Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatories

To CL&P, questions 302 thru 321

Files1

  1. Page 1 of 23

    STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY OFFICE OF EDUCATION, OUTREACH, & ENFORCEMENT September 22, 2026 Docket No. 26-05-10 Re: Docket No. 26-05-10 - Application of CL&P dba Eversource Energy to Amend its Rate Schedules Enclosed are interrogatories EOE-268 through EOE-329 directed to The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource,” or “Company”). The responses to these questions have been deemed necessary by the Public Utilities Regulatory Authority (Authority) Office of Education, Outreach, and Enforcement (EOE) in connection with the above referenced docket, and will become a part of the record in this proceeding. Please note that persons responsible for responses must be available for cross-examination during a hearing, if held, and must attest to the truth and accuracy of their responses. Please submit the responses to the Authority’s Executive Secretary no later than 4pm on October 6, 2026. If a response to any of the requested information has already been filed in response to another interrogatory response in this proceeding, please reference the interrogatory which provides the information. It is the respondent’s responsibility to ensure that any such information is on file with the Executive Secretary of the Authority. EOE requests that all interrogatory responses be included in the same document, rather than responses to each interrogatory being filed as individual documents. Anyone filing material with the Authority should file only an electronic copy through the PURA Web Filing System. Please refer to Electronic Filing on the Authority’s website for more information. Paper filings will be accepted only if a person is unable to file electronically. The Authority reserves the right to request paper copies of certain filings at a later date. No confidential material may be filed publicly through the web filing system. Confidential material can be filed electronically by email using the following directions: confidential material must be emailed directly to [email removed] in an email with a subject line labeled in all capital letters “CONFIDENTIAL MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic confidential information shall also contain a header “CONFIDENTIAL – NOT FOR PUBLIC DISCLOSURE.” The motion for a protective order shall be filed publicly. The Authority operates with the strong presumption that all documents filed with it are public records subject to the right of public inspection and copying in accordance with the Connecticut Freedom of Information Act, Conn. Gen. Stat. § 1-200 et. seq. In those 10 Franklin Square, New Britain, CT 06051 An Equal Opportunity Employer www.ct.gov/pura
  2. Page 2 of 23

    exceptional circumstances where a participant believes that information it intends to file is confidential under law, it may file a Motion for a Protective Order requesting an exemption from public disclosure. The Motion must provide specific legal arguments with reference to state or federal law describing with supporting facts why the information should be kept confidential. A certified affidavit supplied by a competent witness in support of the Motion, a proposed protective order and nondisclosure agreement must be appended to the Motion. The Authority will rule on the Motion forthwith, and give further direction as necessary. Contact the Authority’s Executive Secretary at [phone removed] with questions regarding making a confidential filing. The current service list for this docket is available on the Authority's website located at www.dpuc.state.ct.us/DPUCservlist.html. Sincerely, By: /s/Britany Wyman Brittany Wyman Attorney PUBLIC UTILITIES REGULATORY AUTHORITY Office of Education, Outreach and Enforcement Enclosure cc: Service List
  3. Page 3 of 23

    CERTIFICATE OF SERVICE I hereby certify that on this day the foregoing document was filed with the Public Utilities Regulatory Authority, and copies thereof were served upon each person designated on the official service list in this proceeding in accordance with R.C.S.A. § 16-1-15. Sincerely, By: /s/Britany Wyman Brittany Wyman Attorney PUBLIC UTILITIES REGULATORY AUTHORITY Office of Education, Outreach and Enforcement
  4. Page 4 of 23

    The following Interrogatories, designated as EOE-268 through EOE-329, are directed to The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource,” or “Company”). EOE-268. (TRAFFIC TIMESHEET REQUIREMENTS) Explain the specific timesheet reporting requirements for traffic crews during both storm and blue-sky activities, and provide any internal or external policies, procedures, or other guidance. As part of the response, identify any specific requirements for identifying when the crews performed standby in lieu of actual traffic control services. EOE-269. (VEGETATION CREW TIMESHEET REQUIREMENTS) Refer to Response to EOE-022. The Company’s response referenced that “[g]uidance on the handling of tree crew timesheets is included in all executed contracts…” Please provide or cite the specific guidance referenced in the response and identify if there are different expectations for each vendor. EOE-270. (CANCELLATIONS) Explain the Company’s process for identifying and canceling scheduled activity either prior to or during a storm event. As part of the response, please provide a listing of all cancellations for each storm event and the amount associated with each cancellation. EOE-271. (FUEL PROVIDERS) Identify if the Company pursued competitive bids in support of its engagement of Fuel providers. If pursued, provide documentation demonstrating the Request for Proposal (RFP) and the overall results. If not pursued, explain why. EOE-272. (MS24F-TIMING) Refer to Exhibit CLP-STORM-IMT-3 (Event 6) and Response to EOE-019, Att.1. Explain how the information provided within Ex. CLP-STORM-IMT-3 supports an initial arrival time of 6am within EOE019, Att.1. As part of the response, explain why the Company defined an initial arrival time that is 12 hours prior to the declaration of the ERP (i.e., Ex. CLP-STORM-IMT-3, p. 65) and 24 hours before the Emergency Operations Centers (EOCs) were activated (i.e., Ex. CLP-STORM-IMT-3, p. 65). EOE-273. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-1, pp. 23-62. The Company reported an incremental charge of $377,813 for the Asplundh Construction Corp. Respond to the following: a. Referring to pp. 40, 44, 47, 49, 51, 53, 55-56, and 59, explain why each of the crews were permitted to commence billing on April 3, 2024, at either 0600 or 0630 and solely bill for standby when the ERP declaration did not occur until 1800. As part of the response, please identify the
  5. Page 5 of 23

    incremental cost for the standby billing on April 3, 2024 for the hours prior to the 1800 ERP declaration. b. Referring to p. 43, explain why two individuals were permitted to bill for four hours (each) of travel for demobilization on April 5, 2024, without any details regarding the commute or the documentation to demonstrate that there was a commute (i.e., there was no corresponding mobilization). As part of the response, please provide documentation that was available at the time of the review. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 180 includes a List of Exhibits at p. 188 which references the Pricing Schedule as Exhibit B but was unable to locate the document. Additionally, EOE observed similar documentation within EOE-024, Att.2 (Confidential). with a similar omission. d. Referring to pp. 24-34, explain why the vendor billed for equipment during standby. As part of the response, identify the total incremental charge for the equipment billed during standby and separately identify the incremental equipment charge for the hours referenced in subsection b. EOE-274. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibits ACCT-2 CLP-6A-1 through CLP-6A-2. The Company reported 79 incremental charges in the combined amount of $315,461 for the Asplundh Tree Expert Co vendor. Respond to the following: a. Referring to rows 102-106, explain why the vendor incurred storm related charges for activity that occurred between April 8, 2024, and April 12, 2024, when the storm was demobilized on April 4, 2024. As part of the response, clarify if any of the charges should have been charged to the MN24J minor storm event (i.e., referenced in EOE-013, Att.1) and, if still applicable, provide documentation to support both the necessity and applicability of the remediation to the MS24F event. Finally, explain why some of the activity was performed at OT rates (e.g., pp. 98-100) and why the activity could not be performed by Eversource employees. b. Referring to rows 79, 80, 103, 105, and 106, the Company included charges for Disc Chippers. Explain why the Disc Chippers were necessary for storm remediation purposes. As part of the response, provide documentation to support the Company’s pre-authorization of the additional charges and identify the total amount charged for Disc Chippers. c. Referring to rows 52-58, 69-77, 92-93, and 95-96, explain why the vendor was not required to bill at ST rates for the hours billed through 1630. Specifically, the Company permitted 20 invoices to be billed at ST rates through 1600, typically for two consecutive days and failed to bill at the ST rate through 1630.
  6. Page 6 of 23

    d. Provide an unlocked Excel spreadsheet detailing each invoice referenced above (i.e., the referenced Rows) and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charge. Specifically, include the differential between the OT rate and ST rate multiplied by the hours billed at OT rates through 1630. EOE-275. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-2, pp. 137-142. The Company reported an incremental charge of $500 for the CC Security Corp vendor. The invoice details activity from April 1, 2024, through April 5, 2024, details unrelated workorder numbers, and appears to include costs from April 1, 2024 (i.e., several days prior to the MS24F event) within the recovery request. Explain how the costs were relevant to the MS24F event and provide supporting documentation. To clarify, the invoice included a subsequently added reference to “34X M24F011” for April 1, 2024, but all of the activity from April 1, 2024, through April 3, 2024, was prior to the storm event. EOE-276. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 1-22. The Company reported an incremental charge of $5,589 for the CC Security Corp vendor. The invoice details 22 individual charges with most line items referencing nonstorm workorder numbers or an unrelated minor storm workorder number (i.e., MN24J). Identify the specific charges applicable to the MS24F event and provide supporting documentation. Identify the amount of charges included which are unrelated to the MS24 event. EOE-277. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 51-77. The Company reported an incremental charge of $186,314 for the Central Connecticut Cable vendor. Respond to the following: a. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on April 4, 2024, and billed those hours at DT rates in lieu of the OT rates during those specific hours. Furthermore, please identify the total incremental billing associated with the billing at DT rates during standby on April 4, 2024. b. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on April 4, 2024, and billed for equipment during those specific hours. As part of the response, please identify the total incremental billing associated with the billing of equipment during standby on April 4, 2024.
  7. Page 7 of 23

    EOE-278. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 78-102. The Company reported an incremental charge of $4,271 for the Certified Utility Services Inc. vendor. The invoice detailed activity that occurred both prior to and subsequent to the MS24F event but did not include activity between the storm’s mobilization (i.e., 1800 on April 3, 2024) and demobilization (i.e., April 4, 2024). Additionally, none of the Job assignment documents referenced the MS24F event. Identify which, if any, of the assignments supported the MS24F event and provide supporting documentation where appropriate. Identify the amount of charges included which are unrelated to the MS24F event. EOE-279. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 110-131. The Company reported an incremental charge of $4,658 for the Certified Utility Services Inc vendor. The invoice details activity that spanned both before and after the storm event, with no activity on April 4, 2024 (i.e., the primary day of storm recovery). Additionally, none of the Job assignment documents identified the MS24F011 workorder number as being relevant. Please identify the specific assignments that applied to the MS24F event and provide supporting documentation. Identify the amount of charges included which are unrelated to the MS24F event. EOE-280. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 132-135. The Company reported two incremental charges in the combined amount of $1,080 for the Certified Utility Services Inc vendor. Explain why both invoices referenced that they only performed standby but were permitted to bill for work zone setup, in addition to the hourly labor rate. Furthermore, cite the contract provisions that permit this billing treatment. If the contract has not yet been provided, please provide. To the extent that the vendor should not have billed for work zone setup during standby, please identify the total impact of this activity throughout all invoices included within Excel Rows 126-142. EOE-281. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 136-161. The Company reported an incremental charge of $16,693 for the Certified Utility Services Inc vendor. The invoice details activity from April 2, 2024 (i.e., prior to the mobilization at 6pm on April 3, 2024) to April 5, 2024, and references several unrelated workorder numbers. For each Job assignment document that details a different workorder number (i.e., pp. 139-141), please provide documentation to support the applicability of the charges to the MS24F event. Identify the amount of charges included which are unrelated to the MS24F event.
  8. Page 8 of 23

    EOE-282. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 218-230. The Company reported an incremental charge of $10,253 for the Certified Utility Services Inc vendor. Explain how the Company verified the alignment of costs to the MS24F event when most of the supporting Job assignment documents referred to different workorder numbers, including MN23AK011 (pp. 221, 224, 228, and 230) and MN23J011 (pp. 222, 223, 226, and 227). As part of the response, identify if these costs were incorrectly charged to MS24F or explain why the Company didn’t have the vendor correct the workorder number. EOE-283. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 39-49. The Company reported an incremental charge of $5,715 for the Certified Utility Services Inc vendor. The incremental cost included a Job assignment document on p. 49 that identified the activity as “Storm cancel”. Identify the nature of the services provided on April 5, 2024 (p. 49) and explain what “Storm cancel” was in relation to. As part of the response, identify if these costs were related to the cancellation of previously scheduled activity and if the hours represented a minimum number due to cancellation. Cite the contract provisions that permit the billing of hours for the cancellation. If the contract has not yet been provided, please provide. EOE-284. (MS24F-VENDOR-OTHER) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 56-59. The Company reported four incremental charges in the combined amount of $1,263 for the Charter Oak Building Maintenance Inc. vendor. The invoices provided descriptions of “storm related extra work” (p. 56), “coverage for building mechanic” (p. 57), and “storm related work” (pp. 58-59). Identify the specific services performed and explain how the services were both necessary and incremental for storm remediation purposes. EOE-285. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 86-87. The Company reported two incremental charges in the combined amount of $14,535 for the Coleman Drilling & Blasting Inc vendor. Both of the invoices were billed for hourly activity without signed timesheets or equivalent documents. Provide the relevant signed timesheets supporting the individuals and hours worked. If timesheets were not obtained, explain how the Company was able to validate the accuracy and applicability of the charges. EOE-286. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 88-107. The Company reported six incremental charges in the combined amount of $1,121,268 for the Conexus Energy Group LLC vendor. The Company provided invoices for five of the six charges but failed to provide signed Eversource Contractor Storm Daily
  9. Page 9 of 23

    Time & Work Reports or Eversource Contractor Storm Mobilization & Demobilization Time reports (collectively timesheets). Respond to the following: a. Provide the omitted signed timesheets for the charges included in Rows 154-158. If the documents cannot be provided, explain how the Company validated the accuracy of the billed activity. b. Referring to pp. 98-99 (i.e., supporting Row 159), explain why the vendor was permitted to bill for lodging when they were mobilized out of Beacon Falls, CT. As part of the response, identify if the lodging expense was due to contractual obligations and specify if the vendor was lodged at a hotel. If lodged at a hotel, identify the location. c. Referring to pp. 100-102, explain why the vendor was permitted to bill for 2 hours of travel time between Beacon Falls, CT and Milford, CT, a distance of approximately 20 miles. d. Referring to pp. 103-107, the timesheets provided identify the first assignment dispatch time of 8:34, approximately 2.5 hours after the vendor’s start time (i.e., box 6). Explain why the vendor did not record activity as standby until the initial assignment. As part of response, please identify the incremental impact of the vendor’s billing of equipment for 2.5 hours. EOE-287. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 108-126. The Company reported an incremental charge of $1,475 for the D&D Power LLC vendor. The supporting timesheet provided at p. 121 reported 2 hours for MS24F for several crew members and 2 hours for WO 81725834 for other crew members. Respond to the following: a. Explain what specific services were provided in support of MS24A and provide the referenced “Storm Sheet”. b. Explain what specific services were performed in support of WO 81725834. Include in the response an explanation of what the timesheet’s reference to “Rain Day” represents. If applicable, identify if the vendor’s contract permits it to bill for a minimum number of hours when services cannot be performed due to rain. If applicable, cite the contract provisions.
  10. Page 10 of 23

    EOE-288. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 127-192. The Company reported an incremental charge of $493,876 for the D&D Power LLC vendor. Referring to p. 147, explain what “Cleanup Work” and “Storm Duty” represents within the referenced Eversource Contractor Storm Daily Time & Work Report (timesheet) and explain why these resources were not released at 3:00pm in lieu of billing for an additional six hours. Additionally, discuss if the information contained within the timesheet identifies the individual crew members responsible for each work assignment. EOE-289. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 193-194. The Company reported an incremental charge of $11,903 for the Distinctive Gardens & Tree Care LLC vendor. Respond to the following: a. Cite the applicable contract and pricing schedule, inclusive of the provision that permits the Per Diem charge. b. Identify if the vendor had access to Company provided meals on April 4, 2024, at the Torrington AWC. If the vendor had access to meals, explain why they were permitted to bill a Per Diem charge. c. Provide the omitted Eversource Connecticut Emergency Restoration Tree Contractor Work Location report and explain if the crew performed remediation activities or were held on standby. d. Explain why the vendor was permitted to bill for two mini excavators. As part of the response, provide documentation demonstrating the Company’s prior approval of this equipment. e. Referring to p. 194, explain why the vendor was permitted to only bill for 6 hours at an ST rate when they commenced billing at 9AM, resulting in 7.5 hours at an ST rate. (i.e., response to EOE-128) As part of the response, please identify the incremental impact of vendor’s billing for 6 hours at an ST rate versus 7.5 hours at an ST rate. EOE-290. (MS24F-VENDOR-FUEL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, p. 215. The Company reported an incremental charge of $37,930 for the East River Energy vendor. Respond to the following: a. Explain why the consolidated invoice does not agree with the amount requested for recovery. Specifically, the invoice identifies a charge of $36,687 (p.215) versus the requested amount of $37,930. b. Cite the applicable contract and pricing schedule, inclusive of the billed hourly labor charge. c. Provide documentation to support the of the per gallon charge for diesel fuel, including any industry standards. Furthermore, cite to the applicable contract provision which permits the vendor to charge for diesel at that cost. If the contract has not yet been provided, please provide.

As listed on the current system

Interrogs from PURA/EOE to CL&P 302 thru 321-Issued 09/22/2026 [26-05-10]

This filing on the current system (opens in a new tab)