Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 290

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages

Scanned pages and machine-read text of EOE-290 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-290 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 2 REDACTED Page 1 of 1 REDACTED
    Fuel Cost @Fuel Taxes (State,Total Cost,Hours @
    DateLocationHotel AddressCityStateGallons[redacted] /gallonFederal, Lust & Spill)Fuel[redacted] /Hour
    4/4/2024ERE - Eversource - Cromwell CT Courtyard Marriott4 Sebethe DrCromwellCT[redacted][redacted]54.11375.27[redacted]
    4/4/2024ERE - Eversource - Cromwell CT Courtyard Marriott4 Sebethe DrCromwellCT[redacted][redacted]--[redacted]
    4/4/2024ERE-Eversource - Southbury Heritage Hotel522 Heritage RoadSouthburyCT[redacted][redacted]267.711,856.81[redacted]
    4/4/2024ERE-Eversource - Trumbull Marriott180 Hawley LnTrumbullCT[redacted][redacted]63.75442.20[redacted]
    4/4/2024ERE-Eversource - Norwalk Inn99 East AvenueNorwalkCT[redacted][redacted]24.72171.42[redacted]
    4/4/2024ERE-Eversource - Hampton Inn Norwich154 salem TurnpikeNorwichCT[redacted][redacted]63.98443.74[redacted]
    4/4/2024ERE-Eversource - Hampton Inn Norwich10 Laura BoulevardNorwichCT[redacted][redacted]175.011,213.85[redacted]
    4/4/2024ERE-Eversource - Homewood Suites S Glastonbury65 Glastonbury BlvdGlastonburyCT[redacted][redacted]146.431,015.66[redacted]
    4/4/2024ERE-Eversource - Hilton S Glastonbury85 Glastonbury BlvdGlastonburyCT[redacted][redacted]86.61600.75[redacted]
    4/4/2024ERE-Eversource - LaKota Oaks Center Norwalk32 Weed AveNorwalkCT[redacted][redacted]271.791,885.12[redacted]
    4/4/2024ERE - Eversource - Hilton Hartford315 Trumball StreetHartfordCT[redacted][redacted]--[redacted]
    4/4/2024ERE- Eversource - Southbury Wyndham1284 Southington RoadSouthburyCT[redacted][redacted]169.521,175.76[redacted]
    Grand Total, Fuel:$ 9,180.57[redacted]Total Hours
    [redacted]Rate per Hour
    $ 25,863.75Total Hourly Fees
    $ 1,642.35CT Sales Tax
    $ 27,506.10Grand Total Labor
    $ 36,686.67Invoice Total

Scanned pages and machine-read text of EOE-290 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 7 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 7 of 52 In the event an Emergency occurs (or is expected by Owner to occur), Owner may, if it so elects, contact Contractor by phone or in writing (including fax or email transmission) to solicit Contractor's availability to provide Emergency Response Work with respect to such Emergency. Owner shall, to the extent possible, advise Contractor of the expected duration and general locations(s) of the Emergency Response Work. If so contacted by Owner, Contractor shall immediately respond to Owner and provide Owner (on the form provided by Owner or by Contractor inputting such required information into Owner's website) with detailed information regarding the Contractor Resources that Contractor is able (and willing) to provide to Owner, including: • The type and quantity of fuel tanker trucks to be provided by Contractor to complete the Emergency Response Work (Contractor shall be required to provide at least two (2) dedicated fuel tanker trucks (with operators) to Owner for Emergency Response Work); and • The response time for mobilization of the Contractor Resources and necessary fuel tanker trucks to portions of the Site (and/or to other out-of-state locations) designated by Owner. If Owner awards such Emergency Response Work to Contractor, it shall notify Contractor of the initial locations (up to six (6) locations) where Contractor will need to provide diesel fueling Services for Owner's diesel utility vehicles within the twelve (12) hour period following such initial mobilization notice. Contractor shall also be prepared to provide diesel fueling Services for Owner's diesel utility vehicles in up to forty (40) separate locations (to be designated by Owner) within twenty-four (24) hours after such initial mobilization notice from Owner. Upon Contractor's receipt of such initial mobilization notice from Owner, Contractor shall expeditiously mobilize the manpower and fuel tanker trucks promised by it to Owner to the locations and/or portions of the Site (and/or to other out-of-state locations) designated by Owner in accordance with the schedule specified by Owner. Contractor shall be responsible for ensuring that the Contractor Resources mobilized for such Emergency Response Work are qualified and fit for duty (including no use of illegal drugs or alcohol, and no use of legal drugs that could adversely impact job performance) and are equipped with all necessary tools, safety clothing and equipment (including all necessary personal protective equipment and safety/flame-resistant clothing) to enable such Contractor Resources to properly and diligently perform the Emergency Response Work assigned to Contractor. When possible (under the circumstances), within twenty-four (24) hours after Owner's initial mobilization notice to Contractor, Owner shall endeavor to provide Contractor with a complete list of the locations where Contractor will be required to perform such diesel fueling Services and a six (6) hour time frame within which Contractor shall provide such diesel fueling Services to each location so designated by Owner. Owner reserves the right to shorten such notice periods to Contractor as required by the circumstances of the Emergency and the needs of Owner's customers. VI. PRICING TERMS AND INVOICING. A. Non-Emergency Work. Unless otherwise agreed in writing by Owner, Owner shall compensate Contractor for all non-emergency Work performed by Contractor hereunder pursuant to the pricing model set forth in Exhibit A. 7 EVERSOURCE CONFIDENTIAL
  2. Scan of page 8 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 8 of 52 B. Emergency Response Work. Unless otherwise agreed to in writing by Owner, all Emergency Response Work shall be performed by Contractor on a time and equipment/material price basis pursuant to the portal to portal hourly billing rates agreed to between Owner and Contractor (the initial portal to portal hourly billing rate for Emergency Response Work is set forth in Exhibit A). Such portal to portal hourly billing rates for Emergency Response Work shall be payable by Owner to Contractor from the commencement of Emergency Response Work through the termination of such period, excluding rest time during that period. The price of fuel (diesel, B20 biodiesel and kerosene) dispensed by Contractor to Owner's diesel utility vehicles during Emergency Response Work shall be as set forth in the pricing model in Exhibit A (and shall be the same for Emergency Response Work as for non-emergency Work). Fuel costs for Emergency Response Work shall also be billed by Contractor to Owner through the third-party billing company, Wright Express. Contractor shall record its fuel tanker truck usage time (and operator time) on a daily basis utilizing timesheets. Contractor shall invoice Owner upon completion of the Emergency Response Work. Each invoice for Emergency Response Work submitted by Contractor shall be accompanied by time sheets and expense reimbursement items for the period covered that have been approved by the Owner's Representative. Contractor shall comply with any and all reasonable requests hereafter made by Owner to expedite the invoicing process for Emergency Response Work, including the electronic submission of timesheets and other expense receipts. VII. SCHEDULE. A. Non-Emergency Work. The weekly schedule for Contractor's non-emergency on-Site diesel fueling Services under this Agreement shall be as mutually agreed by Owner and Contractor, which weekly fueling schedule may be subject to change/alteration based on Owner's needs and the observance of holidays by Owner. B. Emergency Response Work. Emergency Response Work will be awarded by Owner to Contractor hereunder pursuant to a Release issued under the Purchase Order, which shall contain the initial schedule for Contractor's completion of the applicable Emergency Response Work (which initial schedule may be adjusted and/or supplemented by Owner upon further notice to Contractor). Contractor recognizes the emergency nature of the Emergency Response Work and the importance to Owner of Contractor's prompt response and diligent and timely completion of all Emergency Response Work, and 8 EVERSOURCE CONFIDENTIAL
  3. Scan of page 9 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 9 of 52 REDACTED accordingly, time is of the essence of this Agreement with respect to Contractor's performance of the Emergency Response Work and meeting all of Contractor's obligations under the applicable provisions of the Contract. Contractor hereby agrees that under no circumstances whatsoever shall Contractor interrupt, slow, delay, stop or terminate its commencement, performance and/or prosecution of any Emergency Response Work due to the existence of any claims and/or disputes with Owner, including any claims and/or disputes regarding Owner's nonpayment of any sums alleged by Contractor to be due and owing by Owner to Contractor with respect to Emergency Response Work. Contractor further hereby agrees that if any claims and/or disputes arise between Contractor and Owner during Contractor's performance of Emergency Response Work, Contractor will continue to diligently perform and prosecute the Emergency Response Work and will address any and all claims and/or disputes with Owner after the completion of such Emergency Response Work in accordance with the dispute resolution provisions of Article 39 of the General Terms and Conditions. VIII. CONFIDENTIAL INFORMATION AGREEMENT; OWNER'S WORK PROTOCOLS AND STANDARDS. Within five (5) Business Days after the Effective Date of this Agreement, the parties hereto shall execute and deliver Owner's Confidential Information Agreement (a copy of which shall be provided to Contractor by Owner). After Contractor's execution and delivery of the Confidential Information Agreement, Contractor shall have access to Owner's website and Owner's work protocols and work standards, procedures and manuals (including Owner's safety and environmental standards and guidelines) available on Owner's website. Contractor hereby agrees that it will review and will comply (and will cause its employees assigned to Work, including Emergency Response Work to comply) with any and all of Owner's work protocols and work standards, procedures and manuals (including Owner's safety and environmental standards and guidelines) applicable to Contractor's Work, including Emergency Response Work hereunder. [Signatures on next page] 9 EVERSOURCE CONFIDENTIAL
  4. Scan of page 10 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 10 of 52 The parties hereto have executed this Agreement as indicated below.
    East River Energy, Inc., ContractorEversource Energy, Owner
    By [signature]By [redacted]
    Printed Name Jesse HerreraPrinted Name [redacted]
    Title VP/COOTitle Sourcing Agent
    Date 6/17/16Date 6/17/16
    10 EVERSOURCE CONFIDENTIAL
  5. Scan of page 11 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 11 of 52 EVERSOURCE ENERGY GENERAL TERMS and CONDITIONS UTILITY SERVICES 1. DEFINITIONS: ........................................................................................................ 2 2. CONTRACTOR'S BILLING RATES. ...................................................................................... 4 3. TERMS OF PAYMENT ........................................................................................................ 5 4. TAXES. ............................................................................................................................. 6 5. CHANGES AND ADDITIONS. ............................................................................................. 7 6. INFORMATION. ................................................................................................................. 7 7. ELECTRONIC DELIVERY OF INFORMATION. ................................................................... 9 8. DELAYS ............................................................................................................................ 9 9. FORCE MAJEURE. .......................................................................................................... 10 10. INSPECTION. ............................................................................................................... 11 11. REQUIREMENTS FOR ACCEPTANCE. ........................................................................ 11 12. PARTIAL COMPLETION AND ACCEPTANCE. ............................................................. 12 13. SUSPENSION OF WORK. ............................................................................................. 12 14. TERMINATION FOR CAUSE. ....................................................................................... 12 15. TERMINATION FOR CONVENIENCE. .......................................................................... 13 16. OWNER'S REPRESENTATIVE STATUS. ...................................................................... 13 17. CONTRACTOR'S SUPERVISORY DUTIES. .................................................................. 13 18. INDEPENDENT CONTRACTOR. ................................................................................... 14 19. SUBCONTRACTING. .................................................................................................... 14 20. COMPLIANCE. ............................................................................................................. 15 21. SITE REQUIREMENTS. ................................................................................................ 16 22. INCIDENTAL MATERIALS AND CONSUMABLES. ....................................................... 16 23. HAZARDOUS MATERIALS. .......................................................................................... 17 24. RESERVED ................................................................................................................... 18 25. SAFETY PRACTICES, SECURITY, PROTECTION OF THE PUBLIC, WORK AND PROPERTY ........................................................................................ 18 26. DELIVERY, TITLE AND RISK OF LOSS TO EQUIPMENT AND MATERIALS. ............... 19 27. CLEANUP. ................................................................................................................... 20 28. SCRAP. ........................................................................................................................ 20 29. MATERIALS. ................................................................................................................ 20 30. REMOVAL OF EQUIPMENT. ........................................................................................ 20 31. INSURANCE BY CONTRACTOR. ................................................................................. 20 32. INDEMNIFICATION BY CONTRACTOR. ...................................................................... 22 33. INFRINGEMENT OF PROPRIETARY RIGHTS. ............................................................ 22 34. CONFIDENTIAL INFORMATION. .................................................................................. 22 35. WARRANTY. ................................................................................................................ 24 36. LIMITATION OF LIABILITY ......................................................................................... 26 37. RIGHTS AND LIABILITIES OF PRINCIPALS. ............................................................... 26 38. WAIVER OF MECHANIC'S LIENS. ............................................................................... 26 39. DISPUTE RESOLUTION; NEGOTIATION; MEDIATION; ARBITRATION. ..................... 27 40. ADVERTISING. ............................................................................................................ 28 41. BINDING EFFECT; ASSIGNMENT. ............................................................................... 28 42. WAIVERS. .................................................................................................................... 28 43. APPLICABLE LAW. ...................................................................................................... 28 44. NOTICES; DEMANDS. .................................................................................................. 28 45. RIGHT TO AUDIT. ........................................................................................................ 28 46. DOCUMENT RETENTION. ............................................................................................ 29 47. SUPPLIER DIVERSITY AND SUBCONTRACTING PLAN. ............................................. 29 48. PRIORITY OF DOCUMENTS. ....................................................................................... 30 49. SEVERABILITY. ........................................................................................................... 30 50. FINANCIALS. ............................................................................................................... 30 51. PERFORMANCE ASSURANCE AND/OR LIQUIDATED DAMAGES. .............................. 30 52. NO GIFTS OR INDUCEMENTS. ................................................................................... 30 53. MOONLIGHTING RESTRICTION. ................................................................................. 31 54. CONFLICTS OF INTEREST. .......................................................................................... 31 55. APPLICABLE TO TRANSMISSION WORK ONLY: NON-HIRING PROVISION. ............. 31 56. APPLICABLE TO EMERGENCY RESPONSE WORK ................................................... 31 57. INTERPRETATION AND CAPTIONS. ........................................................................... 32 58. SURVIVAL. .................................................................................................................. 32 59. COMPLETE AGREEMENT. ........................................................................................... 32 GTCs - Utility Services Page 1 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  6. Scan of page 12 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 12 of 52 1. DEFINITIONS: All capitalized terms used herein, or elsewhere in the Agreement, shall have the meanings ascribed to them in this Article 1, unless such terms are otherwise defined in the Agreement. The terms "include(s)", "included" and "including" are used without limitation. 1.1 ACCEPTANCE: The Owner's determination that the Contractor has completed the Work in compliance with the Agreement requirements and satisfied the requirements as applicable, in Article 11 "REQUIREMENTS FOR ACCEPTANCE" 1.2 AFFILIATE: Any company or other business entity that (i) controls, (ii) is controlled by or (iii) is under common control with a Party or its parent. A company or other business entity shall be deemed to control a company if it has the power to direct or cause the direction of the management or policies of such company or other business entity, whether through the ownership of voting securities, by contract, or otherwise. 1.3 AGREEMENT: The collective term used to describe all documents comprising each agreement between the parties for the Work, including the Order, General Terms and Conditions, the Exhibits and Attachments to the General Terms and Conditions, Special Terms and Conditions (if applicable). Specifications, any items specifically incorporated by reference and/or issued (including any document issued with respect to any change order, modification or amendment) or provided by Owner to Contractor in connection herewith, and any amendments to the foregoing agreed to in writing by the parties. The preprinted terms set forth on the back of each page of NUSCO's Order shall not bind either party. 1.4 BUSINESS DAYS: Any day other than Saturday, Sunday and days observed as legal holidays by the federal or state government applicable to the Owner's Site(s) of Agreement performance. 1.5 CONFIDENTIAL INFORMATION: Confidential and/or proprietary information of a party to this Agreement. Owner's Confidential information includes written, oral, or electronic information and Information containing personal financial information, employee or customer information, personally identifiable information, protected health information, proprietary information or any other information that Owner designates as confidential and desires to protect against unrestricted disclosure or competitive use, including business plans, marketing strategies, bidding activities, commercial, technical and performance information, contracts, financial Information, research documentation, information about investors or any company or individual with whom Owner does business, information considered by Owner to be a trade secret and/or of a commercially valuable and sensitive nature or information that may otherwise be deemed confidential by law or regulatory agency, including Information described in Section 34.9 "CONFIDENTIAL INFORMATION". The parties intend that the designation of Contractor's Information as Confidential Information shall be limited to non-public financial information and non-public information that has unique commercial value and was developed independently from the Work. 1.6 CONTRACTOR: The entity issued an Order by Owner. 1.7 CONTRACTOR'S REPRESENTATIVE: The individual identified by Contractor with authority to act on behalf of Contractor in performance of the Agreement. 1.8 CONTRACTOR RESOURCES: Contractor's and any Subcontractor's employees, contract employees, consultants, agents, and all other persons or entities employed by or under the control of Contractor or any Subcontractor. 1.9 DIRECT ACTUAL COSTS: Reasonable direct expenses actually incurred, supported with adequate documentation, to perform a task. GTCs - Utility Services Revision 9 Dated 10/27/2015 Page 2 EVERSOURCE ENERGY CONFIDENTIAL
  7. Scan of page 13 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 13 of 52 1.10 ENVIRONMENTAL LAWS: Shall mean all applicable laws and any administrative or judicial interpretations thereof relating to: (a) the regulation, protection or use of the environment; (b) the conservation, management, development, control and/or use of natural resources and wildlife; (c) the management, manufacture, possession, use, generation, transportation, treatment, storage, disposal, release, threatened release, abatement, removal, remediation, or handling of, or exposure to, any Hazardous Materials; or (d) noise. 1.11 EQUIPMENT: A specific component, part, system, or material provided by Contractor as a very minor aspect of the Work under the Agreement. As used in the Agreement and as the context requires, the term "equipment" includes the Equipment. 1.12 EVERSOURCE: Eversource Energy Service Company, a Connecticut corporation, for itself or as agent for its Affiliates, dba Eversource Energy 1.13 FINAL ACCEPTANCE: Owner's written acknowledgement, determined in its sole discretion, that Contractor has completed all or a specified portion, if required or contemplated by the Agreement, of the Work in accordance with the requirements of the Agreement. 1.14 FINAL PAYMENT: That payment to be made to Contractor by Owner after Final Acceptance. 1.15 HAZARDOUS MATERIALS: The collective term used to describe (a) any petrochemical or petroleum products, oil, waste oil, asbestos in any form that is or could become friable, urea formaldehyde foam insulations, lead-based oil paint and polychlorinated biphenyls; (b) any products, mixtures, compounds, materials or wastes, air emissions, toxic substances, wastewater discharges and any chemical, material or substance that may give rise to liability pursuant to, or is listed or regulated under, or the human exposure to which or the release of which is controlled or limited by applicable Environmental Laws; and (c) any materials or substances defined in Environmental Laws as "hazardous", "toxic", "pollutant', or "contaminant", or words of similar meaning or regulatory effect. 1.16 INFORMATION: All intellectual property, computer software and documentation, studies, data, reports, documents, designs, plans, drawings, calculations, test results, specifications, electronic communications and data, or other information, in whatever form or media. This includes any patents, trademarks, servicemarks, copyrights, or trade secrets or any devices, designs, methods, or written works developed or capable of being developed during the course of this agreement. 1.17 ORDER: The document issued by Owner for specific Work, which shall be either: (a) a Purchase Order for any procurements by Eversource; provided however, that the preprinted terms on the back of Owner's Purchase Order(s) shall be excluded from the Agreement to which these General Terms and Conditions are attached, are hereby deleted and shall not bind either party; or (b) a Purchase Order or Contract form, for any procurements by any Eversource Affiliate provided however, that the preprinted terms on the back of Owner's Purchase Order or Contract form shall be excluded from the Agreement to which these General Terms and Conditions are attached, are hereby deleted and shall not bind either party.. Any additional or conflicting terms and conditions in Contractor's confirmation thereof, or Contractor's documentation, including invoices, are hereby expressly rejected and excluded from the Agreement, are inapplicable to the Agreement, shall not be considered part of the Order(s), and shall be of no force and effect. GTCs - Utility Services Page 3 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  8. Scan of page 14 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 14 of 52 1.18 OWNER: "Owner" shall mean Eversource or its affiliated company or companies listed in the "Furnish and Ship To" block on the face of the first page of the Purchase Order under which the Contract is issued, or the Eversource Affiliate for which the Work has been ordered. Each Owner shall be solely responsible to Contractor for Work awarded on behalf of such Owner. No Eversource Affiliate that is not the Owner as to any particular Work awarded shall be jointly and severally liable for Owner obligations hereunder with respect to such Work. 1.19 OWNER'S REPRESENTATIVE: The individual(s) identified in Owner's Order with authority to act on behalf of Owner concerning the Agreement, or otherwise identified by the Owner in writing in the Agreement. 1.20 SCRAP: Used, obsolete, surplus, scrap or excess material or equipment resulting or arising from Work at a Site which material or equipment has been identified by Owner and/or Contractor as having potential commercial value. 1.21 SERVICES: A specific service furnished by or on behalf of Contractor under the Agreement and as part of the Work which may be directly performed on, or pertain to, Owner's utility equipment. Such Services may include the following services: design, engineering, technical, consulting, construction; preparation and/or compilation of Information; procurement grounds keeping, property maintenance, repair, inspection, supervision; supply, transportation, installation, startup, testing of materials and equipment ; the supply of labor; and any other services to be performed as specified in the Agreement. 1.22 SITE: The location at which the Work is to be performed. The Site can include Owner's property, Owner rights of way, or other property not owned by Owner where Work is to be performed. 1.23 SPECIAL TERMS AND CONDITIONS: The Special Terms and Conditions, if any, attached hereto and made a part of the Agreement. 1.24 SPECIFICATIONS: The Work requirements, specifications or technical specifications, which may include instructions, scope or statement of work, written requirements for materials, equipment, construction, systems, standards, Information and workmanship for the Work and performance of Services, as provided, supplemented or revised from time to time by Owner. 1.25 SUBCONTRACTOR: Any subcontractor, licensor or supplier, at any tier, who furnishes materials, supplies, equipment, facilities and/or Services to Contractor to meet Contractor's obligations to perform Work under the Agreement. 1.26 WORK: The terms used to describe collectively, all equipment, materials, Information and Services, as referenced in the Agreement documents, and all related duties, obligations and responsibilities undertaken or required to be undertaken by Contractor under the Agreement. 2. CONTRACTOR'S BILLING RATES. Whenever Contractor performs Work on a time and materials basis (including Work performed as a change or addition to the scope of Work described in the Contract) Contractor shall be compensated at the billing rates set forth in the Order. Any adjustments to billing rates that are in compliance with Agreement terms must be provided to Owner for review in the form of a new rate schedule in advance of any invoicing based on such new rates. Owner may reject any invoices using billing rates that are inconsistent with Owner's current rate schedule on file.. GTCs - Utility Services Page 4 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  9. Scan of page 15 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 15 of 52 3. TERMS OF PAYMENT. 3.1 Owner shall pay all undisputed charges indicated in properly itemized and supported invoices for Work performed by Contractor and Accepted by Owner in accordance with the terms of the Agreement, within thirty (30) days after receipt of invoice by Owner. If Owner disputes a portion of an invoice, at Owner's request Contractor shall submit a revised invoice for the undisputed amount and Owner shall pay such undisputed portion within thirty (30) days after receipt thereof. Upon Owner's request, Contractor shall provide documentation regarding un-vouchered liabilities including, a) the estimated dollar amount of all Work performed but not invoiced for that month or previous months, and b) any invoice submitted but not yet paid. Documentation must include Owner's Order number and, if applicable, release number. 3.2 Contractor must invoice for Work in a timely fashion and within the period specified by Owner. Subject to Owner's invoicing instructions, Contractor shall issue its final invoice Owner within one hundred eighty (180) days of the completion of the Work being invoiced 3.3 Each invoice shall (a) be certified in writing as correct by Contractor's Representative; (b) be itemized (with reasonable detail) to fully describe each element of cost charged to Owner and any negotiated early payment discounts and (c) if applicable, contain a certification acceptable to Owner to the effect that all Subcontractors have been paid in full for completed Work as reflected in the immediately preceding invoice. For time and material Work, Contractor shall bill in accordance with Owner's billing instructions. 3.4 Owner may withhold payment of all or part of any invoice to such extent as may be necessary to protect itself from loss caused by: (a) defective Work not remedied; (b) claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor and/or Owner in connection with the Work; (c) failure of Contractor to make payments properly to Subcontractors for material, equipment or labor; (d) reasonable indication that the unpaid balance is insufficient to cover the cost to complete the Work; (e) reasonable indication that the Work will not be completed within the Agreement schedule; (f) unsatisfactory performance of the Work by Contractor; (g) failure of Contractor to perform any of its obligations under the Contract; or (h) failure of Contractor to pay any amounts due Owner. Owner shall notify Contractor of the grounds for any withholding, and when the above grounds are removed, or Contractor provides performance assurance satisfactory to Owner that will protect Owner for the amount withheld, payment will be made of the amounts withheld. When deemed reasonable by Owner, Owner may use such funds to rectify the situation causing the withholding of funds. 3.5 To the extent permitted by law, Owner shall have the right to set-off against any sums due Contractor under the Agreement any claims Owner may have against Contractor under the Agreement or under any other contract between Owner and Contractor, or that Owner may otherwise have against Contractor without prejudice to the rights of the parties with respect to such claims. In the case of Work incorrectly performed or incomplete, an equitable deduction from the Agreement price may be made. 3.6 Except for Work performed at a fixed price, Contractor shall make available to Owner during the Work and for a period of three (3) years following Final Acceptance of all Work, all source documents necessary to verify the elements of all billable charges, including: each worker's name, charge classification, and hours worked; computer usage summaries; and original documentation of all reimbursable expenses (e.g. receipts for travel, business expense and employee expense). Upon five (5) business days prior notice by Owner, this information shall be available for audit by Owner during normal business hours, at Contractor's principal office or at any other location agreed to by the parties. GTCs - Utility Services Page 5 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL
  10. Scan of page 16 of 52 of EOE-290 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-290 Attachment 1 REDACTED Page 16 of 52 3.7 THIS SECTION IS APPLICABLE ONLY TO WORK INCLUDING CONSTRUCTION RENOVATION OR REHABILITATION OF REAL PROPERTY IN CONNECTICUT: In addition to the requirements set forth in Section 3.3, each invoice that includes Agreement changes shall include a statement showing the status of all pending change orders and approved changes to the original Agreement (such statement shall identify the pending change orders and shall include the date such change orders were initiated, the costs associated with their performance and a description of any Work completed). For time and material Work, Contractor shall bill in accordance with Owner's billing instructions. Contractor shall pay any amounts due any Subcontractor for such Work furnished, in compliance with applicable laws including C.G.S. Section 42- 158j. 3.8 RESERVED. 4. TAXES. 4.1 Taxes on Owner's Purchases from Contractor. Contractor's price(s) and any Billing Rates that apply under the Agreement exclude any and all present and future Federal, state, county, municipal or other jurisdiction's sales, use, excise or other taxes that may apply to the Work and Owner's purchase of the Work and any applicable present and future Federal, state, county, municipal or other jurisdiction's sales, use, excise or other taxes shall be included in invoices and separately identified and itemized. The owner shall provide any applicable tax exemption certificates to the Contractor upon the Contractor's request.' 4.2 Taxes on Contractor's Purchases. If Owner informs Contractor that Owner has a tax exemption certificate or a direct pay permit that applies to a specified portion of the Work, Contractor shall notify its Subcontractors and suppliers that their Services performed for, or materials supplied for Contractor's use as part of the specified "tax exempt portion" or "direct pay portion" of the Work are either exempt from sales and use taxes or Owner pays such taxes directly. Consequently, these Subcontractors and suppliers should not collect such taxes from Contractor and Contractor's prices and Billing Rates to Owner should reflect such tax exemption or Owner's direct payment on Contractor's purchases from Subcontractors and suppliers for the tax exempt or direct pay portion of the Work. Subcontractors and suppliers providing Services or materials and/or equipment for any portions of the Work that are neither tax exempt nor direct pay shall apply any normally applicable sales or use taxes to such "normal tax" portions of the Work and Contractor's prices and Billing Rates will be deemed to include any and all applicable taxes on such normal tax portions of the Work. If Owner does not inform Contractor that it has a tax exemption certificate or a direct pay permit that applies to a portion of the Work, Contractor should presume that its purchases from Subcontractors and suppliers associated with the Work are subject to any applicable sales and/or use taxes on such purchases and Contractor will be deemed to have included any and all applicable taxes on its purchases from Subcontractors and suppliers in the prices and Billing Rates stated in the Agreement provided that any Billing Rates using markup percentages will not apply to taxes paid for such purchases. 4.3 Income, Property and Payroll Taxes. Notwithstanding any provision of the Agreement, Owner shall not be required to pay or reimburse Contractor for any taxes levied against Contractor's income, property or payroll. 4.4 Non-Resident Tax Bonds. If required by applicable law, Contractor and all Subcontractors shall provide to Owner a certificate of compliance with the non-resident contractor bonding provisions applicable to the Work. Contractor shall furnish such certificate to Owner in the case of (i) Contractor, no later than the earlier to occur of thirty (30) days after the effective date of the Agreement, or the date of commencement of the Work, and (ii) each Subcontractor, within the earlier to occur of thirty (30) days after Contractor's retention thereof, or the date of commencement of the Work under such subcontract. Absent such certificates, Owner shall be entitled to withhold amounts otherwise due to Contractor hereunder in accordance with applicable GTCs - Utility Services Page 6 Revision 9 Dated 10/27/2015 EVERSOURCE ENERGY CONFIDENTIAL

As listed on the current system

Question(s) Answered 290 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)