Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 290

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages

Scanned pages and machine-read text of EOE-290 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-290 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 2 REDACTED Page 1 of 1 REDACTED
    Fuel Cost @Fuel Taxes (State,Total Cost,Hours @
    DateLocationHotel AddressCityStateGallons[redacted] /gallonFederal, Lust & Spill)Fuel[redacted] /Hour
    4/4/2024ERE - Eversource - Cromwell CT Courtyard Marriott4 Sebethe DrCromwellCT[redacted][redacted]54.11375.27[redacted]
    4/4/2024ERE - Eversource - Cromwell CT Courtyard Marriott4 Sebethe DrCromwellCT[redacted][redacted]--[redacted]
    4/4/2024ERE-Eversource - Southbury Heritage Hotel522 Heritage RoadSouthburyCT[redacted][redacted]267.711,856.81[redacted]
    4/4/2024ERE-Eversource - Trumbull Marriott180 Hawley LnTrumbullCT[redacted][redacted]63.75442.20[redacted]
    4/4/2024ERE-Eversource - Norwalk Inn99 East AvenueNorwalkCT[redacted][redacted]24.72171.42[redacted]
    4/4/2024ERE-Eversource - Hampton Inn Norwich154 salem TurnpikeNorwichCT[redacted][redacted]63.98443.74[redacted]
    4/4/2024ERE-Eversource - Hampton Inn Norwich10 Laura BoulevardNorwichCT[redacted][redacted]175.011,213.85[redacted]
    4/4/2024ERE-Eversource - Homewood Suites S Glastonbury65 Glastonbury BlvdGlastonburyCT[redacted][redacted]146.431,015.66[redacted]
    4/4/2024ERE-Eversource - Hilton S Glastonbury85 Glastonbury BlvdGlastonburyCT[redacted][redacted]86.61600.75[redacted]
    4/4/2024ERE-Eversource - LaKota Oaks Center Norwalk32 Weed AveNorwalkCT[redacted][redacted]271.791,885.12[redacted]
    4/4/2024ERE - Eversource - Hilton Hartford315 Trumball StreetHartfordCT[redacted][redacted]--[redacted]
    4/4/2024ERE- Eversource - Southbury Wyndham1284 Southington RoadSouthburyCT[redacted][redacted]169.521,175.76[redacted]
    Grand Total, Fuel:$ 9,180.57[redacted]Total Hours
    [redacted]Rate per Hour
    $ 25,863.75Total Hourly Fees
    $ 1,642.35CT Sales Tax
    $ 27,506.10Grand Total Labor
    $ 36,686.67Invoice Total

Scanned pages and machine-read text of EOE-290 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 27 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 27 of 52 23. HAZARDOUS MATERIALS. 23.1 Contractor shall provide to Owner's Representative or designee a written description of and purpose for the use of any products or processes in the Work that are Hazardous Materials or may result in the generation of Hazardous Materials. Such written submission must identify, prior to the start of the Work and to the satisfaction of Owner's Representative or designee, the practices used to minimize such generation and demonstrate that it has taken all possible steps to eliminate or reduce to the maximum extent possible such generation. 23.2 Contractor shall ensure the environmentally responsible management of any Hazardous Materials included in or resulting from the Work. In performing the Work, Contractor shall comply fully with all Environmental Laws. Contractor is solely responsible for the proper identification and labeling, documentation, handling, storage, minimization, processing and recycling of any and all such Hazardous Materials. Unless otherwise indicated, Contractor shall be responsible for manifesting, transporting and removing from Site any and all Hazardous Materials. Contractor shall be liable for any and all costs incurred by Owner, at Owner's sole discretion, for the storage, handling, processing, removal and disposal thereof. 23.3 Contractor shall defend and indemnify Owner, its parent, affiliates and its and their employees, agents, officers and directors and hold it and them harmless from any and all damages, claims, demands, or suits of any kind for injury to persons, including death, and damage to property suffered by any person (including Contractor Resources) or by any firm or corporation arising out of, or claimed to have arisen out of, any acts or omissions of Contractor and Contractor Resources related to or involving Hazardous Materials generated during the course of the Work or brought to the Site by the Contractor or Contractor Resources. This indemnification shall include any liability or claims related to the storage, handling, processing, release, or removal from Site of any such Hazardous Materials by Contractor, Contractor Resources, transporters, recyclers, or any treatment, storage or disposal facility used by Contractor or such other persons. Further, this indemnification shall include liability for any and all costs or penalties (including legal, attorney, administrative, or regulatory fees and expenses) incurred or imposed as a result of actions pursued by federal, state or local governments or agencies related, in any way whatsoever, to the management of such Hazardous Materials. 23.4 Contractor agrees to use the EPA identification number assigned to the Site at which Contractor is working. The use of such EPA number shall not constitute assumption of environmental liability by Owner. In the event Owner has no EPA number for the Site in question, Contractor shall apply for a temporary number. 23.5 No chemical consumable product may be delivered to any Site without prior written approval by the Owner's Representative or designee in the manner provided in the first paragraph of this Article 23. As a condition precedent to such pre-approval, Contractor shall identify to Owner's Representative any and all chemical consumable products that will be used in performing the Work or are listed on the Site's approved Chemical Consumables Products List. Such identification shall include a copy of the product's Material Safety Data Sheet (MSDS), the specific use and location of use, and the expected quantity that will be required to perform the Work. Owner's consideration of Contractor's request shall involve the products' health and safety hazards, environmental and fire hazards, potential for degrading Owner's systems or components, potential for creating Hazardous Materials, and availability of suitable alternatives. A substitute product may only be used following the receipt of express written permission by the Owner's Representative. Contractor is solely responsible for any costs or expenses incurred by Owner as a result of Contractor's use of a product that has not been specifically authorized. GTCs - Utility Services Page 17 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  2. Scan of page 28 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 28 of 52 23.6 Following completion of the Work, Contractor shall identify to Owner's Representative all materials or waste that it reasonably believes constitute Hazardous Materials. Final classification of such waste shall be at the sole discretion of Owner's Representative. Unless directed otherwise by Owner, Contractor shall promptly remove any and all equipment and consumables from the Site. In the event that Contractor fails to complete such removal in a timely fashion following completion of the Work, Owner may, at its sole discretion, retain any such material as property of Owner or arrange for its removal at the sole expense of Contractor. Such expenses to be borne by Contractor include the costs of laboratory testing, storage fees, processing, treatment, transportation, recycling, and disposal. The manifesting, transportation and removing from Site of any and all Hazardous Materials shall be effected by Contractor, at Contractor's sole cost and expense. 24. RESERVED 25. SAFETY PRACTICES, SECURITY, PROTECTION OF THE PUBLIC, WORK AND PROPERTY. 25.1 Contractor and Contractor Resources shall be instructed, familiar with and required to follow safety rules and regulations applicable to the Work being performed, and comply with (1) all Owner policies and procedures (available upon request) applicable to the Work, and any addenda, revisions or updates thereto,; and (2) those policies and procedures referenced in the Agreement or Order. Contractor shall coordinate site specific Personal Protective Equipment (PPE), arc flash protection and FR clothing requirements with the Owner. Contractor shall have the sole responsibility to see that such persons are so informed, properly trained and that safety practices are followed. 25.2 Contractor shall establish and maintain safeguards, controls, work rules, or other measures to protect the Equipment, and/or the Owner's property that is placed under Contractor's control, from damage, harm, or sabotage for the entire time during the performance of the Work until Final Acceptance. Contractor shall fully comply with any applicable Owner Site rules. For all Work to be performed at a Site, Contractor Resources shall comply with Owner's requirements, standards, procedures, and policies and training requirements, including those relating to safety, security, environmental practices and access authorization, currently in effect, copies of which are available upon request or may be available electronically, through an Owner web-site. Contractor shall conduct safety briefings and job hazard assessments. Upon Owner's request, Contractor shall provide documentation, confirming Contractor's compliance with this Article 25, including OSHA logs, qualification requirements and training certifications, licenses and detailed job safety and hazard assessment job plans, and reports of accidents involving Contractor Resources during the performance of the Work on Owner's Site. 25.3 While performing all Work, Contractor shall, and shall ensure that Contractor Resources strictly observe and fully comply with all federal, state, and local safety laws, rules and regulations applicable to the Work and/or the Site. Contractor shall provide and maintain all necessary precautions for the protection and safety of the public. It shall continuously take all necessary precautions to protect Owner's property from injury or loss arising in connection with the Agreement. In addition, when performing Work in close proximity to Owner's employees, Owner's safety rules shall be applicable. 25.4 Contractor shall train all Contractor Resources who carry out Work in the vicinity of energized conductors and equipment, in approved methods of artificial resuscitation, before such persons begin any Work. 25.5 Except with respect to Hazardous Materials, for which the provision of MSDS is required, pursuant to Article 23 "HAZARDOUS MATERIALS", upon Owner request, Contractor shall furnish to Owner's Representative Material Safety Data Sheets (MSDS) for any other product intended for use with the Work and make copies of such MSDS available to Owner at the Site or other mutually agreed upon location. No product for which an MSDS submittal has been requested shall be used until the MSDS has been reviewed by Owner. GTCs - Utility Services Page 18 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  3. Scan of page 29 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 29 of 52 25.6 For any Work that takes place at Owner facilities, Contractor shall comply with Owner's security requirements then in effect. Contractor Resources shall strictly adhere to the security regulations and obey the directions of Owner's security personnel. Contractor shall develop and, after review and approval by Owner, implement a security program to account for and protect all tools and equipment under its sole and exclusive care, custody and control in the performance of the Work. Owner shall not be liable to Contractor for loss of or damage to such tools or equipment. 25.7 Owner may immediately suspend or terminate all or any portion of the Work, without any added cost to Owner, and with no adjustments made to the schedule for the Work, if Owner determines that any safety or environmental violations have occurred, including conditions that could result in injury to any individual or damage to property or to the environment. 25.8 RESERVED. 25.9 In the event that Owner personnel observe and/or determine that a portion of Contractor's Work has been performed in nonconformance with the Agreement and if the continued existence of that portion of the Work in its then current state poses a threat of property damage or bodily injury to Owner, Owner personnel, other persons or the public, Owner shall have the right to correct the nonconforming Work or place the nonconforming Work in a safe condition. Owner shall notify Contractor verbally as soon as possible after discovering the nonconforming Work. Owner shall confirm the observation in writing within seven (7) days. If Owner has not yet paid for the Work, Owner may deduct the costs of affecting such repair from the outstanding amount due for the Work. If Owner has already paid for the Work, Contractor shall reimburse Owner for Owner's Direct Actual Costs for such repair. Contractor shall make good any damage resulting from lack of protective precautions. It shall adequately protect adjacent private and public property. 25.10 Contractor shall exercise the utmost care and shall carry on all activities under the supervision of properly qualified Contractor Resources. In the event of an emergency affecting the safety of the public, the Work, or property, or in the event of a release of Hazardous Materials Contractor shall as soon as reasonably practicable but in no event later than four (4) hours from the occurrence, of such event, notify Owner of the occurrence and details of such events. Contractor is hereby permitted to act at its own discretion to prevent such threatened loss or injury without special instructions or authorization from Owner's Representative except in the event of a release of Hazardous Materials. Any compensation claimed by Contractor on account of emergency work shall be determined by agreement or by arbitration. 25.11 RESERVED. 25.12 Contractor shall have obtained identity verification, criminal background checks (federal, state and county checks for prior 7 years) and drug tests for all Contractor Resources prior to using such Contractor Resources to perform Work at customer facilities or Owner Sites. Contractor shall not assign Work to Contractor Resources that have any record of convictions (including any record since employment with Contractor) for any felonies and misdemeanors involving violence, sexual offense, drugs, theft, computer crimes or identity theft, or otherwise present a risk of injury to any individual or damage to or loss of property. 25.13 For any serious safety incident that (1) occurs during any work that is under Contractor's supervision at any of Contractor's work locations, (2) is required to be reported to OSHA and (3) results in either a fatality of any employee of, or hospitalization of one (1) or more employees of, Contractor or a subcontractor to Contractor, Contractor shall notify Owner within five (5) Days after such safety incident. 26. DELIVERY, TITLE AND RISK OF LOSS TO EQUIPMENT AND MATERIALS. 26.1 Except as otherwise specified in the Agreement, delivery of any equipment and materials to be purchased by the Owner shall be F.O.B. Destination. Whenever Contractor provides Work that will not be subject to further work by Contractor, title and risk of loss shall pass to Owner upon the GTCs - Utility Services Page 19 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  4. Scan of page 30 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 30 of 52 delivery of the equipment F.O.B. Destination set forth in the Agreement and Acceptance. Except as otherwise expressly agreed to by the parties in writing in the Agreement Owner shall not pay any amounts for transportation or packaging. 26.2 Except as provided for in Section 26.1 above, title to all equipment and materials supplied by Contractor shall pass upon Acceptance of Work by Owner. 26.3 Title to all materials to be removed by Contractor shall pass to Contractor upon the loading of the materials into the containers supplied by Contractor or onto Contractor's truck, whichever occurs first. For purposes of this Section 26.3, the term Contractor shall include any Subcontractor performing Work under the Agreement. 26.4 RESERVED. 26.5 Contractor shall deliver the equipment and materials purchased by Owner to the location stated in the Agreement in accordance with the delivery dates and any schedule of performance provided in the Agreement, time being of the essence for each such delivery for which a date or a length of time is fixed for delivery. 27. CLEANUP. For Work performed at any Site, Contractor shall at all times keep the Site free from accumulations of waste material or rubbish. Unless otherwise directed by Owner or except for Scrap or material to be retained by Owner pursuant to Article 29 "MATERIALS", Contractor shall remove at its sole cost and expense from the Site and from all public and private property all temporary structures, rubbish and waste materials resulting from its operations. This requirement shall not apply to property that the Owner expressly grants its permission to be used for permanent disposal of rubbish or waste materials, provided such disposal is carried out by the Contractor in accordance with any and all conditions under which such permission is granted. 28. SCRAP. Unless otherwise expressly provided in the Agreement documents, at least five (5) business days prior to the commencement of the Work, Contractor shall notify the Owner's Representative of any Scrap to be generated from the Work and request direction regarding storage or disposal of such Scrap. Contractor shall comply with directions regarding Scrap disposal or storage provided by Owner's Representative. Except with respect to Scrap that Owner expressly directs Contractor to dispose of or otherwise take title to and manage, Owner shall retain title in all Scrap; provided, however, that Contractor shall bear risk of loss for Scrap that Owner wishes to retain until Contractor delivers such Scrap to the point of storage designated by Owner. 29. MATERIALS. Contractor shall exercise reasonable care in the receipt, storage, handling, and installation of all materials, whether supplied by Owner, by Contractor, or by another contractor. All excess material supplied by or charged to Owner shall be handled and managed as directed by Owner. 30. REMOVAL OF EQUIPMENT. Except as required to comply with the directions of Owner or Contractor's surety upon takeover of the Work, Contractor shall promptly remove all Contractor provided equipment, materials and supplies from the Site upon completion or termination of the Agreement subject to requirements set forth in Article 27 "CLEANUP". If Contractor fails to complete such removal within fifteen (15) days after notice from Owner, Owner may elect (i) to retain all or any portion of such remaining equipment, materials and supplies as its property, or (ii) to remove and dispose of all or any portion of such items at the expense of Contractor. 31. INSURANCE BY CONTRACTOR. As a condition to undertaking the Work, Contractor shall acquire, at its sole cost and expense, the following insurance coverage (or equivalent) from insurers with an A.M. Best rating of A- or better, GTCs - Utility Services Page 20 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  5. Scan of page 31 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    with the indicated amounts and shall maintain such required insurance coverages during all Work and until the date of final payment under the Agreement or Acceptance of all Work under the Agreement, unless a longer period is specified below: 31.1 Workers' Compensation in the amounts mandated by law (statutory coverage) and Employers Liability Insurance with limits of not less than $500,000. 31.2 Comprehensive or Commercial General Liability Coverage on standard bureau form excluding Professional Liability but including Operations, Products and Completed Operations, Contractual Liability and Broad Form Property Damage Liability written in one or more layers with a combined single limit for Bodily Injury and Property Damage of not less than $2,000,000 per occurrence and annual aggregate. Products and Completed Operations coverage shall remain in effect for a minimum of three (3) years from the date of final payment under the Agreement or Acceptance of all Work under the Agreement, whichever is later, unless the Work is to be performed solely in CT, in which case the required coverage should be in force for two (2) years from such date. 31.3 Comprehensive Automobile Liability Coverage, including all owned, non-owned, and hired vehicles, written in one or more layers with a combined single limit for Bodily Injury and Property Damage of not less than $2,000,000 per accident. 31.4 To the extent the Work includes engineering, design, or other professional services, Errors and Omissions coverage for professional Services and products provided by Contractor ,including coverages for intellectual property infringement and related risks with limit of not less than $2,000,000 per occurrence and annual aggregate, which coverage Contractor shall maintain in effect for a period of at least seven (7) years following the final payment under the Agreement or Acceptance of all Work Under the Agreement, whichever is later. 31.5 All policies contemplated in this Article 32 other than Workers' Compensation and Errors and Omissions shall be endorsed to include Owner, its affiliates and their respective directors, officers, employees and agents (including the Owner's Representative), as additional insureds as respects any and all personal and/or bodily injury and/or property damage claims arising out of Contractor's operations hereunder. The limits required under this Article 32 may be satisfied by a combination of primary and excess (umbrella) coverage layers. The foregoing insurance policies shall include a waiver of any right of subrogation of the insurers thereunder against the additional insureds thereunder, and of any right of the insurers to any set-off or counterclaim or any other deduction, whether by attachment or otherwise, in respect of any liability of any such person insured under such policy. Should any of the above described policies be cancelled before the expiration date thereof, notice will be delivered in accordance with policy provisions. 31.6 Contractor shall provide certificates of insurance to Owner to evidence Contractor's insurance policies within thirty (30) days of the award of any Agreement but in no event later than prior to the commencement of any Work. Contractor shall ensure that its broker shall provide Owner with replacement certificates evidencing required insurance coverage prior to the expiration of prior certificates. Failure to provide such certificates shall be grounds for withholding payment and/or termination of the Agreement. Owner shall have the right to review policy documents in the event a claim is filed thereunder.
  6. Scan of page 32 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 32 of 52 31.7 Such insurance coverage shall be primary to any other coverage available to Owner or its affiliates, and shall not be deemed to limit Contractor's liability under the Agreement. 31.8 Contractor shall have and maintain in effect the insurances required by this Article 31 for the duration of the Agreement and thereafter for any period of continuing contractual obligations, including Contractor's warranty obligations. In addition, Contractor whose scope of work may include professional services shall procure tail coverage through the applicable warranty period on each errors and omissions policy maintained in accordance herewith upon the expiration and/or non-renewal thereof, unless Contractor's replacement errors and omissions policy provides continuing coverage for the Work through the applicable warranty period. 31.9 Contractor shall be solely responsible for payment of any and all deductible amounts relating to any and all of the policies of insurance required by this Article 31.. 31.10 For any Services to be provided by any Subcontractor, Contractor shall require such Subcontractor to provide the foregoing insurance coverages and amounts and comply with the requirements set forth in this Article 31. 32. INDEMNIFICATION BY CONTRACTOR. To the fullest extent permitted by Law, Contractor shall be responsible for and shall indemnify, and shall defend and save Owner, its affiliates and their respective employees, trustees, shareholders, officers, and directors, as well as their respective agents and consultants (each, an "Indemnified Person") harmless from and against any and all costs and expenses (including all costs and expenses of litigation, as well as related attorneys' fees), losses, liabilities, fines, penalties, damages, claims, demands, judgments, awards, obligations, actions, or proceedings arising from the acts or omissions of Contractor Resources or related to the Work or Contractor's obligations under the Agreement Documents. Contractor further agrees to obtain, and maintain at its expense, such insurance as will insure the provisions of all indemnity obligations in the Contract. Nothing in this Article shall derogate or reduce Contractor's obligations under Article 31 hereof. 33. INFRINGEMENT OF PROPRIETARY RIGHTS. 33.1 Contractor shall indemnify, defend and hold harmless Owner, its parent, affiliates and its and their employees, agents, officers, and directors from any and all liabilities, penalties, damages, claims, actions or proceedings based upon any allegation that (i) any portion or all of the Work furnished under the Agreement, or any use thereof for purposes intended by the Agreement constitutes an infringement of any patent, copyright, trademark or other proprietary interest or (ii) Contractor has, other than solely for Owner's benefit in connection with the Work, made use of Information in which a third party claims a proprietary interest which Information was obtained by Owner from third parties under agreements for confidentiality. 33.2 If Owner provides Contractor notice of a claim of infringement with respect to any material, equipment or Information used in connection with the Work (collectively, the "Product") or Owner's use of all or any portion of the Product is enjoined due to a claim of infringement, Contractor shall promptly and at its sole expense either (i) procure for Owner the right to continue using the Product or (ii) replace the Product with non-infringing and functionally equivalent Product, (iii) modify the Product so that it becomes non-infringing and functionally equivalent, or (iv) take such other action as is necessary to assure Owner's uninterrupted use of the Product. 34. CONFIDENTIAL INFORMATION. 34.1 Each party acknowledges that it may be necessary to disclose Confidential Information to the other. Except to the extent set forth in this Article 34, or as otherwise agreed to in writing by the parties, each party agrees to maintain in confidence all Confidential Information of the other party, and to not to disclose to third parties or to publish any Confidential Information of the other party that is disclosed. In maintaining the confidentiality of Confidential Information, each party shall exercise the same degree of care that it exercises with its own Confidential Information, and in no event less than GTCs - Utility Services Page 22 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  7. Scan of page 33 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 33 of 52 a reasonable degree of care. However, if Owner, within one hundred eighty (180) days of receipt of Contractor's Confidential Information, disputes the proprietary nature of such Information by written notice to Contractor, the parties shall consult to resolve such dispute. Each party shall advise its employees, Subcontractors, consultants, agents and those under its and/or their respective control of these requirements for confidentiality with regard to Confidential Information. 34.2 Owner shall have the right, without Contractor's approval, to disclose Contractor's Confidential Information to the limited extent required (i) for financing, acquisition or conveyance of ownership share, licensing, construction, startup, commissioning operation, maintenance or repair of the facility at which the Work is performed, and (ii) to comply with any request or order of a governmental agency or court. If Owner discloses Contractor's Confidential Information to any governmental agency or court, Owner shall, to the extent it does not violate or fail to comply with any such request or order, advise Contractor prior to disclosure and, at Contractor's sole cost and expense, cooperate in any effort by Contractor to minimize the amount of Confidential Information disclosed, secure confidential treatment of such Confidential Information, or seek permission from such governmental agency or court to revise the Confidential Information in a manner consistent with Contractor's interests, the interests of Owner, and in a manner that meets the requirements of the governmental authority or court. 34.3 Any Information transmitted to either party will not be deemed Confidential Information if that Information is: (a) in the receiving party's possession without restriction on disclosure prior to disclosure hereunder; (b) at the time of disclosure, generally available to the public without restriction on disclosure; (c) after disclosure, generally available to the public without restriction on disclosure, by publication or otherwise, through no fault of the receiving party; or (d) after the time of disclosure, received from a third party who imposes no obligation of confidentiality and who, insofar as the receiving party can reasonably determine, did not acquire any such Confidential Information directly or indirectly from the other party subject to requirements of confidentiality. 34.4 Contractor shall notify Owner as soon as possible in writing if any Confidential Information provided to Owner has been changed to a non-proprietary status. 34.5 The provisions of this Article 34 shall also apply to Information that a party identifies and establishes in writing to the others as having been obtained from third parties under agreements for confidentiality. 34.6 Owner may demand the return and/or disposal of its Confidential Information at any time upon giving of written notice to Contractor. Within fifteen (15) days of receipt of such notice, Contractor shall return all of the original Confidential Information and shall dispose of all copies, reproductions or extracts (both written and electronic) in its possession and in the possession of any representatives to whom it was disclosed using methods authorized by the National Association for Information Destruction for the media on which the Confidential Information is stored. Except as may otherwise be agreed upon by the parties in writing, Contractor shall provide Owner with written certification of the return and/or disposal of such Confidential Information promptly following the return or disposal of such Confidential Information. 34.7 In the event any Confidential Information of Owner is disclosed to Contractor by Owner under this Article 3534, Contractor shall not make use of such Confidential Information, other than for Owner's sole benefit and for the sole purpose related to the Work for which the Confidential Information has been disclosed. GTCs - Utility Services Page 23 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  8. Scan of page 34 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 34 of 52 34.8 The provisions of this Article shall survive the termination of the Agreement and shall bind the parties and their successors and assigns. 34.9 THIS SECTION IS APPLICABLE TO WORK RELATED GENERATION, TRANSMISSION AND DISTRIBUTION FACILITIES: In addition to the foregoing confidentiality obligations, to the extent that Contractor obtains or generates any critical energy infrastructure information ("CEII"), as defined by Federal Energy Regulatory Commission ("FERC"), pursuant to 18 C.F.R. §388.13, in its performance of the Work, Contractor shall keep confidential any CEII applicable to Owner and the Work. To the extent any such Work involves critical cyber assets, Contractor agrees to be bound by and comply with the North American Electric Reliability Council ("NERC") Critical Infrastructure Protection ("CIP") standards (CIP-002 through CIP-009). Contractor shall indemnify Owner for any liabilities or penalties arising from any failure to comply with the requirements of this Section 35.8 by Contractor, or its subcontractors, at any tier. In addition, upon request by Owner, Contractor shall execute an agreement confirming such compliance with the foregoing obligations.. 35. WARRANTY. 35.1 Services Warranty. 35.1.1 Contractor warrants that any Services performed or provided by, through, or on behalf of Contractor as part of or in connection with the Agreement shall (i) be performed by Contractor Resources who are fully qualified and competent and whose recommendations, guidance and performance reflect professional knowledge, judgment, and performance in accordance with the highest professional standards applicable to the utility industry and the industry applicable to such Services; and (ii) comply with and conform to all provisions and requirements of the Agreement and to any and all provisions of any and all applicable laws. 35.1.2 Within the period of two (2) years after Final Acceptance of all Work under the Agreement, if Owner determines that any portion of the Services performed by, through, and/or on behalf of Contractor fails to comply with the warranties set forth above, or if a defect or error is discovered in any Information supplied with such Services, Contractor shall, at its sole cost and at Owner's option, (i) correctly re-perform such Services or correct the defect or error in the Information, or (ii) return to Owner the charges paid by Owner and attributable to such Services or defective or erroneous Information supplied. Owner shall have the right to set-off against other amounts due Contractor hereunder or otherwise any amount owed by Contractor to Owner under this Article 35. 35.1.3 THIS SUBSECTION IS APPLICABLE ONLY FOR CONSTRUCTION WORK: SERVICES. In addition to the remedies set forth in Section 35.1.2, Owner shall have the right to (i) require Contractor to complete such warranty Work, or (ii) take over the Work and receive from Contractor reimbursement for such warranty Work. 35.2 Supplier Warranties Contractor shall take all reasonable steps to transfer for the benefit of Owner all warranties or guarantees available from the suppliers of any portion of the Work. 35.3 Information Warranty Contractor warrants that it has the full legal right, title and ownership of the Information furnished pursuant to the Agreement. GTCs - Utility Services Page 24 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  9. Scan of page 35 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 35 of 52 35.4 Equipment and Materials Warranty 35.4.1 For a period of one (1) year after Acceptance of all Work under the Agreement, Contractor warrants that all Equipment and materials it supplies shall be new when delivered and free from defects in title, design, material and workmanship and shall conform to the Specifications set forth in the Agreement. 35.4.2 Within the period of two (2) years after Final Acceptance of the Equipment and materials, if Owner determines that the warranty set forth above is breached, Contractor shall at its sole cost and expense and at Owner's option, either repair or replace the affected Equipment and materials. 35.4.3 Contractor shall have no obligation for breach of warranty if Owner fails to store, operate or maintain equipment supplied by Contractor in accordance with Contractor's written instructions furnished to Owner as part of the Work provided that Owner shall not be required to comply with standards that exceed those generally accepted in the industry. 35.5 Completion Warranty. Contractor warrants that it shall complete the Work in accordance with the Work schedule. If the Work falls behind schedule due to causes attributable to Contractor or Contractor Resources, Contractor shall, at its sole cost and expense, use its best efforts to restore the Work to schedule, including the following measures: placing Contractor Resources on extended working hours; assigning additional personnel to the Work, and prioritizing Contractor's resources and obligations to ensure that the Work is completed on schedule. 35.6 Additional Warranty Provisions. Owner shall notify Contractor in writing of any breach of warranty. 35.6.1 Owner shall notify Contractor in writing of any breach of warranty 35.6.2 In addition to its other warranty obligations, Contractor shall reimburse Owner for Owner's Direct Actual Costs to provide Contractor access to such defective Work and to restore facilities disturbed by such access. 35.6.3 If any defect in Contractor's Work, including corrective Work, is latent and not discoverable by Owner's reasonably careful inspection during the initial warranty period, the applicable warranty period shall be extended to a cumulative period of seven (7) years. 35.6.4 Corrective Work performed by Contractor shall be subject to the applicable warranty provisions of this Article. The warranty period for such corrective Work shall be the remainder of the original warranty period plus an additional two years. 35.6.5 The warranties provided for in this Article 35 shall apply regardless of where the Work is performed. 35.6.6 In the case of Work affecting government-owned property, warranties shall also be enforceable directly by the applicable government agency having jurisdiction. 35.7 Subcontractor Warranties. 35.7.1 Contractor shall obtain usual and customary warranties from Subcontractors. Such warranties shall be obtained for the benefit of Owner as well as for Contractor. Contractor shall ensure that the benefit of any warranty offered by any Subcontractor at any tier is passed through to Owner, shall provide a copy of the terms of any such Subcontractor warranty to Owner, and shall identify relevant Subcontractor contracts and otherwise actively assist Owner, as required or desired by Owner and without additional charge, in enforcing any such warranty in the event such enforcement should become GTCs - Utility Services Page 25 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  10. Scan of page 36 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    necessary. 35.7.2 The existence and/or absence of any Subcontractor warranties, including compliance or non-compliance therewith, shall not affect or impair in any manner whatsoever Contractor's obligations to Owner hereunder. 36. LIMITATION OF LIABILITY. 36.1 CONTRACTOR'S LIABILITY TO OWNER UNDER THE AGREEMENT WHETHER BASED UPON BREACH OF ANY EXPRESS OR IMPLIED WARRANTY, TORT, AGREEMENT, STRICT LIABILITY, OR OTHERWISE SHALL BE THE SUM OF (i) FOR WARRANTY AND INDEMNITY OBLIGATIONS, THE REMEDIES DESCRIBED IN THE CONTRACT, PLUS (ii) FOR DAMAGES CONTRACTOR IS REQUIRED TO INSURE AGAINST, ANY RECOVERY AVAILABLE UNDER THE INSURANCE COVERAGES REQUIRED BY THE CONTRACT PLUS (iii) FOR ANY ADDITIONAL DIRECT DAMAGES TO THE OWNER, AN AMOUNT EQUAL TO THE GREATER OF THE TOTAL OF ALL CHARGES PAID BY OWNER TO CONTRACTOR UNDER THE AGREEMENT OR TWO MILLION DOLLARS ($2,000,000). OWNER'S AGGREGATE LIABILITY TO CONTRACTOR UNDER THE AGREEMENT SHALL NOT EXCEED, UNDER ANY CIRCUMSTANCES WHATSOEVER, THAT PORTION OF THE COMPENSATION DUE UNDER ARTICLE 3 "TERMS OF PAYMENT" THAT HAS NOT YET BEEN PAID BY OWNER WITH RESPECT TO THE WORK. 36.2 EXCEPT TO THE EXTENT ALLOWED UNDER THE INSURANCE, WARRANTY OR INDEMNITY PROVISIONS OF THE AGREEMENT, NEITHER PARTY SHALL BE LIABLE TO THE OTHER FOR ANY INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES. 36.3 CONTRACTOR WAIVES ALL CLAIMS AGAINST OWNER FOR ANY LIABILITY OR LOSS IN CONNECTION WITH: (i) PAYMENT OF ALL FEDERAL, STATE AND LOCAL TAXES OR CONTRIBUTIONS IMPOSED OR REQUIRED UNDER UNEMPLOYMENT INSURANCE, SOCIAL SECURITY AND INCOME TAX LAWS WITH RESPECT TO CONTRACTOR'S WORK UNDER THE CONTRACT; (ii) ALL LOSSES IN CONNECTION WITH ANY CLAIMS FOR LOST WAGES, SEVERANCE PAY, PENSIONS OR OTHER BENEFITS WITH RESPECT TO CONTRACTOR'S WORK UNDER THE CONTRACT; AND (iii) ALL CLAIMS FOR LIABILITY FOR DAMAGE TO CONTRACTOR'S PERSONAL PROPERTY OR INJURY TO CONTRACTOR RESOURCES IN CONNECTION WITH THE AGREEMENT. 36.4 The parties understand and agree that the liability of Contractor to Owner under the Agreement, at law, and/or in equity shall not be limited by the amount of insurance coverage required or made available pursuant to the provisions of Article 31 "INSURANCE BY CONTRACTOR". 37. RIGHTS AND LIABILITIES OF PRINCIPALS. All benefits, protections, indemnifications and other rights in favor of Owner under the Agreement shall also benefit, protect and indemnify the principals of Owner. 38. WAIVER OF MECHANIC'S LIENS. Owner may condition payment to Contractor upon the receipt of lien waivers and releases from Contractor and all applicable Subcontractors. Contractor, for itself and Subcontractors at any tier, shall suffer no liens to exist upon any Site or other Owner property or Equipment and shall be responsible for any costs or liabilities arising from any liens Upon Owner's request, Contractor shall obtain, without additional cost to Owner, a bond satisfactory to Owner to indemnify Owner against such liens and charges. GTCs - Utility Services Revision 9 Dated 10/27/2015 Page 26 EVERSOURCE ENERGY CONFIDENTIAL

As listed on the current system

Question(s) Answered 290 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)