Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 332

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files1

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-332 Page 1 of 1 Date Filed: October 09, 2026 Witness: Jessica B. Cain Request from: Office of Education, Outreach, and Enforcement Question: (MEDICAL AND FINANCIAL HARDSHIP DOCUMENTATION) If a customer’s account has not received the appropriate designation within the Company’s standard timeframe identified in response to EOE-330 after receipt of the required verification documentation, what steps does the Company take to remedy this situation? a. Does this process differ if a customer is already terminated during that delay caused by the Company? If so, please provide the applicable policy or procedure. Response: After the Company receives the required verification documentation, if a customer’s account isn’t provided with the appropriate financial hardship or medical certification designation within the Company’s target processing timeframe, the Company conducts a review of the account to determine whether the delay resulted in any adverse customer impact. If the Company determines that a customer may have been adversely affected due to a delayed designation, it will consider each account to take customer service recovery actions, which may include: • cancel-rebilling to provide the low-income discount rate retroactively back to the period the required documentation was submitted; • suspending any ineligible collection activity and/or; • contacting the customer to explain the situation, discuss options and any necessary next steps. a. Yes. If the review determines that a customer was disconnected during a period of delayed processing and their service should been protected during that period due to a verified financial hardship or medical certification status, the Company will treat the disconnection as an error. On a case-by-case basis, each situation would be evaluated, and the Company may take the following customer service recovery actions: • contact the customer promptly to apologize; • reconnect service as soon as possible; • reverse any reconnect fees, if charged and/or; • provide a goodwill credit.

As listed on the current system

Question(s) Answered 332 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)