Text of OCC-863 Attachment 2.pdf

Extracted from the file · 10 pages · 36,671 characters

Text of OCC-863 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of OCC-863 Attachment 3.pdf

Extracted from the file · 495 pages · 1,386,787 characters

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: OCC-863 Attachment 3 Page 1] Monthly Max MW Across All Distribution Substations Month Max MW | Max MW | Max MW | Max MW Source: | The values in table above are calculated based on the maximum monthly historical system-wide substation hourly loads, provided by Eversource [Sheet: OCC-863 Attachment 3 Page 2] DateTime | Year | Month | Hour | Actual Load Source of Distribution Substation Load: Response to MCOS request #25 Hourly substation loads for the past four years (2022-2025)

Text of OCC-863 Attachment 4.pdf

Extracted from the file · 124 pages · 421,056 characters

Text of OCC-863 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 863 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)