Interrogatory responses
Answers to questions 863
Files9
OCC-863_Final.pdf
PDF · 103 KB · 1 pageText searchable
Download OCC-863_Final.pdfRead the text of OCC-863_Final.pdf
OCC-863 Attachment 1.pdf
PDF · 419 KB · 86 pagesText searchable
Download OCC-863 Attachment 1.pdfRead the text of OCC-863 Attachment 1.pdf
OCC-863 Attachment 1.xlsx
Excel · 1.5 MBText searchable
Download OCC-863 Attachment 1.xlsxRead the text of OCC-863 Attachment 1.xlsx
OCC-863 Attachment 2.pdf
PDF · 137 KB · 10 pagesText searchable
Download OCC-863 Attachment 2.pdfRead the text of OCC-863 Attachment 2.pdf
OCC-863 Attachment 2.xlsx
Excel · 92 KBText searchable
Download OCC-863 Attachment 2.xlsxRead the text of OCC-863 Attachment 2.xlsx
OCC-863 Attachment 3.pdf
PDF · 861 KB · 495 pagesText searchable
Download OCC-863 Attachment 3.pdfRead the text of OCC-863 Attachment 3.pdf
OCC-863 Attachment 3.xlsx
Excel · 2.0 MBText searchable
Download OCC-863 Attachment 3.xlsxRead the text of OCC-863 Attachment 3.xlsx
OCC-863 Attachment 4.pdf
PDF · 423 KB · 124 pagesText searchable
Download OCC-863 Attachment 4.pdfRead the text of OCC-863 Attachment 4.pdf
OCC-863 Attachment 4.xlsx
Excel · 366 KBText searchable
Download OCC-863 Attachment 4.xlsxRead the text of OCC-863 Attachment 4.xlsx
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-21 Date Issued September 22, 2026 OCC-863 Page 1 of 1 Date Filed: October 06, 2026 Witness: Edward A. Davis, Justin M. Pelkowski, Gerhard Walker, Kimberly R. Parsons and Amparo Nieto Request from: Office of Consumer Counsel Question: (RATE 6 – RESIDENTIAL SPACE HEATING RATE) Please provide the following data, in native Excel format with all formulas intact, for the most recent 3 consecutive years for which historical data is available and 3 future years for which forecasted data is available: a. b. c. d. Average hourly system load data by month; Average hourly marginal costs by month; Maximum monthly system peak; 8760 load data for the residential class. Response: Please refer to the following attachments for the Company’s response to the following subparts; • • • • Please refer to OCC-863, Attachment 1, for the response to subpart (a) Please refer to OCC-863, Attachment 2, for the response to subpart (b) Please refer to OCC-863, Attachment 3, for the response to subpart (c) Please refer to OCC-863, Attachment 4, for the response to subpart (d) The hourly system load data and maximum monthly system peak loads were calculated from historical hourly distribution substation loads (last 3 years) across all distribution substations in Eversource’s service area. No forecasted hourly system loads are available. The hourly average marginal costs by month requested in subpart (b) and included in OCC-863, Attachment 2, that reflects the system-wide marginal distribution substation and trunkline feeder cost per kW, assigned to each hour type within the month.
Text of OCC-863 Attachment 2.xlsx
Extracted from the file
Text of OCC-863 Attachment 3.pdf
Extracted from the file · 495 pages · 1,386,787 characters
Text of OCC-863 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of OCC-863 Attachment 4.pdf
Extracted from the file · 124 pages · 421,056 characters
Text of OCC-863 Attachment 4.xlsx
Sheet names, column headings and text cells; numbers left out
As listed on the current system
Question(s) Answered 863 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026