Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 290

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages

Scanned pages and machine-read text of EOE-290 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-290 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 2 REDACTED Page 1 of 1 REDACTED
    Fuel Cost @Fuel Taxes (State,Total Cost,Hours @
    DateLocationHotel AddressCityStateGallons[redacted] /gallonFederal, Lust & Spill)Fuel[redacted] /Hour
    4/4/2024ERE - Eversource - Cromwell CT Courtyard Marriott4 Sebethe DrCromwellCT[redacted][redacted]54.11375.27[redacted]
    4/4/2024ERE - Eversource - Cromwell CT Courtyard Marriott4 Sebethe DrCromwellCT[redacted][redacted]--[redacted]
    4/4/2024ERE-Eversource - Southbury Heritage Hotel522 Heritage RoadSouthburyCT[redacted][redacted]267.711,856.81[redacted]
    4/4/2024ERE-Eversource - Trumbull Marriott180 Hawley LnTrumbullCT[redacted][redacted]63.75442.20[redacted]
    4/4/2024ERE-Eversource - Norwalk Inn99 East AvenueNorwalkCT[redacted][redacted]24.72171.42[redacted]
    4/4/2024ERE-Eversource - Hampton Inn Norwich154 salem TurnpikeNorwichCT[redacted][redacted]63.98443.74[redacted]
    4/4/2024ERE-Eversource - Hampton Inn Norwich10 Laura BoulevardNorwichCT[redacted][redacted]175.011,213.85[redacted]
    4/4/2024ERE-Eversource - Homewood Suites S Glastonbury65 Glastonbury BlvdGlastonburyCT[redacted][redacted]146.431,015.66[redacted]
    4/4/2024ERE-Eversource - Hilton S Glastonbury85 Glastonbury BlvdGlastonburyCT[redacted][redacted]86.61600.75[redacted]
    4/4/2024ERE-Eversource - LaKota Oaks Center Norwalk32 Weed AveNorwalkCT[redacted][redacted]271.791,885.12[redacted]
    4/4/2024ERE - Eversource - Hilton Hartford315 Trumball StreetHartfordCT[redacted][redacted]--[redacted]
    4/4/2024ERE- Eversource - Southbury Wyndham1284 Southington RoadSouthburyCT[redacted][redacted]169.521,175.76[redacted]
    Grand Total, Fuel:$ 9,180.57[redacted]Total Hours
    [redacted]Rate per Hour
    $ 25,863.75Total Hourly Fees
    $ 1,642.35CT Sales Tax
    $ 27,506.10Grand Total Labor
    $ 36,686.67Invoice Total

Scanned pages and machine-read text of EOE-290 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 22 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 22 of 52 12. PARTIAL COMPLETION AND ACCEPTANCE. If at any time prior to Acceptance as referred to in Article 11 "REQUIREMENTS FOR ACCEPTANCE", any portion of the Work has been completed and if Owner determines that such portion of the Work is of value, Owner will, if applicable, issue to Contractor a certificate of partial completion. Upon the issuance of such certificate, or at any time thereafter, Owner may take over and use the portion of the Work described in such certificate and may exclude Contractor therefrom. The issuance of a certificate of partial completion will not release the Contractor or its sureties from any obligations under the Agreement unless such prior use delays the Work or increases its cost. In this event, the Contractor will be entitled to extra compensation or extension of time, or both, as Owner may determine. 13. SUSPENSION OF WORK. Owner may at any time suspend the Work or any part thereof upon oral notice to Contractor. Such oral notice shall be confirmed in writing by Owner. The Work shall be resumed by Contractor promptly after written notice from Owner to Contractor to do so. Owner will make payment for all Work completed and accepted by Owner as of the suspension date, in accordance with the agreed payment rates and milestones. 14. TERMINATION FOR CAUSE. 14.1 Without prejudice to any other right or remedy Owner may have under the Contract, at law and/or in equity and upon providing written notice of such termination to Contractor, Owner may terminate the Agreement without any liability being owed thereby by Owner to Contractor, in the event of the occurrence of any of the following: 14.1.1 insolvency of Contractor; 14.1.2 filing of a voluntary petition in bankruptcy by Contractor; 14.1.3 filing of an involuntary petition in bankruptcy against Contractor; 14.1.4 appointment of a receiver or trustee for Contractor; 14.1.5 execution by Contractor of an assignment or any general assignment (other than an assignment undertaken in connection with a financing) for the benefit of creditors; 14.1.6 commencement of any legal proceeding against Contractor that, in Owner's opinion, may interfere with Contractor's ability to perform in accordance with the Contract; or 14.1.7 Contractor consolidates with, or merges with or into, or transfers all or substantially all of its assets to, another entity and/or sells, assigns or otherwise transfers the Contract; in each case without Owner's advance written consent. 14.2 If Contractor fails to diligently perform the Work in accordance with the Agreement or if Contractor otherwise breaches any of the terms of the Agreement, in addition to Owner rights set forth in Section 14.1 above and Section 25.7 regarding safety or environmental violations, Owner shall have the right without any liability being owed thereby by Owner to Contractor, upon giving Contractor written notice of default and allowing Contractor a period of five (5) Business Days or such other period as may be agreed upon by the parties or as may be determined by Owner to be necessitated by exigent circumstances to remedy such deficiency. In the event such default is not completely remedied, Owner may cancel the Agreement in whole or in part upon giving written notice to Contractor; and the Work itself or to have the Work completed by another entity, with any additional cost associated therewith being the liability of the Contractor. 14.3 Upon receipt of any notice of termination as described in Section 14.1 or Section 14.2 above, Contractor shall immediately cease Work, commence demobilization of any affected Contractor Resources, and, if requested by Owner, promptly remove from the Site all materials and equipment which have not been either fully or partially paid for by Owner. Contractor shall promptly settle the liabilities and claims arising out of the termination of subcontracts and orders. 14.4 Contractor shall maintain a written, detailed inventory of all equipment and materials in storage at the Site(s), in route to the Site(s), in storage or manufactured away from the Site(s), and on order GTCs - Utility Services Page 12 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  2. Scan of page 23 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 23 of 52 from its suppliers and Subcontractors. Upon Owner's written request and to the extent that title has not transferred earlier pursuant to Article 26 "DELIVERY, TITLE AND RISK OF LOSS TO EQUIPMENT AND MATERIALS," Contractor shall promptly transfer title and deliver to Owner completed or partially completed Work and/or contract rights of Contractor relating to the Work, and Contractor shall execute and deliver such documents and take all such actions as Owner may require for the purpose of vesting in Owner such ownership, rights and benefits of Contractor with respect to the Work. 14.5 In the event any termination under this Article 14 is subsequently determined pursuant to the dispute resolution process set forth in Article 39 "DISPUTE RESOLUTION; NEGOTIATION; MEDIATION; ARBITRATION", to have been made without cause, such termination shall be deemed a Termination for Convenience under Article 15 hereof. 15. TERMINATION FOR CONVENIENCE. 15.1 Owner shall have the right to terminate and/or cancel the Agreement or all or any portion of the Work for any reason, or for Owner's convenience, and at its sole and exclusive discretion, upon at least one (1) day's prior written notice to Contractor specifying when such termination becomes effective. Upon such effective date, Contractor shall immediately cease Work, commence demobilization of any affected Contractor Resources, and, if requested by Owner, promptly remove from the Site all materials and equipment which have not been either fully or partially paid for by Owner. Contractor shall promptly settle the liabilities and claims arising out of the termination of subcontracts and orders and shall use its best efforts to minimize any associated costs. After termination, Contractor shall cooperate with Owner to the fullest extent for the purpose of allowing Owner or its designee to fully perform all functions previously performed by Contractor under the Agreement. 15.2 Upon Owner's request and to the extent that title has not transferred earlier pursuant to Article 26, Contractor shall promptly transfer title and deliver to Owner completed or partially completed Work (including Information or other work product related to the Work) and/or contract rights of Contractor relating to the Work for which Owner has made payment, and Contractor shall execute and deliver such documents and take all such actions as Owner may require for the purpose of vesting in Owner such ownership, rights and benefits of Contractor with respect to the Work. 15.3 In the event of a termination under this Article 15, except as otherwise expressly agreed to in writing by the parties, Owner shall pay for the Work completed in compliance with the Agreement through the effective date of termination. 16. OWNER'S REPRESENTATIVE STATUS. Owner's Representative will perform inspection of the Work and has the authority to stop the Work whenever such stoppage may be necessary to insure the proper execution of the Agreement. He/she also has authority to reject any and all Work that does not conform to the Agreement and to decide questions that arise in the execution of the Work. Owner's Representative will make decisions in writing within a reasonable time on all claims of Contractor and on all other matters relating to the execution and progress of the Work or interpretation of the Agreement documents. 17. CONTRACTOR'S SUPERVISORY DUTIES. 17.1 Prior to commencing any Work, Contractor shall identify to Owner a Contractor's Representative authorized to receive all communications from Owner, provide all approvals or authorizations required from Contractor and act on behalf of Contractor in all matters concerning the Work. Owner reserves the right to require the removal and replacement of Contractor's Representative for any reason. GTCs - Utility Services Page 13 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  3. Scan of page 24 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 24 of 52 17.2 Contractor shall efficiently and continuously supervise its Contractor Resources required to complete the Work. Contractor shall be fully liable for the acts and omissions of Contractor Resources. Contractor shall provide an adequate and competent supervisory staff throughout the course of the Work. 17.3 Contractor shall at all times enforce strict discipline and good order among Contractor Resources, and shall not employ any unfit person or anyone not skilled in the tasks assigned under the Agreement. Owner shall have the right to request Contractor to remove any person determined by Owner to be unqualified or unfit to perform the Work. 17.4 In the event Contractor Resources are given access to any of Owner's computer systems and equipment or Owner Information (including, without limitation, Owner's Confidential Information) Contractor agrees not to use Owner's systems or equipment or such Owner Information for any purposes other than that contemplated in the Agreement. Contractor further agrees to keep confidential any Information it obtains in the course of performing Work under this Agreement and to utilize data security systems approved by Owner and compliant with Owner's IT Security Requirements and applicable law. Contractor agrees to cause its Contractor Resources to comply with applicable provisions of Owner's IT Security Requirements and policies and applicable laws and regulation. 17.5 For any Services to be performed on any Site, within five (5) Business Days of Owner's request, Contractor shall provide to Owner, the names, classifications and job locations of Contractor Resources. Owner shall have the right to request that Contractor remove and replace (at no cost to Owner) any person determined by Owner in its discretion to be unqualified or unfit to perform the Work, in which case Contractor shall do so (including reassignment to work other than for Owner and/or Owner affiliates to the extent allowable under Contractor's labor agreement(s) and Law). Owner's requests and/or reviews concerning any Contractor Resources shall not be construed in any manner as creating any employment, contractual or other relationship between Owner and such person, or otherwise granting Owner control over such person and/or the performance of the related Work. 17.6 RESERVED. 17.7 THIS SECTION IS APPLICABLE ONLY TO DISTRIBUTION OR TRANSMISSION SERVICES ON SITES. In addition to the requirements of Section 17.5, Contractor shall provide to Owner, the names, classifications and job locations of Contractor Resources that were former employees of Owner or any of its affiliates, that Contractor desires to assign to provide Services on behalf of Contractor and/or any Subcontractor at least three (3) business days prior to those Contractor Resources performing any such Services. 18. INDEPENDENT CONTRACTOR. Contractor Resources shall perform all Work as independent contractors, and shall not be deemed to be the employees or agents of Owner for any purpose whatsoever. 19. SUBCONTRACTING. 19.1 Contractor shall provide Owner with notice of any Work that it desires to subcontract along with a list of proposed Subcontractors. Owner shall have the right to refuse any proposed Subcontractor and Contractor shall not enter into any such subcontract with any such Subcontractor as to which Owner has made an objection. Contractor shall not make any substitution of proposed Subcontractors prior to or during the term of this Agreement without prior written approval from Owner. Neither Contractor nor any Subcontractor shall assign any Work under this Agreement without the written consent of Owner. 19.2 Irrespective of Owner's consent or the terms of any agreement between Contractor and any Subcontractor, Contractor shall (a) be fully responsible to Owner for acts and omissions of GTCs - Utility Services Page 14 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  4. Scan of page 25 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    Contractor Resources; (b) remain fully responsible for the full and faithful performance of the Contract; (c) direct and control the activities of all Contractor Resources; (d) remain fully bound by all terms and conditions of the Agreement including all requirements for indemnity and warranty. Contractor shall include all Agreement provisions related to any subcontracted Work in the written agreement between Contractor and such Subcontractor for such Work, including warranty, insurance, audit and indemnity provisions. Contractor shall be responsible for the satisfaction of all contractual and legal obligations to such subcontractor and supplier. 19.3 Owner shall have the right to request that Contractor terminate any subcontract and remove any Contractor Resources determined by Owner, in its sole discretion, to be unqualified or unfit to perform the Work or any portion thereof. 19.4 Nothing contained in the Agreement documents shall create any direct contractual relation between any Subcontractor and Owner. 19.5 Contractor shall not allow access to the Site(s) or any portion thereof under the control of the Contractor by any person not acting under the direction and control of Contractor, other than Owner, the Owner's Representative, other authorized representatives of Owner, other contractors engaged by Owner and governmental authorities. 19.6 RESERVED. 20. COMPLIANCE. 20.1 Contractor and Contractor Resources shall comply with all laws, regulations and requirements applicable to the Work, including international, federal, state and local laws, and the laws applicable to any location where any Work is to be performed, constructed, manufactured, stored or delivered. Such compliance shall include environmental, human rights, labor, employment, non-discrimination and anti-corruption laws (including the Foreign Corrupt Practices Act), and all applicable maritime, customs, export, and import laws, requirements, rules and regulations, and the applicable laws, requirements, rules and regulations of the country of origin or destination, any intermediate country, and the United States in the performance of the Work. The country of any location where Work is to be performed, whether it is the country of origin or destination or any intermediate country must be a member of the International Labour Organization (ILO). The costs of such compliance with the foregoing requirements shall be borne exclusively by Contractor and Contractor shall defend, indemnify, and hold Owner harmless from any liabilities, damages, fines, penalties and costs arising from Contractor's noncompliance with this Article 20. 20.2 Contractor and Contractor Resources shall comply with Owner's requirements, procedures, and policies including without limitation those found in the Exhibits hereto, and as additionally incorporated by reference in the Order or Agreement documents and/or issued in connection with the Work and as in effect from time to time. 20.3 THIS SECTION IS APPLICABLE TO WORK PERFORMED PURSUANT TO A FEDERAL GOVERNMENT CONTRACT OR FEDERALLY FUNDED CONTRACT: In connection with its performance of Work pursuant to a federal government contract or federally funded contract, in addition to all other legal compliance obligations, Contractor shall comply with all laws and regulations specific to and applicable to such contracts, including without limitation, regulations and laws regarding employment and non-discrimination, Executive Order 11246 and the regulations issued pursuant thereto (generally Part 60-1 of Title 41 of the Code of Federal Regulations), unless exempted by said regulations. **The Equal Opportunity Clause set forth in 41 CFR Section 60 1.4(a)), is hereby incorporated by reference. This contractor and subcontractor shall abide by the requirements of 41 CFR 60-300.5(a). This regulation prohibits discrimination against qualified protected veterans, and requires affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified protected veterans. This contractor and subcontractor shall abide by the requirements of 41CFR 60-741.5(a). This regulation prohibits discrimination against qualified individuals on the basis of disability, and** GTCs - Utility Services Page 15 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  5. Scan of page 26 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 26 of 52 requires affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified individuals with disabilities. Contractor and all of its Subcontractors shall comply with the provisions and regulations pertaining to nondiscrimination and affirmative action in employment (41 CFR Sections 60 1.4, 1.40, 1.41 and 1.42), and the filing of Standard Form 100 (EEO 1). Contractor certifies, in accordance with the requirements of 41 CFR Section 60 1.8), that its facilities for employees are not segregated. Further, Contractor will comply with the provisions of (unless exempted from) the notice posting requirements of Executive Order 13496 set forth in 29 CFR Part 471, Appendix A to subpart A, which is incorporated herein by reference. 21. SITE REQUIREMENTS. 21.1 For all Work to be performed at a Site, Contractor Resources shall comply with Owner's requirements, procedures, and policies and training requirements, including those relating to safety, security, environmental practices and access authorization, currently in effect, copies of which are available upon request. 21.2 Owner shall have the right to place its forces or any other contractor's forces at the Site to perform work not included in the Agreement. All Work performed by Contractor shall be undertaken in full cooperation with Owner's personnel or the personnel of other contractors at the Site, in order to achieve the least possible interference with the continuity and efficiency of all Owner's interests or activities at the Site. Contractor's forces shall work in harmony with all such other forces, and in accordance with Owner's schedules. 21.3 Contractor represents that prior to commencing Work it has advised its forces of Owner's requirements, procedures and policies; satisfied the applicable training requirements; and conducted such inspections and made such inquiries as it deems necessary concerning the conditions at each Site which might affect Contractor's execution and completion of the Work. Contractor agrees and acknowledges that Information provided by Owner concerning Site conditions has been used for reference only and shall not be claimed to relieve Contractor from its obligation to independently assess the requirements of the Work. 21.4 Contractor shall plan and execute the Work in such a way to avoid any unscheduled interruption of utility service. 21.5 The Contractor shall use only the established roads for the performance of the Work, and any such temporary roads approved by Owner and necessary for the Work. When necessary to cross curbing, sidewalks or similar features, they must be properly protected, and if damaged, shall be restored to previous condition at Contractor's expense. 22. INCIDENTAL MATERIALS AND CONSUMABLES. Contractor, at its sole expense and prior to delivering consumables or materials incidental to performance of Work at the Site, shall inspect or test such consumables or materials to ensure compliance with the Agreement, including the Specifications. GTCs - Utility Services Page 16 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  6. Scan of page 27 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 27 of 52 23. HAZARDOUS MATERIALS. 23.1 Contractor shall provide to Owner's Representative or designee a written description of and purpose for the use of any products or processes in the Work that are Hazardous Materials or may result in the generation of Hazardous Materials. Such written submission must identify, prior to the start of the Work and to the satisfaction of Owner's Representative or designee, the practices used to minimize such generation and demonstrate that it has taken all possible steps to eliminate or reduce to the maximum extent possible such generation. 23.2 Contractor shall ensure the environmentally responsible management of any Hazardous Materials included in or resulting from the Work. In performing the Work, Contractor shall comply fully with all Environmental Laws. Contractor is solely responsible for the proper identification and labeling, documentation, handling, storage, minimization, processing and recycling of any and all such Hazardous Materials. Unless otherwise indicated, Contractor shall be responsible for manifesting, transporting and removing from Site any and all Hazardous Materials. Contractor shall be liable for any and all costs incurred by Owner, at Owner's sole discretion, for the storage, handling, processing, removal and disposal thereof. 23.3 Contractor shall defend and indemnify Owner, its parent, affiliates and its and their employees, agents, officers and directors and hold it and them harmless from any and all damages, claims, demands, or suits of any kind for injury to persons, including death, and damage to property suffered by any person (including Contractor Resources) or by any firm or corporation arising out of, or claimed to have arisen out of, any acts or omissions of Contractor and Contractor Resources related to or involving Hazardous Materials generated during the course of the Work or brought to the Site by the Contractor or Contractor Resources. This indemnification shall include any liability or claims related to the storage, handling, processing, release, or removal from Site of any such Hazardous Materials by Contractor, Contractor Resources, transporters, recyclers, or any treatment, storage or disposal facility used by Contractor or such other persons. Further, this indemnification shall include liability for any and all costs or penalties (including legal, attorney, administrative, or regulatory fees and expenses) incurred or imposed as a result of actions pursued by federal, state or local governments or agencies related, in any way whatsoever, to the management of such Hazardous Materials. 23.4 Contractor agrees to use the EPA identification number assigned to the Site at which Contractor is working. The use of such EPA number shall not constitute assumption of environmental liability by Owner. In the event Owner has no EPA number for the Site in question, Contractor shall apply for a temporary number. 23.5 No chemical consumable product may be delivered to any Site without prior written approval by the Owner's Representative or designee in the manner provided in the first paragraph of this Article 23. As a condition precedent to such pre-approval, Contractor shall identify to Owner's Representative any and all chemical consumable products that will be used in performing the Work or are listed on the Site's approved Chemical Consumables Products List. Such identification shall include a copy of the product's Material Safety Data Sheet (MSDS), the specific use and location of use, and the expected quantity that will be required to perform the Work. Owner's consideration of Contractor's request shall involve the products' health and safety hazards, environmental and fire hazards, potential for degrading Owner's systems or components, potential for creating Hazardous Materials, and availability of suitable alternatives. A substitute product may only be used following the receipt of express written permission by the Owner's Representative. Contractor is solely responsible for any costs or expenses incurred by Owner as a result of Contractor's use of a product that has not been specifically authorized. GTCs - Utility Services Page 17 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  7. Scan of page 28 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 28 of 52 23.6 Following completion of the Work, Contractor shall identify to Owner's Representative all materials or waste that it reasonably believes constitute Hazardous Materials. Final classification of such waste shall be at the sole discretion of Owner's Representative. Unless directed otherwise by Owner, Contractor shall promptly remove any and all equipment and consumables from the Site. In the event that Contractor fails to complete such removal in a timely fashion following completion of the Work, Owner may, at its sole discretion, retain any such material as property of Owner or arrange for its removal at the sole expense of Contractor. Such expenses to be borne by Contractor include the costs of laboratory testing, storage fees, processing, treatment, transportation, recycling, and disposal. The manifesting, transportation and removing from Site of any and all Hazardous Materials shall be effected by Contractor, at Contractor's sole cost and expense. 24. RESERVED 25. SAFETY PRACTICES, SECURITY, PROTECTION OF THE PUBLIC, WORK AND PROPERTY. 25.1 Contractor and Contractor Resources shall be instructed, familiar with and required to follow safety rules and regulations applicable to the Work being performed, and comply with (1) all Owner policies and procedures (available upon request) applicable to the Work, and any addenda, revisions or updates thereto,; and (2) those policies and procedures referenced in the Agreement or Order. Contractor shall coordinate site specific Personal Protective Equipment (PPE), arc flash protection and FR clothing requirements with the Owner. Contractor shall have the sole responsibility to see that such persons are so informed, properly trained and that safety practices are followed. 25.2 Contractor shall establish and maintain safeguards, controls, work rules, or other measures to protect the Equipment, and/or the Owner's property that is placed under Contractor's control, from damage, harm, or sabotage for the entire time during the performance of the Work until Final Acceptance. Contractor shall fully comply with any applicable Owner Site rules. For all Work to be performed at a Site, Contractor Resources shall comply with Owner's requirements, standards, procedures, and policies and training requirements, including those relating to safety, security, environmental practices and access authorization, currently in effect, copies of which are available upon request or may be available electronically, through an Owner web-site. Contractor shall conduct safety briefings and job hazard assessments. Upon Owner's request, Contractor shall provide documentation, confirming Contractor's compliance with this Article 25, including OSHA logs, qualification requirements and training certifications, licenses and detailed job safety and hazard assessment job plans, and reports of accidents involving Contractor Resources during the performance of the Work on Owner's Site. 25.3 While performing all Work, Contractor shall, and shall ensure that Contractor Resources strictly observe and fully comply with all federal, state, and local safety laws, rules and regulations applicable to the Work and/or the Site. Contractor shall provide and maintain all necessary precautions for the protection and safety of the public. It shall continuously take all necessary precautions to protect Owner's property from injury or loss arising in connection with the Agreement. In addition, when performing Work in close proximity to Owner's employees, Owner's safety rules shall be applicable. 25.4 Contractor shall train all Contractor Resources who carry out Work in the vicinity of energized conductors and equipment, in approved methods of artificial resuscitation, before such persons begin any Work. 25.5 Except with respect to Hazardous Materials, for which the provision of MSDS is required, pursuant to Article 23 "HAZARDOUS MATERIALS", upon Owner request, Contractor shall furnish to Owner's Representative Material Safety Data Sheets (MSDS) for any other product intended for use with the Work and make copies of such MSDS available to Owner at the Site or other mutually agreed upon location. No product for which an MSDS submittal has been requested shall be used until the MSDS has been reviewed by Owner. GTCs - Utility Services Page 18 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  8. Scan of page 29 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 29 of 52 25.6 For any Work that takes place at Owner facilities, Contractor shall comply with Owner's security requirements then in effect. Contractor Resources shall strictly adhere to the security regulations and obey the directions of Owner's security personnel. Contractor shall develop and, after review and approval by Owner, implement a security program to account for and protect all tools and equipment under its sole and exclusive care, custody and control in the performance of the Work. Owner shall not be liable to Contractor for loss of or damage to such tools or equipment. 25.7 Owner may immediately suspend or terminate all or any portion of the Work, without any added cost to Owner, and with no adjustments made to the schedule for the Work, if Owner determines that any safety or environmental violations have occurred, including conditions that could result in injury to any individual or damage to property or to the environment. 25.8 RESERVED. 25.9 In the event that Owner personnel observe and/or determine that a portion of Contractor's Work has been performed in nonconformance with the Agreement and if the continued existence of that portion of the Work in its then current state poses a threat of property damage or bodily injury to Owner, Owner personnel, other persons or the public, Owner shall have the right to correct the nonconforming Work or place the nonconforming Work in a safe condition. Owner shall notify Contractor verbally as soon as possible after discovering the nonconforming Work. Owner shall confirm the observation in writing within seven (7) days. If Owner has not yet paid for the Work, Owner may deduct the costs of affecting such repair from the outstanding amount due for the Work. If Owner has already paid for the Work, Contractor shall reimburse Owner for Owner's Direct Actual Costs for such repair. Contractor shall make good any damage resulting from lack of protective precautions. It shall adequately protect adjacent private and public property. 25.10 Contractor shall exercise the utmost care and shall carry on all activities under the supervision of properly qualified Contractor Resources. In the event of an emergency affecting the safety of the public, the Work, or property, or in the event of a release of Hazardous Materials Contractor shall as soon as reasonably practicable but in no event later than four (4) hours from the occurrence, of such event, notify Owner of the occurrence and details of such events. Contractor is hereby permitted to act at its own discretion to prevent such threatened loss or injury without special instructions or authorization from Owner's Representative except in the event of a release of Hazardous Materials. Any compensation claimed by Contractor on account of emergency work shall be determined by agreement or by arbitration. 25.11 RESERVED. 25.12 Contractor shall have obtained identity verification, criminal background checks (federal, state and county checks for prior 7 years) and drug tests for all Contractor Resources prior to using such Contractor Resources to perform Work at customer facilities or Owner Sites. Contractor shall not assign Work to Contractor Resources that have any record of convictions (including any record since employment with Contractor) for any felonies and misdemeanors involving violence, sexual offense, drugs, theft, computer crimes or identity theft, or otherwise present a risk of injury to any individual or damage to or loss of property. 25.13 For any serious safety incident that (1) occurs during any work that is under Contractor's supervision at any of Contractor's work locations, (2) is required to be reported to OSHA and (3) results in either a fatality of any employee of, or hospitalization of one (1) or more employees of, Contractor or a subcontractor to Contractor, Contractor shall notify Owner within five (5) Days after such safety incident. 26. DELIVERY, TITLE AND RISK OF LOSS TO EQUIPMENT AND MATERIALS. 26.1 Except as otherwise specified in the Agreement, delivery of any equipment and materials to be purchased by the Owner shall be F.O.B. Destination. Whenever Contractor provides Work that will not be subject to further work by Contractor, title and risk of loss shall pass to Owner upon the GTCs - Utility Services Page 19 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  9. Scan of page 30 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 30 of 52 delivery of the equipment F.O.B. Destination set forth in the Agreement and Acceptance. Except as otherwise expressly agreed to by the parties in writing in the Agreement Owner shall not pay any amounts for transportation or packaging. 26.2 Except as provided for in Section 26.1 above, title to all equipment and materials supplied by Contractor shall pass upon Acceptance of Work by Owner. 26.3 Title to all materials to be removed by Contractor shall pass to Contractor upon the loading of the materials into the containers supplied by Contractor or onto Contractor's truck, whichever occurs first. For purposes of this Section 26.3, the term Contractor shall include any Subcontractor performing Work under the Agreement. 26.4 RESERVED. 26.5 Contractor shall deliver the equipment and materials purchased by Owner to the location stated in the Agreement in accordance with the delivery dates and any schedule of performance provided in the Agreement, time being of the essence for each such delivery for which a date or a length of time is fixed for delivery. 27. CLEANUP. For Work performed at any Site, Contractor shall at all times keep the Site free from accumulations of waste material or rubbish. Unless otherwise directed by Owner or except for Scrap or material to be retained by Owner pursuant to Article 29 "MATERIALS", Contractor shall remove at its sole cost and expense from the Site and from all public and private property all temporary structures, rubbish and waste materials resulting from its operations. This requirement shall not apply to property that the Owner expressly grants its permission to be used for permanent disposal of rubbish or waste materials, provided such disposal is carried out by the Contractor in accordance with any and all conditions under which such permission is granted. 28. SCRAP. Unless otherwise expressly provided in the Agreement documents, at least five (5) business days prior to the commencement of the Work, Contractor shall notify the Owner's Representative of any Scrap to be generated from the Work and request direction regarding storage or disposal of such Scrap. Contractor shall comply with directions regarding Scrap disposal or storage provided by Owner's Representative. Except with respect to Scrap that Owner expressly directs Contractor to dispose of or otherwise take title to and manage, Owner shall retain title in all Scrap; provided, however, that Contractor shall bear risk of loss for Scrap that Owner wishes to retain until Contractor delivers such Scrap to the point of storage designated by Owner. 29. MATERIALS. Contractor shall exercise reasonable care in the receipt, storage, handling, and installation of all materials, whether supplied by Owner, by Contractor, or by another contractor. All excess material supplied by or charged to Owner shall be handled and managed as directed by Owner. 30. REMOVAL OF EQUIPMENT. Except as required to comply with the directions of Owner or Contractor's surety upon takeover of the Work, Contractor shall promptly remove all Contractor provided equipment, materials and supplies from the Site upon completion or termination of the Agreement subject to requirements set forth in Article 27 "CLEANUP". If Contractor fails to complete such removal within fifteen (15) days after notice from Owner, Owner may elect (i) to retain all or any portion of such remaining equipment, materials and supplies as its property, or (ii) to remove and dispose of all or any portion of such items at the expense of Contractor. 31. INSURANCE BY CONTRACTOR. As a condition to undertaking the Work, Contractor shall acquire, at its sole cost and expense, the following insurance coverage (or equivalent) from insurers with an A.M. Best rating of A- or better, GTCs - Utility Services Page 20 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  10. Scan of page 31 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    with the indicated amounts and shall maintain such required insurance coverages during all Work and until the date of final payment under the Agreement or Acceptance of all Work under the Agreement, unless a longer period is specified below: 31.1 Workers' Compensation in the amounts mandated by law (statutory coverage) and Employers Liability Insurance with limits of not less than $500,000. 31.2 Comprehensive or Commercial General Liability Coverage on standard bureau form excluding Professional Liability but including Operations, Products and Completed Operations, Contractual Liability and Broad Form Property Damage Liability written in one or more layers with a combined single limit for Bodily Injury and Property Damage of not less than $2,000,000 per occurrence and annual aggregate. Products and Completed Operations coverage shall remain in effect for a minimum of three (3) years from the date of final payment under the Agreement or Acceptance of all Work under the Agreement, whichever is later, unless the Work is to be performed solely in CT, in which case the required coverage should be in force for two (2) years from such date. 31.3 Comprehensive Automobile Liability Coverage, including all owned, non-owned, and hired vehicles, written in one or more layers with a combined single limit for Bodily Injury and Property Damage of not less than $2,000,000 per accident. 31.4 To the extent the Work includes engineering, design, or other professional services, Errors and Omissions coverage for professional Services and products provided by Contractor ,including coverages for intellectual property infringement and related risks with limit of not less than $2,000,000 per occurrence and annual aggregate, which coverage Contractor shall maintain in effect for a period of at least seven (7) years following the final payment under the Agreement or Acceptance of all Work Under the Agreement, whichever is later. 31.5 All policies contemplated in this Article 32 other than Workers' Compensation and Errors and Omissions shall be endorsed to include Owner, its affiliates and their respective directors, officers, employees and agents (including the Owner's Representative), as additional insureds as respects any and all personal and/or bodily injury and/or property damage claims arising out of Contractor's operations hereunder. The limits required under this Article 32 may be satisfied by a combination of primary and excess (umbrella) coverage layers. The foregoing insurance policies shall include a waiver of any right of subrogation of the insurers thereunder against the additional insureds thereunder, and of any right of the insurers to any set-off or counterclaim or any other deduction, whether by attachment or otherwise, in respect of any liability of any such person insured under such policy. Should any of the above described policies be cancelled before the expiration date thereof, notice will be delivered in accordance with policy provisions. 31.6 Contractor shall provide certificates of insurance to Owner to evidence Contractor's insurance policies within thirty (30) days of the award of any Agreement but in no event later than prior to the commencement of any Work. Contractor shall ensure that its broker shall provide Owner with replacement certificates evidencing required insurance coverage prior to the expiration of prior certificates. Failure to provide such certificates shall be grounds for withholding payment and/or termination of the Agreement. Owner shall have the right to review policy documents in the event a claim is filed thereunder.

As listed on the current system

Question(s) Answered 290 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)