Interrogatories

To CL&P, questions 322 thru 329

Files1

  1. Page 4 of 23

    The following Interrogatories, designated as EOE-268 through EOE-329, are directed to The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource,” or “Company”). EOE-268. (TRAFFIC TIMESHEET REQUIREMENTS) Explain the specific timesheet reporting requirements for traffic crews during both storm and blue-sky activities, and provide any internal or external policies, procedures, or other guidance. As part of the response, identify any specific requirements for identifying when the crews performed standby in lieu of actual traffic control services. EOE-269. (VEGETATION CREW TIMESHEET REQUIREMENTS) Refer to Response to EOE-022. The Company’s response referenced that “[g]uidance on the handling of tree crew timesheets is included in all executed contracts…” Please provide or cite the specific guidance referenced in the response and identify if there are different expectations for each vendor. EOE-270. (CANCELLATIONS) Explain the Company’s process for identifying and canceling scheduled activity either prior to or during a storm event. As part of the response, please provide a listing of all cancellations for each storm event and the amount associated with each cancellation. EOE-271. (FUEL PROVIDERS) Identify if the Company pursued competitive bids in support of its engagement of Fuel providers. If pursued, provide documentation demonstrating the Request for Proposal (RFP) and the overall results. If not pursued, explain why. EOE-272. (MS24F-TIMING) Refer to Exhibit CLP-STORM-IMT-3 (Event 6) and Response to EOE-019, Att.1. Explain how the information provided within Ex. CLP-STORM-IMT-3 supports an initial arrival time of 6am within EOE019, Att.1. As part of the response, explain why the Company defined an initial arrival time that is 12 hours prior to the declaration of the ERP (i.e., Ex. CLP-STORM-IMT-3, p. 65) and 24 hours before the Emergency Operations Centers (EOCs) were activated (i.e., Ex. CLP-STORM-IMT-3, p. 65). EOE-273. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-1, pp. 23-62. The Company reported an incremental charge of $377,813 for the Asplundh Construction Corp. Respond to the following: a. Referring to pp. 40, 44, 47, 49, 51, 53, 55-56, and 59, explain why each of the crews were permitted to commence billing on April 3, 2024, at either 0600 or 0630 and solely bill for standby when the ERP declaration did not occur until 1800. As part of the response, please identify the
  2. Page 5 of 23

    incremental cost for the standby billing on April 3, 2024 for the hours prior to the 1800 ERP declaration. b. Referring to p. 43, explain why two individuals were permitted to bill for four hours (each) of travel for demobilization on April 5, 2024, without any details regarding the commute or the documentation to demonstrate that there was a commute (i.e., there was no corresponding mobilization). As part of the response, please provide documentation that was available at the time of the review. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 180 includes a List of Exhibits at p. 188 which references the Pricing Schedule as Exhibit B but was unable to locate the document. Additionally, EOE observed similar documentation within EOE-024, Att.2 (Confidential). with a similar omission. d. Referring to pp. 24-34, explain why the vendor billed for equipment during standby. As part of the response, identify the total incremental charge for the equipment billed during standby and separately identify the incremental equipment charge for the hours referenced in subsection b. EOE-274. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibits ACCT-2 CLP-6A-1 through CLP-6A-2. The Company reported 79 incremental charges in the combined amount of $315,461 for the Asplundh Tree Expert Co vendor. Respond to the following: a. Referring to rows 102-106, explain why the vendor incurred storm related charges for activity that occurred between April 8, 2024, and April 12, 2024, when the storm was demobilized on April 4, 2024. As part of the response, clarify if any of the charges should have been charged to the MN24J minor storm event (i.e., referenced in EOE-013, Att.1) and, if still applicable, provide documentation to support both the necessity and applicability of the remediation to the MS24F event. Finally, explain why some of the activity was performed at OT rates (e.g., pp. 98-100) and why the activity could not be performed by Eversource employees. b. Referring to rows 79, 80, 103, 105, and 106, the Company included charges for Disc Chippers. Explain why the Disc Chippers were necessary for storm remediation purposes. As part of the response, provide documentation to support the Company’s pre-authorization of the additional charges and identify the total amount charged for Disc Chippers. c. Referring to rows 52-58, 69-77, 92-93, and 95-96, explain why the vendor was not required to bill at ST rates for the hours billed through 1630. Specifically, the Company permitted 20 invoices to be billed at ST rates through 1600, typically for two consecutive days and failed to bill at the ST rate through 1630.
  3. Page 6 of 23

    d. Provide an unlocked Excel spreadsheet detailing each invoice referenced above (i.e., the referenced Rows) and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charge. Specifically, include the differential between the OT rate and ST rate multiplied by the hours billed at OT rates through 1630. EOE-275. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-2, pp. 137-142. The Company reported an incremental charge of $500 for the CC Security Corp vendor. The invoice details activity from April 1, 2024, through April 5, 2024, details unrelated workorder numbers, and appears to include costs from April 1, 2024 (i.e., several days prior to the MS24F event) within the recovery request. Explain how the costs were relevant to the MS24F event and provide supporting documentation. To clarify, the invoice included a subsequently added reference to “34X M24F011” for April 1, 2024, but all of the activity from April 1, 2024, through April 3, 2024, was prior to the storm event. EOE-276. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 1-22. The Company reported an incremental charge of $5,589 for the CC Security Corp vendor. The invoice details 22 individual charges with most line items referencing nonstorm workorder numbers or an unrelated minor storm workorder number (i.e., MN24J). Identify the specific charges applicable to the MS24F event and provide supporting documentation. Identify the amount of charges included which are unrelated to the MS24 event. EOE-277. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 51-77. The Company reported an incremental charge of $186,314 for the Central Connecticut Cable vendor. Respond to the following: a. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on April 4, 2024, and billed those hours at DT rates in lieu of the OT rates during those specific hours. Furthermore, please identify the total incremental billing associated with the billing at DT rates during standby on April 4, 2024. b. Referring to pp. 58-59, 64-65, and 70-73, explain why the vendor reported standby hours on April 4, 2024, and billed for equipment during those specific hours. As part of the response, please identify the total incremental billing associated with the billing of equipment during standby on April 4, 2024.
  4. Page 7 of 23

    EOE-278. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 78-102. The Company reported an incremental charge of $4,271 for the Certified Utility Services Inc. vendor. The invoice detailed activity that occurred both prior to and subsequent to the MS24F event but did not include activity between the storm’s mobilization (i.e., 1800 on April 3, 2024) and demobilization (i.e., April 4, 2024). Additionally, none of the Job assignment documents referenced the MS24F event. Identify which, if any, of the assignments supported the MS24F event and provide supporting documentation where appropriate. Identify the amount of charges included which are unrelated to the MS24F event. EOE-279. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 110-131. The Company reported an incremental charge of $4,658 for the Certified Utility Services Inc vendor. The invoice details activity that spanned both before and after the storm event, with no activity on April 4, 2024 (i.e., the primary day of storm recovery). Additionally, none of the Job assignment documents identified the MS24F011 workorder number as being relevant. Please identify the specific assignments that applied to the MS24F event and provide supporting documentation. Identify the amount of charges included which are unrelated to the MS24F event. EOE-280. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 132-135. The Company reported two incremental charges in the combined amount of $1,080 for the Certified Utility Services Inc vendor. Explain why both invoices referenced that they only performed standby but were permitted to bill for work zone setup, in addition to the hourly labor rate. Furthermore, cite the contract provisions that permit this billing treatment. If the contract has not yet been provided, please provide. To the extent that the vendor should not have billed for work zone setup during standby, please identify the total impact of this activity throughout all invoices included within Excel Rows 126-142. EOE-281. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 136-161. The Company reported an incremental charge of $16,693 for the Certified Utility Services Inc vendor. The invoice details activity from April 2, 2024 (i.e., prior to the mobilization at 6pm on April 3, 2024) to April 5, 2024, and references several unrelated workorder numbers. For each Job assignment document that details a different workorder number (i.e., pp. 139-141), please provide documentation to support the applicability of the charges to the MS24F event. Identify the amount of charges included which are unrelated to the MS24F event.
  5. Page 8 of 23

    EOE-282. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 218-230. The Company reported an incremental charge of $10,253 for the Certified Utility Services Inc vendor. Explain how the Company verified the alignment of costs to the MS24F event when most of the supporting Job assignment documents referred to different workorder numbers, including MN23AK011 (pp. 221, 224, 228, and 230) and MN23J011 (pp. 222, 223, 226, and 227). As part of the response, identify if these costs were incorrectly charged to MS24F or explain why the Company didn’t have the vendor correct the workorder number. EOE-283. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 39-49. The Company reported an incremental charge of $5,715 for the Certified Utility Services Inc vendor. The incremental cost included a Job assignment document on p. 49 that identified the activity as “Storm cancel”. Identify the nature of the services provided on April 5, 2024 (p. 49) and explain what “Storm cancel” was in relation to. As part of the response, identify if these costs were related to the cancellation of previously scheduled activity and if the hours represented a minimum number due to cancellation. Cite the contract provisions that permit the billing of hours for the cancellation. If the contract has not yet been provided, please provide. EOE-284. (MS24F-VENDOR-OTHER) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 56-59. The Company reported four incremental charges in the combined amount of $1,263 for the Charter Oak Building Maintenance Inc. vendor. The invoices provided descriptions of “storm related extra work” (p. 56), “coverage for building mechanic” (p. 57), and “storm related work” (pp. 58-59). Identify the specific services performed and explain how the services were both necessary and incremental for storm remediation purposes. EOE-285. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 86-87. The Company reported two incremental charges in the combined amount of $14,535 for the Coleman Drilling & Blasting Inc vendor. Both of the invoices were billed for hourly activity without signed timesheets or equivalent documents. Provide the relevant signed timesheets supporting the individuals and hours worked. If timesheets were not obtained, explain how the Company was able to validate the accuracy and applicability of the charges. EOE-286. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 88-107. The Company reported six incremental charges in the combined amount of $1,121,268 for the Conexus Energy Group LLC vendor. The Company provided invoices for five of the six charges but failed to provide signed Eversource Contractor Storm Daily
  6. Page 9 of 23

    Time & Work Reports or Eversource Contractor Storm Mobilization & Demobilization Time reports (collectively timesheets). Respond to the following: a. Provide the omitted signed timesheets for the charges included in Rows 154-158. If the documents cannot be provided, explain how the Company validated the accuracy of the billed activity. b. Referring to pp. 98-99 (i.e., supporting Row 159), explain why the vendor was permitted to bill for lodging when they were mobilized out of Beacon Falls, CT. As part of the response, identify if the lodging expense was due to contractual obligations and specify if the vendor was lodged at a hotel. If lodged at a hotel, identify the location. c. Referring to pp. 100-102, explain why the vendor was permitted to bill for 2 hours of travel time between Beacon Falls, CT and Milford, CT, a distance of approximately 20 miles. d. Referring to pp. 103-107, the timesheets provided identify the first assignment dispatch time of 8:34, approximately 2.5 hours after the vendor’s start time (i.e., box 6). Explain why the vendor did not record activity as standby until the initial assignment. As part of response, please identify the incremental impact of the vendor’s billing of equipment for 2.5 hours. EOE-287. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 108-126. The Company reported an incremental charge of $1,475 for the D&D Power LLC vendor. The supporting timesheet provided at p. 121 reported 2 hours for MS24F for several crew members and 2 hours for WO 81725834 for other crew members. Respond to the following: a. Explain what specific services were provided in support of MS24A and provide the referenced “Storm Sheet”. b. Explain what specific services were performed in support of WO 81725834. Include in the response an explanation of what the timesheet’s reference to “Rain Day” represents. If applicable, identify if the vendor’s contract permits it to bill for a minimum number of hours when services cannot be performed due to rain. If applicable, cite the contract provisions.
  7. Page 10 of 23

    EOE-288. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 127-192. The Company reported an incremental charge of $493,876 for the D&D Power LLC vendor. Referring to p. 147, explain what “Cleanup Work” and “Storm Duty” represents within the referenced Eversource Contractor Storm Daily Time & Work Report (timesheet) and explain why these resources were not released at 3:00pm in lieu of billing for an additional six hours. Additionally, discuss if the information contained within the timesheet identifies the individual crew members responsible for each work assignment. EOE-289. (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 193-194. The Company reported an incremental charge of $11,903 for the Distinctive Gardens & Tree Care LLC vendor. Respond to the following: a. Cite the applicable contract and pricing schedule, inclusive of the provision that permits the Per Diem charge. b. Identify if the vendor had access to Company provided meals on April 4, 2024, at the Torrington AWC. If the vendor had access to meals, explain why they were permitted to bill a Per Diem charge. c. Provide the omitted Eversource Connecticut Emergency Restoration Tree Contractor Work Location report and explain if the crew performed remediation activities or were held on standby. d. Explain why the vendor was permitted to bill for two mini excavators. As part of the response, provide documentation demonstrating the Company’s prior approval of this equipment. e. Referring to p. 194, explain why the vendor was permitted to only bill for 6 hours at an ST rate when they commenced billing at 9AM, resulting in 7.5 hours at an ST rate. (i.e., response to EOE-128) As part of the response, please identify the incremental impact of vendor’s billing for 6 hours at an ST rate versus 7.5 hours at an ST rate. EOE-290. (MS24F-VENDOR-FUEL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, p. 215. The Company reported an incremental charge of $37,930 for the East River Energy vendor. Respond to the following: a. Explain why the consolidated invoice does not agree with the amount requested for recovery. Specifically, the invoice identifies a charge of $36,687 (p.215) versus the requested amount of $37,930. b. Cite the applicable contract and pricing schedule, inclusive of the billed hourly labor charge. c. Provide documentation to support the of the per gallon charge for diesel fuel, including any industry standards. Furthermore, cite to the applicable contract provision which permits the vendor to charge for diesel at that cost. If the contract has not yet been provided, please provide.
  8. Page 11 of 23

    d. Provide the relevant signed timesheets or other documents supporting the validity of the hours billed. If timesheets were not obtained, explain how the Company was able to validate the validity of the hours charged. e. The Invoice included a reference to “Detailed spreadsheet provided”. Please provide the referenced spreadsheet. EOE-291. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 216-233. The Company reported two incremental charges in the combined amount of $259,193 for the E-J Electric T&D LLC vendor. Respond to the following: a. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 1147 includes a List of Exhibits at p. 1153 which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. b. Reference the billed rates on pp. 217 and 223 and the rates provided within OCC-044, Att.2 (Confidential), p. 1277. Explain why the rates charged by the vendor exceed the rates included within the contractual rate table provided. To the extent that the vendor billed higher rates than referenced within the contract, provide an Excel spreadsheet demonstrating the amounts overbilled. c. Referring to p. 223, explain why the cost of equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. d. Referring to pp. 218-221, explain why the Company permitted the vendor to exclude information within boxes 24 (Event Start Time) and 25 (Event End Time). As part of the response, identify when the crews received their first assignment. EOE-292. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 234-247. The Company reported an incremental charge of $205,216 for the Elecnor Hawkeye LLC vendor. Respond to the following: a. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 1492 includes a List of Exhibits at p. 1498 which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. b. Referring to pp. 238, 240, 242, 244-245, explain why the equipment was charged during standby (i.e., at the “1/2 rate” referenced) when the
  9. Page 12 of 23

    Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. EOE-293. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-5, pp. 1-25. The Company reported an incremental charge of $3,825 for the Elite Flaggers LLC vendor. The invoice included several references to “Rain Day” where each of the crews billed for four hours on April 5, 2024 (p. 2). Explain if the Rain Day charges involved storm remediation or if these were the result of job cancellations. If applicable to a job cancellation, identify if the vendor’s contract permits it to bill for a minimum number of hours when services cannot be performed due to rain and provide the relevant citation. If applicable to storm remediation, provide documentation demonstrating the assignments performed on April 5, 2024. EOE-294. (ECI COMPETITIVE BID ASSESSMENT) Explain the specific services performed by the Environmental Consultants Inc. vendor. Additionally, identify if the Company pursued competitive bids for the services performed by ECI prior to engagement. If pursued, provide documentation demonstrating the Request for Proposal (RFP) and the overall results. If not pursued, explain why. EOE-295. (MS24F-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 1-149. The Company reported an incremental charge of $6,403 for the Environmental Consultants vendor. The invoice (pp. 1-2) appears to include approximately one month of billing for the vendor and is supported by individuals’ weekly timesheets. Explain how the Company determined the amount applicable to the MS24F event and provide supporting documentation. Additionally, cite to the vendor’s contract and corresponding pricing schedule. If the contract or corresponding pricing schedule was not provided, please provide. EOE-296. (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 150-170. The Company reported an incremental charge of $16,352 for the Extra Duty Solutions vendor. Respond to the following: a. Identify the specific charges (i.e., line items) within the invoice that were allocated to the MS24F storm event. b. Explain why the invoice includes multiple line items referenced as Storm Standby for police officers. As part of the response, explain if the Company is required to stage police officers for storm events. If required, provide or cite the applicable requirements.
  10. Page 13 of 23

    c. The invoice includes multiple references to “Job Cancelled.” Identify the total charges for cancellations applicable to the MS24F event, as well as the charges applicable to other activities. Explain why the Company was required to incur charges for cancellations and identify the minimum amount of time that would have prevented charges for cancellations. EOE-297. (MS24F-VENDOR-FOOD/LODGING) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 173-175. The Company reported an incremental charge of $5,707 for the Graduate Hotels Storrs vendor. Explain why the invoice differs from the amount requested for recovery. EOE-298. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 178-179. The Company reported an incremental charge of $14,174 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. EOE-299. (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 186-191. The Company reported three incremental charges in the combined amount of $16,459 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. Additionally, explain why the Scope of Work (pp. 187, 189, 191) references different work order numbers. EOE-300. (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 202-211. The Company reported an incremental charge of $100,209 for the Harlan Electric Construction vendor. Respond to the following: a. Provide a brief description of the timing of events for this vendor and reconcile those activities with the documentation provided. As part of the description, explain how the vendor would have incurred four hours of billing from 6am to 10am on April 3, 2024 (to “Pick up Eversource Buckets” as referenced on pp. 204-207) and then resumed billing on April 4, 2024, at 6am with no Travel or hotel costs. Additionally, explain why the vendor finished its last assignment at 3:30pm on April 4, 2024, but was permitted to continue billing until 10:00pm. b. Referring to pp. 204-207, explain why the vendor was permitted to bill each employee for four hours on April 3, 2024, to “Pick up Eversource Buckets.” As part of the response, identify where the vendor was mobilized from. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC044, Att.2 (Confidential), starting at p. 2286 includes a List of Exhibits at

As listed on the current system

Interrogs from PURA/EOE to CL&P 322 thru 329-Issued 09/22/2026 [26-05-10]