Interrogatory responses
Answers to questions 278, 280, 283
Filed by Connecticut Light and Power Company dba Eversource Energy4 files
Part of docket 26-05-10Files4
EOE-278_Final.pdf
PDF · 92 KB · 1 pageText searchable
Download EOE-278_Final.pdfRead the text of EOE-278_Final.pdf
EOE-280_Final.pdf
PDF · 91 KB · 1 pageText searchable
Download EOE-280_Final.pdfRead the text of EOE-280_Final.pdf
EOE-280 Attachment 1 REDACTED.pdf
PDF · 1.7 MB · 17 pagesText searchable
Download EOE-280 Attachment 1 REDACTED.pdfRead the text of EOE-280 Attachment 1 REDACTED.pdf
EOE-283_Final.pdf
PDF · 92 KB · 1 pageText searchable
Download EOE-283_Final.pdfRead the text of EOE-283_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set EOE-06
Date Issued September 22, 2026
EOE-278
Page 1 of 1
Date Filed: October 06, 2026
Witness:
Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G.
Griffin
Request from: Office of Education, Outreach, and Enforcement
Question:
(MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-3, pp. 78-102. The Company reported an incremental charge of $4,271 for the Certified
Utility Services Inc. vendor. The invoice detailed activity that occurred both prior to and
subsequent to the MS24F event but did not include activity between the storm’s mobilization (i.e.,
1800 on April 3, 2024) and demobilization (i.e., April 4, 2024). Additionally, none of the Job
assignment documents referenced the MS24F event. Identify which, if any, of the assignments
supported the MS24F event and provide supporting documentation where appropriate. Identify the
amount of charges included which are unrelated to the MS24F event.
Response:
Referring to Exhibit ACCT-2 (CLP-6)(MS24F), Outside Line Contractors, at Line 126, Certified
Utility Services Inc., in the amount of $4,271.
The Company originally performed a detailed review of the invoice and developed a supporting
charge breakdown intended to isolate the costs associated with the MS24F event. Although that
review was completed and the supporting analysis appropriately identified the relevant charges,
the charges reflected in the final recovery support were subsequently modified during the approval
and processing workflow, resulting in the inadvertent inclusion of costs that were not associated
with the MS24F event. Page 93 of Confidential Exhibit ACCT-2 CLP-6A-3 is related to flagging
support during the storm on April 3rd. Based on this determination, the Company will supplement
Exhibit ACCT-2 CLP-6 (MS24F) to modify line 126 to reflect the updated amount of $432.
As listed on the current system
Question(s) Answered 278, 280, 283 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026