $186,314 for the Central Connecticut Cable vendor. Respond to the following: a. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on April 4, 2024, and billed those hours at DT rates in lieu of the OT rates during those specific hours. Furthermore, please identify the total incremental billing associated with the billing at DT rates during standby on April 4, 2024. b. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on April 4, 2024, and billed for equipment during those specific hours. As part of the response, please identify the total incremental billing associated with the billing of equipment during standby on April 4, 2024. Response: Referring to Exhibit ACCT-2 (CLP-6) (MS24F), Outside Line Contractors, at Line 125, Central Connecticut Cable, in the amount of $186,314. (a) and (b) In response to subparts (a) and (b). During the invoice review process, the Company determined that the contractor provided hours in the wrong column. Following discussion with the contractor and a review of the actual timesheets that clearly showed tickets and hours logged in with no standby or travel, the invoice approver was able to obtain proper documentation and approved as such. Updated timesheets received from the vendor are provided in EOE-277, Attachment 1 CONFIDENTIAL. Any remaining outstanding documentation will be provided in a supplemental response.

As listed on the current system

Question(s) Answered 269, 270, 274, 275, 276, 277 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)