Interrogatory responses

Answers to questions 288, 289, 291, 292, 297, 300

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-288 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 127-192. The Company reported an incremental charge of $493,876 for the D&D Power LLC vendor. Referring to p. 147, explain what “Cleanup Work” and “Storm Duty” represents within the referenced Eversource Contractor Storm Daily Time & Work Report (timesheet) and explain why these resources were not released at 3:00pm in lieu of billing for an additional six hours. Additionally, discuss if the information contained within the timesheet identifies the individual crew members responsible for each work assignment. Response: Cleanup work is referring to cleaning up the job sites when the events are complete. Once the crew restores a customer’s power, there is usually still an extensive amount of cleanup work needed to make the job site clean and safe before leaving. Storm duty refers to being ready to be dispatched to tickets during a storm event. Torrington AWC continued restoration activities late into the night on 4/4/24 which is why D&D was held later that day.

Text of EOE-292_Final.pdf

Extracted from the file

Text of EOE-292 Attachment 1 REDACTED.pdf

Extracted from the file

Text of EOE-297_Final.pdf

Extracted from the file

Text of EOE-300_Final.pdf

Extracted from the file

Text of EOE-300 Attachment 1 REDACTED.pdf

Extracted from the file

As listed on the current system

Question(s) Answered 288, 289, 291, 292, 297, 300 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026