Interrogatory responses
Answers to questions 268, 285
Filed by The Connecticut Light and Power Company2 files
Part of docket 26-05-10Files2
EOE-268_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-268_Final.pdfRead the text of EOE-268_Final.pdf
EOE-285_Final.pdf
PDF · 89 KB · 1 pageText searchable
Download EOE-285_Final.pdfRead the text of EOE-285_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set EOE-06
Date Issued September 22, 2026
EOE-268
Page 1 of 1
Date Filed: October 06, 2026
Witness:
Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M.
Landry
Request from: Office of Education, Outreach, and Enforcement
Question:
(TRAFFIC TIMESHEET REQUIREMENTS) Explain the specific timesheet reporting
requirements for traffic crews during both storm and blue-sky activities, and provide any internal
or external policies, procedures, or other guidance. As part of the response, identify any specific
requirements for identifying when the crews performed standby in lieu of actual traffic control
services.
Response:
Traffic crews are required to complete a daily timesheet for all work activities, including both
blue-sky and ERP/storm response assignments. Each timesheet must be completed and signed by
the flagger, include the applicable Financial Work Order information, be signed by the Owner's
representative at the end of the workday, and be submitted with the contractor's invoice. For
ERP/storm response activities, labor is billable from the time crews leave their local office or
reporting location until they return or report to the next assignment. The contract identifies standby
time as periods when traffic crews report to the job site as directed but are waiting for Owner
crews, equipment, or instructions. Such standby time is compensable at the straight-time hourly
rate. The contract does not require standby time to be tracked separately on daily timesheets. The
only requirement is that crews submit a complete and approved daily record of the work performed.
As listed on the current system
Question(s) Answered 268, 285 (The Connecticut Light and Power Company) Date Filed: 10/06/2026