Interrogatories

To CL&P, questions 288 thru 301

Files1

  1. Page 14 of 23

    p. 2292 which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. d. Referring to pp. 208-211, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. EOE-301. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 212-215. The Company reported an incremental charge of $47,615 for the Haugland Energy Group vendor. Respond to the following: a. Confirm that the difference between the reported recovery amount ($47,615) and the invoice amount ($48,408) is attributed to the “car vs. pole” activity referenced on p. 215. If not confirmed, explain the difference. b. Referring to p. 215, explain if the Eversource Contractor Storm Daily Time & Work Report was fully completed as required by the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. If not fully completed, explain why the Eversource reviewer did not require the information to be completed prior to approval. c. Provide an unlocked Excel spreadsheet supporting the calculation of the “car vs. pole” and explain how the Company was able to derive the amount based on the missing information (i.e., boxes 24 and 25) contained within the Eversource Contractor Storm Daily Time & Work Report on p. 215. EOE-302. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 216-227. The Company reported an incremental charge of $312,425 for the Haugland Energy Group vendor. Referring to pp. 219-221, explain how each signed Eversource Contractor Storm Mobilization & Demobilization Time Report identified the vendor’s start time of 1600 and end time of 1800 but included a total billing of nine hours for April 3, 2024. As part of the response, provide an unlocked Excel spreadsheet supporting the total amount of overbilling that resulted from the overstatement. EOE-303. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 228-229. The Company reported an incremental charge of $5,968 for the Henkels & McCoy vendor. The charge related to repairs resulting from “truck ruts” resulting from Eversource Storm Work that appears to be at a residential address (p. 229). Explain how Eversource vehicles could have incurred damage to the referenced
  2. Page 15 of 23

    property requiring the $5,968 of repairs (i.e., over 1600 square feet of loam/seed). Furthermore, explain why the Eversource vehicles needed to drive on the property and identify the proximity of the damage to the public road. EOE-304. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 246-259. The Company reported an incremental charge of $231,039 for the IB Abel Inc. vendor. Respond to the following: a. Referring to p. 250, confirm that the Company included a charge applicable to “car vs pole”. If confirmed, identify the total impact of this activity and explain why this amount was not eliminated from the storm recovery request. As part of the response, please provide an unlocked Excel spreadsheet supporting applicable calculations. b. Referring to OCC-044, Att.2 (Confidential), pp. 2725-2752, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 2732). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. c. Referring to pp. 249-251, 253, provide an unlocked Excel spreadsheet calculating the billed equipment costs applicable to the reported standby activity. d. Referring to p. 254, explain why the vendor identified approximately four hours of standby (i.e., boxes 23-25: 1635-2030) but billed that time as Work (box 12). As part of the response, provide an unlocked Excel spreadsheet detailing the difference in pricing (i.e., labor and equipment) had these hours been reported as standby. e. Referring to p. 254, explain why the vendor was permitted to bill for two hours to “Eat and bed down” (i.e., boxes 23-25). As part of the response, provide an unlocked Excel spreadsheet detailing the incremental amount incurred for the vendor for the two hours (i.e., labor and equipment). EOE-305. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 280-281. The Company reported an incremental charge of $35,967 for the KTI Utility Construction & Maintenance LLC vendor. Respond to the following: a. Identify the total amount of charges applicable to standby activity. b. Explain the process for when the vendor would be mobilized to perform pole replacements or repairs. As part of the response, explain why the vendor would be mobilized prior to the worksite being properly secured. c. For each standby charge, explain the circumstances for which the vendor was engaged prior to worksite being secured.
  3. Page 16 of 23

    d. Referring to the applicable Event Level Matrix (ELM) within EOE-010, Att.5, pp. 17-19, identify where the civil crews are identified for staging purposes. If not included in referenced pages, cite the applicable pages. EOE-306. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP6A-8. The Company reported 126 incremental charges (Excel Rows 198323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Explain why every Weekly Operations Summary report (e.g., pp. 283, 287, 291, etc.) included a ‘Time Start’ and a ‘Time Finish’ of 7:00AM and 4:00PM, respectively, which does not agree with the hours billed. As part of the response, explain how the Company was able to validate the accuracy of the hours billed and provide supporting documentation available to the reviewer at the time verifying that the hours were correctly billed for each invoice (i.e., crew). Additionally, provide an unlocked Excel spreadsheet listing each invoice, detailing the crew’s start and end times, identifying the billable amounts, and identifying if supporting documentation (i.e., available to the arborist at the time of the review) is being provided. EOE-307. (MS24F-VENDOR-TREE-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. The Company was billed for atypical equipment including extra chainsaws, chipper disks, chip trucks, log trucks, and a backyard lift. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced equipment, the amounts billed for the applicable equipment, and the justification for why the equipment was necessary for storm remediation purposes. Additionally, please provide documentation of prior authorization for each charge. EOE-308. (MS24F-VENDOR-TREE-EXPENSE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Referring to Excel Row 290, explain how the “Billable Expense” referenced in the invoice is applicable to the MS24F event when each of the supporting invoices (i.e., CLP-6A-7. pp. 181-186) were dated as of March 2024, prior to the event. EOE-309. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP6A-8. The Company reported 126 incremental charges (Excel Rows 198323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Referring to Excel Row 307, explain how the referenced activity, which occurred on April 9, 2024 (several days after demobilization), related to the MS24F event. As part of the response, explain why a 2023 Tree
  4. Page 17 of 23

    Removals report was provided in lieu of the Emergency Restoration Tree Contractor Work Location report and explain why that report listed activity that appears to be routine vegetation removals. If applicable, please provide additional documentation demonstrating the applicability of the activity to the MS24F event. EOE-310. (MS24F-VENDOR-TREE-DELAYED REMEDIATION) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. The Company was billed for remediation between the dates of April 10, 2024, and August 13, 2024, when the storm event was demobilized on April 4, 2024. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced dates, the amounts billed for each date, and, as applicable, provide documentation demonstrating that the remediation was both necessary and directly applicable to the MS24F event. To the extent that errors are identified, please reference each error in the Excel spreadsheet. EOE-311. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-8, pp. 68-136. The Company reported three incremental charges in the combined amount of $137,422 for the Lucas Tree Experts vendor. Respond to the following: a. Referring to pp. 73, 75, 77, and 79, explain if the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were completed in accordance with the Company’s requirements. As part of the response, identify if generic responses are indicative of standby activity. b. Referring to pp. 76, 82, 88, 90, 100, 106, 108, 112, 116, 123, 127, 129, 131, 133, and 135, explain why the vendor was not required to bill at ST rates through 1630. Additionally, please provide an unlocked Excel spreadsheet detailing each timesheet referenced above and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charges. EOE-312. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-8, pp. 194-229. The Company reported an incremental charge of $271,950 for the McPhee Electric LTD vendor. Respond to the following: a. Referring to p. 205, explain why each of the crews were permitted to bill for four hours of demobilization travel time without any documentation to support applicable travel. As part of the response, identify the beginning and ending locations, distance between the two locations, original estimated travel time, modified estimated travel time applying
  5. Page 18 of 23

    1.3 factor, and the difference. Additionally, identify the incremental cost associated with the derived difference. b. Referring to p. 205, explain why the vendor billed equipment during standby on April 5, 2024. As part of the response, identify the cost of equipment billed during the standby hours. c. Referring to pp. 195, identify if the vendor had access to Company provided meals for any period during their assignment. If the vendor had access, explain why they were paid for meals for the entire duration of their support. EOE-313. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 11-23. The Company reported an incremental charge of $756,614 for the Michels Power vendor. Respond to the following: a. Referring to pp. 13-14, explain why the billed equipment rates exceed the contractual rates included within OCC-044, Att.2 (Confidential), pp. 4391-4395. As part of the response, provide an unlocked Excel spreadsheet detailing the equipment billed via the invoice to equipment rates provided within the contract and identify the amount of overbill. b. Referring to pp. 17, 19, 21, and 23, explain if the Eversource Contractor Storm Daily Time & Work Report was completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter information within boxes 24 (Event Start Time) and 25 (Event End Time) prior to the Company’s approval. EOE-314. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 24-38. The Company reported two incremental charges in the combined amount of $142,456 for the MTV Solutions Inc. vendor. Respond to the following: a. Referring to pp. 25-26, 29, 32, and 35, explain why the vendor was permitted a higher rate for the Digger Derrick than permitted within the pricing schedule provided at OCC-044, Att.2 (Confidential). As part of the response, identify the incremental impact of the higher rate. b. Referring to pp. 24-38, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on April 8, 2024 (several days after demobilization) in lieu of Company personnel.
  6. Page 19 of 23

    EOE-315. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 39-44. The Company reported an incremental charge of $3,413 for the New England Flagger Services vendor. Certain supporting documents (i.e., pp. 41, 43) referenced “Rain Day”. Explain if any of the charges related to cancellations of previously scheduled assignments in lieu of actual flagging services. If applicable to cancellations, identify the specific activity and total incremental amount. EOE-316. (MS24F-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 132-169. The Company reported an incremental charge of $96,464 for the Pasquariello Electric Corp vendor. Respond to the following: a. Comparing p. 132 with pp. 133-142, explain why the vendor billed all activity at DT rates when each of the Eversource Contractor Storm Daily Time & Work Reports reported both standby and travel time. As part of the response, provide an unlocked Excel spreadsheet calculating the excess amount billed using the Travel/Standby response rate included in the pricing schedule provided at Confidential EOE-014, Att.2, p. 2094. b. Comparing p. 132 with pp. 133-142, explain why the vendor billed for equipment during standby. As part of the response, provide an unlocked Excel spreadsheet calculating the total incremental charge for the equipment billed during standby. c. Referring to pp. 133-142, explain if the Eversource Contractor Storm Daily Time & Work Reports were completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter the required information prior to the Company’s approval. EOE-317. (MS24F-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 170-174. The Company reported three incremental charges in the combined amount of $43,802 for the Paul Gregorys LLC and Perk on Main LLC vendors. Provide an unlocked Excel spreadsheet detailing the total all-in costs for each meal (i.e., breakfast, lunch, and dinner) and provide a comparison of the cost to the maximum meal caps outlined within Eversource’s restaurant meal policy. EOE-318. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 187-201. The Company reported two incremental charges in the combined amount of $45,869 for the Riggs Distler & Company Inc vendor. Respond to the following: a. Referring to p. 189, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on May 29, 2024, in lieu of Company personnel. Additionally, provide
  7. Page 20 of 23

    contemporaneous documentation supporting that the crossarm on pole 2264 was damaged by the MS24F event. b. Comparing p. 199 with p. 200, explain why the vendor billed for equipment during standby. As part of the response, provide an unlocked Excel spreadsheet calculating the total incremental charge for the equipment billed during standby. c. Referring to pp. 200-201, explain if the Eversource Contractor Storm Daily Time & Work Reports were completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter the required information prior to the Company’s approval. EOE-319. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-10, pp. 1-6. The Company reported an incremental charge of $58,786 for the South Norwalk Electric and Water vendor. Respond to the following: a. Confirm that the vendor is a mutual aid provider who is not subject to a contract or pricing schedule. Additionally, confirm that the OH&B charge refers to a grandfathered overhead charge. If not confirmed, provide details regarding the vendor, the contract, and the OH&B charge. Please note any changes in process since the Company’s response to EOE615 in Docket No. 25-12-13. b. Identify if the Company has provided mutual aid support for the South Norwalk Electric and Water vendor since the last rate case. If support has been provided, provide a detailed listing of support provided, include the dates of such support, along with a copy of the most recent invoice. EOE-320. (MS24F-VENDOR-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-10, pp. 21-35. The Company reported 14 incremental charges in the combined amount of $144,942 for the Sunbelt Rentals Inc. vendor. Respond to the following: a. Provide copies of any service level agreements (SLAs) between the Company and the vendor detailing the amount of time permitted for the vendor to provide a generator upon request. If SLAs do not exist, explain why. b. Provide a detailed listing of each generator rented, along with the corresponding costs (i.e., rental, labor, setup, etc.) and identify generators that were not utilized in support of storm response. For any generators not used, explain why the Company rented the generators and identify if there were any specific outages that warranted the rental of the generators that were resolved before usage.
  8. Page 21 of 23

    c. Referring to pp. 31-32, the two invoices detailed outages from April 6, 2024, through April 8, 2024. Provide documentation to support that the underlying outages were the result of the MS24F storm event. EOE-321. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-10 through Exhibit ACCT-2 CLP-6A-11. The Company reported 17 incremental charges in the combined amount of $56,705 for the Tennett Tree Service Inc. vendor. Respond to the following: a. The Company was billed for atypical equipment including extra chainsaws, chippers, chip trucks, and cranes (refer to the 15 invoices referenced in Rows 373-378, 380-387, and 389). Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced equipment, the amounts billed for the applicable equipment, and the justification for why the equipment was necessary for storm remediation purposes. Additionally, please provide evidence of prior authorization for each charge. If prior authorization was not required, explain why. b. Explain how the Company was able to validate the accuracy of the hours billed when most of the timesheets were missing all of the hours worked (refer to the nine invoices referenced in Rows 373-377, 379-380, 382, and 389). EOE-322. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-11, pp. 83-95. The Company reported an incremental charge of $7,027 for the Town of Greenwich for activity on April 3, 2024 (prior to the storm onset). The incremental cost was supported by an invoice (p. 83) and job forms that identified unrelated work order numbers (i.e., WO# 81849159), several charges for standby, and multiple cancellations. Explain how each of the charges were applicable to the MS24F event. As part of the response, identify if the cancellation charges were related to the cancellation of previously scheduled activity and if the hours represented a minimum number due to cancellation. If applicable, cite the contract provisions that permit the billing of hours for the cancellations. EOE-323. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-11, pp. 105-111. The Company reported an incremental charge of $2,827 for the Town of Lebanon for activity that spanned April 5, 2024 through April 12, 2024, with several charges applying to cancellations and no references to the MS24F011 work order number. Explain how each of the charges were applicable to the MS24F event, provide contemporaneous supporting documentation, and explain why each of the cancellations were referenced as “w/o 24 hr notice”. EOE-324. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-11, p. 113. The Company reported an incremental charge of $1,520 for the Town of Portland for cancellation
  9. Page 22 of 23

    activity on April 11, 2024, approximately one week after the MS24F event. Explain how the cancellation charges were applicable to the MS24F event and provide supporting documentation. EOE-325. (MS24F-VENDOR-ACCRUAL) Refer to Exhibit ACCT-2 CLP-6. The Company reported an incremental charge of $13,914 for a Tree Accrual (Row 408). Explain why the Company is reporting an accrual for Tree costs that occurred over two years ago and provide documentation supporting the amount. EOE-326. (MS24F-LABOR/MEALS) Refer to Exhibit ACCT-2 CLP-6, Labor by Empl. Title tab. Provide documentation to support the validity of the following Meal reimbursements (stipends). As part of the response, please provide relevant calculations, union agreement citations, invoices, or other supporting documents and whether the employee received a Company provided meal or not. a. Row 437, Chief/Top Line Mechanic, $100 b. Row 1065, Lead Line Mechanic, $100 c. Row 1661, Line Helper, $150 d. Row 2189, Line Helper, $100 e. Row 3040, Splicer/Cable Splicer Helper, $100 EOE-327. (MS24F-P-CARDS) Refer to Exhibit ACCT-2 CLP-6, P-Card tab. Provide documentation to support the validity of the following sampled P-Card expenses. As part of the response, please provide a description of the purchase, relevant invoices, applicable calculations, and other supporting documents demonstrating the necessity and applicability of each charge to the MS2FA event. a. Row 21, Aziagos Restaurant, Meals, $9,230 b. Row 44, Coffees Country Mar, Meals, $15,273 c. Row 191, Nicks Pizza, Meals, $2,195 d. Row 193, Outback, Meals, $500 e. Row 211, Red Fox Restaurant, Meals, $5,833 f. Row 339, Vernon Pizza, Meals, $465 EOE-328. (MS24F-EMPLOYEE EXPENSE REIMB) Refer to Exhibit ACCT-2 CLP-6, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled employee expenses. As part of the response, please provide a description of the purchase, relevant invoices, applicable calculations, and other supporting documents demonstrating the necessity and applicability of each cost to the MS24F event. a. Row 184, Employee Reimbursements, $775 b. Row 213, Employee Reimbursements, $475
  10. Page 23 of 23

    c. Row 229, Employee Reimbursements, $536 d. Row 247, Employee Reimbursements, $886 e. Row 268, Employee Reimbursements, $259 EOE-329. (MS24F-EMPLOYEE EXPENSE MILEAGE) Refer to Exhibit ACCT-2 CLP6, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled mileage expenses. As part of the response, please provide the mileage logs and other supporting documents that were available to the Eversource reviewer at the time of approval demonstrating the applicability of each cost to the MS24F event, as well as the netting of the employee’s normal commute. a. Row 28, $126 b. Row 47, $110 c. Row 104, $189 d. Row 105, $63 e. Row 127, $169 f. Row 137, $136 g. Row 167, $110 h. Row 171, $173

As listed on the current system

Interrogs from PURA/EOE to CL&P 288 thru 301-Issued 09/22/2026 [26-05-10]