Interrogatories
To CL&P, questions 288 thru 301
Files1
26-05-10 - EOE Interrogatories Set 6.pdf
PDF · 361 KB · 23 pagesText searchable
Download 26-05-10 - EOE Interrogatories Set 6.pdfRead the text of 26-05-10 - EOE Interrogatories Set 6.pdf
Page 11 of 23
d. Provide the relevant signed timesheets or other documents supporting the validity of the hours billed. If timesheets were not obtained, explain how the Company was able to validate the validity of the hours charged. e. The Invoice included a reference to “Detailed spreadsheet provided”. Please provide the referenced spreadsheet. EOE-291. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 216-233. The Company reported two incremental charges in the combined amount of $259,193 for the E-J Electric T&D LLC vendor. Respond to the following: a. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 1147 includes a List of Exhibits at p. 1153 which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. b. Reference the billed rates on pp. 217 and 223 and the rates provided within OCC-044, Att.2 (Confidential), p. 1277. Explain why the rates charged by the vendor exceed the rates included within the contractual rate table provided. To the extent that the vendor billed higher rates than referenced within the contract, provide an Excel spreadsheet demonstrating the amounts overbilled. c. Referring to p. 223, explain why the cost of equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. d. Referring to pp. 218-221, explain why the Company permitted the vendor to exclude information within boxes 24 (Event Start Time) and 25 (Event End Time). As part of the response, identify when the crews received their first assignment. EOE-292. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 234-247. The Company reported an incremental charge of $205,216 for the Elecnor Hawkeye LLC vendor. Respond to the following: a. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 1492 includes a List of Exhibits at p. 1498 which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. b. Referring to pp. 238, 240, 242, 244-245, explain why the equipment was charged during standby (i.e., at the “1/2 rate” referenced) when thePage 12 of 23
Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. EOE-293. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-5, pp. 1-25. The Company reported an incremental charge of $3,825 for the Elite Flaggers LLC vendor. The invoice included several references to “Rain Day” where each of the crews billed for four hours on April 5, 2024 (p. 2). Explain if the Rain Day charges involved storm remediation or if these were the result of job cancellations. If applicable to a job cancellation, identify if the vendor’s contract permits it to bill for a minimum number of hours when services cannot be performed due to rain and provide the relevant citation. If applicable to storm remediation, provide documentation demonstrating the assignments performed on April 5, 2024. EOE-294. (ECI COMPETITIVE BID ASSESSMENT) Explain the specific services performed by the Environmental Consultants Inc. vendor. Additionally, identify if the Company pursued competitive bids for the services performed by ECI prior to engagement. If pursued, provide documentation demonstrating the Request for Proposal (RFP) and the overall results. If not pursued, explain why. EOE-295. (MS24F-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 1-149. The Company reported an incremental charge of $6,403 for the Environmental Consultants vendor. The invoice (pp. 1-2) appears to include approximately one month of billing for the vendor and is supported by individuals’ weekly timesheets. Explain how the Company determined the amount applicable to the MS24F event and provide supporting documentation. Additionally, cite to the vendor’s contract and corresponding pricing schedule. If the contract or corresponding pricing schedule was not provided, please provide. EOE-296. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 150-170. The Company reported an incremental charge of $16,352 for the Extra Duty Solutions vendor. Respond to the following: a. Identify the specific charges (i.e., line items) within the invoice that were allocated to the MS24F storm event. b. Explain why the invoice includes multiple line items referenced as Storm Standby for police officers. As part of the response, explain if the Company is required to stage police officers for storm events. If required, provide or cite the applicable requirements.Page 13 of 23
c. The invoice includes multiple references to “Job Cancelled.” Identify the total charges for cancellations applicable to the MS24F event, as well as the charges applicable to other activities. Explain why the Company was required to incur charges for cancellations and identify the minimum amount of time that would have prevented charges for cancellations. EOE-297. (MS24F-VENDOR-FOOD/LODGING) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 173-175. The Company reported an incremental charge of $5,707 for the Graduate Hotels Storrs vendor. Explain why the invoice differs from the amount requested for recovery. EOE-298. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 178-179. The Company reported an incremental charge of $14,174 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. EOE-299. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 186-191. The Company reported three incremental charges in the combined amount of $16,459 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. Additionally, explain why the Scope of Work (pp. 187, 189, 191) references different work order numbers. EOE-300. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 202-211. The Company reported an incremental charge of $100,209 for the Harlan Electric Construction vendor. Respond to the following: a. Provide a brief description of the timing of events for this vendor and reconcile those activities with the documentation provided. As part of the description, explain how the vendor would have incurred four hours of billing from 6am to 10am on April 3, 2024 (to “Pick up Eversource Buckets” as referenced on pp. 204-207) and then resumed billing on April 4, 2024, at 6am with no Travel or hotel costs. Additionally, explain why the vendor finished its last assignment at 3:30pm on April 4, 2024, but was permitted to continue billing until 10:00pm. b. Referring to pp. 204-207, explain why the vendor was permitted to bill each employee for four hours on April 3, 2024, to “Pick up Eversource Buckets.” As part of the response, identify where the vendor was mobilized from. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 2286 includes a List of Exhibits atPage 14 of 23
p. 2292 which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. d. Referring to pp. 208-211, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. EOE-301. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 212-215. The Company reported an incremental charge of $47,615 for the Haugland Energy Group vendor. Respond to the following: a. Confirm that the difference between the reported recovery amount ($47,615) and the invoice amount ($48,408) is attributed to the “car vs. pole” activity referenced on p. 215. If not confirmed, explain the difference. b. Referring to p. 215, explain if the Eversource Contractor Storm Daily Time & Work Report was fully completed as required by the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. If not fully completed, explain why the Eversource reviewer did not require the information to be completed prior to approval. c. Provide an unlocked Excel spreadsheet supporting the calculation of the “car vs. pole” and explain how the Company was able to derive the amount based on the missing information (i.e., boxes 24 and 25) contained within the Eversource Contractor Storm Daily Time & Work Report on p. 215. EOE-302. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 216-227. The Company reported an incremental charge of $312,425 for the Haugland Energy Group vendor. Referring to pp. 219-221, explain how each signed Eversource Contractor Storm Mobilization & Demobilization Time Report identified the vendor’s start time of 1600 and end time of 1800 but included a total billing of nine hours for April 3, 2024. As part of the response, provide an unlocked Excel spreadsheet supporting the total amount of overbilling that resulted from the overstatement. EOE-303. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 228-229. The Company reported an incremental charge of $5,968 for the Henkels & McCoy vendor. The charge related to repairs resulting from “truck ruts” resulting from Eversource Storm Work that appears to be at a residential address (p. 229). Explain how Eversource vehicles could have incurred damage to the referencedPage 15 of 23
property requiring the $5,968 of repairs (i.e., over 1600 square feet of loam/seed). Furthermore, explain why the Eversource vehicles needed to drive on the property and identify the proximity of the damage to the public road. EOE-304. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 246-259. The Company reported an incremental charge of $231,039 for the IB Abel Inc. vendor. Respond to the following: a. Referring to p. 250, confirm that the Company included a charge applicable to “car vs pole”. If confirmed, identify the total impact of this activity and explain why this amount was not eliminated from the storm recovery request. As part of the response, please provide an unlocked Excel spreadsheet supporting applicable calculations. b. Referring to OCC-044, Att.2 (Confidential), pp. 2725-2752, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 2732). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. c. Referring to pp. 249-251, 253, provide an unlocked Excel spreadsheet calculating the billed equipment costs applicable to the reported standby activity. d. Referring to p. 254, explain why the vendor identified approximately four hours of standby (i.e., boxes 23-25: 1635-2030) but billed that time as Work (box 12). As part of the response, provide an unlocked Excel spreadsheet detailing the difference in pricing (i.e., labor and equipment) had these hours been reported as standby. e. Referring to p. 254, explain why the vendor was permitted to bill for two hours to “Eat and bed down” (i.e., boxes 23-25). As part of the response, provide an unlocked Excel spreadsheet detailing the incremental amount incurred for the vendor for the two hours (i.e., labor and equipment). EOE-305. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 280-281. The Company reported an incremental charge of $35,967 for the KTI Utility Construction & Maintenance LLC vendor. Respond to the following: a. Identify the total amount of charges applicable to standby activity. b. Explain the process for when the vendor would be mobilized to perform pole replacements or repairs. As part of the response, explain why the vendor would be mobilized prior to the worksite being properly secured. c. For each standby charge, explain the circumstances for which the vendor was engaged prior to worksite being secured.Page 16 of 23
d. Referring to the applicable Event Level Matrix (ELM) within EOE-010, Att.5, pp. 17-19, identify where the civil crews are identified for staging purposes. If not included in referenced pages, cite the applicable pages. EOE-306. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP6A-8. The Company reported 126 incremental charges (Excel Rows 198323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Explain why every Weekly Operations Summary report (e.g., pp. 283, 287, 291, etc.) included a ‘Time Start’ and a ‘Time Finish’ of 7:00AM and 4:00PM, respectively, which does not agree with the hours billed. As part of the response, explain how the Company was able to validate the accuracy of the hours billed and provide supporting documentation available to the reviewer at the time verifying that the hours were correctly billed for each invoice (i.e., crew). Additionally, provide an unlocked Excel spreadsheet listing each invoice, detailing the crew’s start and end times, identifying the billable amounts, and identifying if supporting documentation (i.e., available to the arborist at the time of the review) is being provided. EOE-307. (MS24F-VENDOR-TREE-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. The Company was billed for atypical equipment including extra chainsaws, chipper disks, chip trucks, log trucks, and a backyard lift. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced equipment, the amounts billed for the applicable equipment, and the justification for why the equipment was necessary for storm remediation purposes. Additionally, please provide documentation of prior authorization for each charge. EOE-308. (MS24F-VENDOR-TREE-EXPENSE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Referring to Excel Row 290, explain how the “Billable Expense” referenced in the invoice is applicable to the MS24F event when each of the supporting invoices (i.e., CLP-6A-7. pp. 181-186) were dated as of March 2024, prior to the event. EOE-309. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP6A-8. The Company reported 126 incremental charges (Excel Rows 198323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Referring to Excel Row 307, explain how the referenced activity, which occurred on April 9, 2024 (several days after demobilization), related to the MS24F event. As part of the response, explain why a 2023 TreePage 17 of 23
Removals report was provided in lieu of the Emergency Restoration Tree Contractor Work Location report and explain why that report listed activity that appears to be routine vegetation removals. If applicable, please provide additional documentation demonstrating the applicability of the activity to the MS24F event. EOE-310. (MS24F-VENDOR-TREE-DELAYED REMEDIATION) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. The Company was billed for remediation between the dates of April 10, 2024, and August 13, 2024, when the storm event was demobilized on April 4, 2024. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced dates, the amounts billed for each date, and, as applicable, provide documentation demonstrating that the remediation was both necessary and directly applicable to the MS24F event. To the extent that errors are identified, please reference each error in the Excel spreadsheet. EOE-311. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-8, pp. 68-136. The Company reported three incremental charges in the combined amount of $137,422 for the Lucas Tree Experts vendor. Respond to the following: a. Referring to pp. 73, 75, 77, and 79, explain if the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were completed in accordance with the Company’s requirements. As part of the response, identify if generic responses are indicative of standby activity. b. Referring to pp. 76, 82, 88, 90, 100, 106, 108, 112, 116, 123, 127, 129, 131, 133, and 135, explain why the vendor was not required to bill at ST rates through 1630. Additionally, please provide an unlocked Excel spreadsheet detailing each timesheet referenced above and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charges. EOE-312. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-8, pp. 194-229. The Company reported an incremental charge of $271,950 for the McPhee Electric LTD vendor. Respond to the following: a. Referring to p. 205, explain why each of the crews were permitted to bill for four hours of demobilization travel time without any documentation to support applicable travel. As part of the response, identify the beginning and ending locations, distance between the two locations, original estimated travel time, modified estimated travel time applyingPage 18 of 23
1.3 factor, and the difference. Additionally, identify the incremental cost associated with the derived difference. b. Referring to p. 205, explain why the vendor billed equipment during standby on April 5, 2024. As part of the response, identify the cost of equipment billed during the standby hours. c. Referring to pp. 195, identify if the vendor had access to Company provided meals for any period during their assignment. If the vendor had access, explain why they were paid for meals for the entire duration of their support. EOE-313. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 11-23. The Company reported an incremental charge of $756,614 for the Michels Power vendor. Respond to the following: a. Referring to pp. 13-14, explain why the billed equipment rates exceed the contractual rates included within OCC-044, Att.2 (Confidential), pp. 4391-4395. As part of the response, provide an unlocked Excel spreadsheet detailing the equipment billed via the invoice to equipment rates provided within the contract and identify the amount of overbill. b. Referring to pp. 17, 19, 21, and 23, explain if the Eversource Contractor Storm Daily Time & Work Report was completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter information within boxes 24 (Event Start Time) and 25 (Event End Time) prior to the Company’s approval. EOE-314. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 24-38. The Company reported two incremental charges in the combined amount of $142,456 for the MTV Solutions Inc. vendor. Respond to the following: a. Referring to pp. 25-26, 29, 32, and 35, explain why the vendor was permitted a higher rate for the Digger Derrick than permitted within the pricing schedule provided at OCC-044, Att.2 (Confidential). As part of the response, identify the incremental impact of the higher rate. b. Referring to pp. 24-38, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on April 8, 2024 (several days after demobilization) in lieu of Company personnel.Page 19 of 23
EOE-315. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 39-44. The Company reported an incremental charge of $3,413 for the New England Flagger Services vendor. Certain supporting documents (i.e., pp. 41, 43) referenced “Rain Day”. Explain if any of the charges related to cancellations of previously scheduled assignments in lieu of actual flagging services. If applicable to cancellations, identify the specific activity and total incremental amount. EOE-316. (MS24F-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 132-169. The Company reported an incremental charge of $96,464 for the Pasquariello Electric Corp vendor. Respond to the following: a. Comparing p. 132 with pp. 133-142, explain why the vendor billed all activity at DT rates when each of the Eversource Contractor Storm Daily Time & Work Reports reported both standby and travel time. As part of the response, provide an unlocked Excel spreadsheet calculating the excess amount billed using the Travel/Standby response rate included in the pricing schedule provided at Confidential EOE-014, Att.2, p. 2094. b. Comparing p. 132 with pp. 133-142, explain why the vendor billed for equipment during standby. As part of the response, provide an unlocked Excel spreadsheet calculating the total incremental charge for the equipment billed during standby. c. Referring to pp. 133-142, explain if the Eversource Contractor Storm Daily Time & Work Reports were completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter the required information prior to the Company’s approval. EOE-317. (MS24F-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 170-174. The Company reported three incremental charges in the combined amount of $43,802 for the Paul Gregorys LLC and Perk on Main LLC vendors. Provide an unlocked Excel spreadsheet detailing the total all-in costs for each meal (i.e., breakfast, lunch, and dinner) and provide a comparison of the cost to the maximum meal caps outlined within Eversource’s restaurant meal policy. EOE-318. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 187-201. The Company reported two incremental charges in the combined amount of $45,869 for the Riggs Distler & Company Inc vendor. Respond to the following: a. Referring to p. 189, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on May 29, 2024, in lieu of Company personnel. Additionally, providePage 20 of 23
contemporaneous documentation supporting that the crossarm on pole 2264 was damaged by the MS24F event. b. Comparing p. 199 with p. 200, explain why the vendor billed for equipment during standby. As part of the response, provide an unlocked Excel spreadsheet calculating the total incremental charge for the equipment billed during standby. c. Referring to pp. 200-201, explain if the Eversource Contractor Storm Daily Time & Work Reports were completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter the required information prior to the Company’s approval. EOE-319. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-10, pp. 1-6. The Company reported an incremental charge of $58,786 for the South Norwalk Electric and Water vendor. Respond to the following: a. Confirm that the vendor is a mutual aid provider who is not subject to a contract or pricing schedule. Additionally, confirm that the OH&B charge refers to a grandfathered overhead charge. If not confirmed, provide details regarding the vendor, the contract, and the OH&B charge. Please note any changes in process since the Company’s response to EOE615 in Docket No. 25-12-13. b. Identify if the Company has provided mutual aid support for the South Norwalk Electric and Water vendor since the last rate case. If support has been provided, provide a detailed listing of support provided, include the dates of such support, along with a copy of the most recent invoice. EOE-320. (MS24F-VENDOR-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-10, pp. 21-35. The Company reported 14 incremental charges in the combined amount of $144,942 for the Sunbelt Rentals Inc. vendor. Respond to the following: a. Provide copies of any service level agreements (SLAs) between the Company and the vendor detailing the amount of time permitted for the vendor to provide a generator upon request. If SLAs do not exist, explain why. b. Provide a detailed listing of each generator rented, along with the corresponding costs (i.e., rental, labor, setup, etc.) and identify generators that were not utilized in support of storm response. For any generators not used, explain why the Company rented the generators and identify if there were any specific outages that warranted the rental of the generators that were resolved before usage.
As listed on the current system
Interrogs from PURA/EOE to CL&P 288 thru 301-Issued 09/22/2026 [26-05-10]