Interrogatory responses
Answers to questions 277
Filed by The Connecticut Light and Power Company2 files
Part of docket 26-05-10Files2
EOE-277-SP01_Final.pdf
PDF · 92 KB · 1 pageText searchable
Download EOE-277-SP01_Final.pdfRead the text of EOE-277-SP01_Final.pdf
EOE-227-SP01 Attachment 1 REDACTED.pdf
PDF · 398 KB · 1 pageNo text in this file
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set EOE-06
Date Issued September 22, 2026
EOE-277-SP01
Page 1 of 1
Date Filed: October 27, 2026
Witness:
Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G.
Griffin
Request from: Office of Education, Outreach, and Enforcement
Question:
(MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2
CLP-6A-3, pp. 51-77. The Company reported an incremental charge of $186,314 for the Central
Connecticut Cable vendor. Respond to the following:
a. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on
April 4, 2024, and billed those hours at DT rates in lieu of the OT rates during those specific
hours. Furthermore, please identify the total incremental billing associated with the billing
at DT rates during standby on April 4, 2024.
b. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on
April 4, 2024, and billed for equipment during those specific hours. As part of the response,
please identify the total incremental billing associated with the billing of equipment during
standby on April 4, 2024.
Supplemental Response:
Please refer to EOE-277 SP01, Attachment 1, for the contractors Daily Time and Work Report.
Original Response:
Referring to Exhibit ACCT-2 (CLP-6)(MS24F), Outside Line Contractors, at Line 125, Central
Connecticut Cable, in the amount of $186,314.
In response to subparts (a) and (b). During the invoice review process, it was determined
that the contractor provided hours in the wrong column. Following discussion with the
contractor and a review of the actual timesheets which clearly showed tickets and hours
logged in with no standby or travel, the invoice approver was able to obtain proper
documentation and approved as such. Updated timesheets received from the vendor are
provided in EOE-277 Attachment 1. Any remaining outstanding documentation will be
provided in a supplemental response.
As listed on the current system
Question(s) Answered 277 (The Connecticut Light and Power Company) Date Filed: 10/27/2026