Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf
6 pages match
  1. Page 21 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 21 of 125 Docket No. 11-09-09 Page 17 recurring costs related to their responses to the 2011 Storms until their next rate case.4 In each ruling to allow such deferral, the PURA stated that the costs may be deferred until the company’s next rate case, at which time the PURA will have the opportunity to review the expenses and proposed method of recovery. The PURA further stated that such deferral does not mean recovery. Rather, the PURA stated: “[a]t that time, the Authority, as well as other participants, will have the opportunity to determine the appropriateness of the recognition, if any, of those expenses for rate-making purposes.” Rulings to Motion Nos. 35, 39, 57, and 64 (emphasis added). The AG, the OCC and other participants will have the opportunity to challenge any request for storm cost recovery at the time of CL&P’s next rate case.5 The settlement agreement in the Decision in Docket No. 12-01-07, Application for Approval of Holding Company Transaction Involving Northeast Utilities and NSTAR (Settlement Agreement), entered into by Northeast Utilities (NU), NSTAR, the AG and the OCC imposed a rate freeze until December 1, 2014.6 The Settlement Agreement further provided that CL&P would file with the PURA for recovery of costs associated with both storms and that “such request will be subject to review and approval by the Authority in an adjudicatory proceeding.” This proceeding, by definition, is not the storm cost recovery proceeding contemplated by the Settlement Agreement. 3. Industry Norms Are Not Dispositive The Authority does not agree with CL&P’s argument that the conclusions from the consultants’ reports verify that CL&P met the required standard of care. Reply Brief of CL&P, pp. 18, 22 and 23. While it is understood that the consultants’ reports suggest CL&P adhered to industry norms in some respects, such as the overall time of full restoration, see Report of Witt Associates¸ December 1, 2011, p. 11; Witt Associates, CL&P Management Performance Audit: 2011 Major Storm Events, June 1, 2012, p. 1; the standard of care in the Authority’s three-part test on prudency is not limited by industry norms, nor limited to the single issue of full restoration timing. The first part of the Authority’s prudency test states “there must be a clearly understood definition of the standard of care by which a utility’s performance can be measured.”7 Decision dated August 6, 2008 in Docket No. 08-02-06, DPUC Investigation into The Connecticut Light and Power Company’s Billing Issues, p. 10; 4 Motions of Aquarion Water Company of Connecticut, No. 35, January 12, 2012; Avon Water Company, No. 39, March 13, 2012; Hazardville Water Company, No. 57, February 21, 2012, and Valley Water Systems, No. 64, March 6, 2012. 5 The Authority, as economic regulator, must ensure that the level and structure of rates charged only reflect “prudent and efficient management of the franchise operations,” pursuant to Conn. Gen. Stat. § 16-19e(a)(5). 6 Settlement Agreement dated March 13, 2012, section 4.3 approved in the Decision, Docket No. 12-01-07. 7 The three part test is as follows: “First, there must be a clearly understood definition of the standard of care by which a utility’s performance can be measured; second, the actions of the utility must be examined to determine if there has been a failure on its part to conform to the standard required; and finally, there must be a reasonably close casual connection between the imprudent conduct, if any, and actual loss or damage.” Docket No. 08-02-06, DPUC Investigation into the Connecticut Light and Power Company’s Billing Issues, Aug. 6, 2008, at 10-11.
  2. Page 22 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 22 of 125 Docket No. 11-09-09 Page 18 Decision dated July 21, 1988 in Docket No. 87-11-01, Public Hearing to Investigate Whether Charges or Credits Made Under the Purchased Power, Fossil Fuel, Purchased Gas Adjustment and/or Generation Utilization Adjustment Clauses Are Accurate for the Preceding Three Months, p. 11. In this test, there is no reference to industry norms, industry standards, or any other form of industry practices. Such references may be applied in order to determine the standard of care; however, industry norms by themselves are not determinative per se. This view is not only in accordance with the Authority’s test for prudency, but also with numerous other areas of law. In Tug Ocean Prince, Inc. v. United States, the Court held that actions in conformity with industry standards are not conclusive; an industry as a whole can lag behind the standard of reasonable care. 584 F.2d 1151, 1156-57 (2d Cir. N.Y. 1978), cert. denied, 440 U.S. 959 (1979). The customary practice of the industry is relevant, but the standard of care is not limited to complying with usual practices in the industry or trade. Troupe v. Chicago, Duluth & Georgian Bay Transit Co., 234 F.2d 253, 260 (2d Cir. N.Y. 1956). “Compliance with industry standards . . . does not necessarily preclude the existence of an issue of material fact.” Notarino v. City of New Haven, 2010 Conn. Super. LEXIS 1864 (July 15, 2010). At this time, the Authority must legally refrain from making a determination or ruling as to the prudency of CL&P’s 2011 Storm-related costs as that issue and proceeding are for another day. When this issue is determined, industry norms may not insulate CL&P in a moat of immunity as to whether it used and executed prudent and efficient management techniques in all aspects of its storm recovery activities. Further, Witt Associates makes the following clarification on industry norms by noting, “[t]he industry has recognized that such norms themselves are in need of improvement, particularly in the areas of damage assessment and establishment of restoration priorities. Trends in industry best practice are now towards addressing these recurring challenges.” June 1, 2012 CL&P Management Performance Audit: 2011 Major Storm Events by Witt Associates, p. 4. 4. Rebuttable Presumption of ROE Disallowance The record in this case is exceedingly well developed as to CL&P’s planning, reaction, restoration, communication, execution and recovery issues as to the 2011 Storms. Based on the record, the PURA can make a number of findings and recommendations. Most have to do with the manner of operation, but the Authority also does have broad regulatory authority8 and may exercise that authority in a manner that protects the relevant public interests, both existing and foreseeable. For reasons discussed below, the Authority concludes that CL&P’s performance in the areas regarding communication to customers, other service providers and municipalities was so deficient as to be less than adequate and suitable and to warrant regulatory sanction. This deficiency also involves its lack of preparation of personnel, failure to support 8 Conn. Gen. Stat. § 16-11 states that its purpose is to assure to the state of Connecticut its full powers to regulate its public service companies and to increase the powers of the PURA and that the statute is to be construed so as to effectuate these purposes.
  3. Page 23 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 23 of 125 Docket No. 11-09-09 Page 19 municipal liaisons and to reasonably develop and communicate restoration times to customers. In light of the overall substantial weight of evidence developed in this record regarding the performance of CL&P during the 2011 Storms, the PURA will establish a rebuttable presumption that CL&P should be imposed an appropriate basis point reduction to its allowed return on equity (ROE) in its next ratemaking proceeding as a penalty for such poor management performance and to provide incentives for improvement.9 The factual support for this legal presumption as to an ROE penalty is rebuttable: the burden of proof as to management execution and manner of operation as to these deficiencies identified in this proceeding will rest with CL&P. CL&P will have the opportunity to rebut the presumption, supported by the record in this case, as well as the amount of the adjustment to its ROE at its next ratemaking proceeding. B. THE CONNECTICUT LIGHT AND POWER COMPANY 1. Description of Infrastructure a. the Storms, Outages and Damage to CL&P Tropical Storm Irene Beginning on August 23, 2011, CL&P began escalated monitoring of Tropical Storm Irene, which at that time was located in the tropical Atlantic Ocean. On August 26, 2011, CL&P opened its Emergency Operations Center (EOC) in partial activation mode at 8:45 a.m. to support and organize planning and coordination activities. At 12:02 p.m. that same day, the CL&P EOC was opened in full activation mode and it initiated the process of implementing full staffing of the EOC. Also on August 26, 2011, CL&P initiated the process of securing additional resources and establishing logistics to support these resources. CL&P Response to Interrogatory EL-1. CL&P’s pre-storm preparation consisted of the following steps that were taken five days in advance of the approaching storm: Daily storm preparation calls were scheduled to ensure all preparations for the anticipated hurricane were completed on time; Mutual aid conference calls with the New England Mutual Aid Group (NEMAG) and the New York Mutual Aid Group (NYMAG) groups were held daily from August 24, 2011 through August 28, 2011 in anticipation of dealing with the anticipated affects from Hurricane Irene. Conference calls continued until September 7, 2011 to discuss mutual aid options; Line and tree contractors were secured and prepositioned; Helicopters were secured and prepositioned for reconnaissance; 9 For instance, Schedule A-1.0B in Docket No. 09-12-05 indicates that for the rate year ending June 30, 2012, 100 basis points (1 percent in CL&P’s ROE) is equivalent to $22.83 million.
  4. Page 24 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 24 of 125 Docket No. 11-09-09 Page 20 Vacations for all NU employees were cancelled; 100% of CL&P line crews were placed on-call; Calls to Western Massachusetts Electric Company and Public Service of New Hampshire were made regarding crew availability over the weekend; Logistics vendors were prepositioned to prepare staging areas; Confirmed the Mobile Command Center was available for use; Support staff storm assignments were confirmed; Circuit configuration was checked and distribution loop schemes defeated; All facilities were confirmed ready for heavy winds and rain. All outside material was secured to prevent blowing debris; and District storm rooms were checked for readiness. CL&P Tropical Storm Irene report filed September 20, 2011 in Docket No. 86-1118, DPUC Review of Performance of UI, CL&P and SNETCO in Restoring Service After Storm Carl. On August 27, 2011, CL&P continued the process of securing additional resources and monitoring the approaching storm. On the morning of August 28, 2011, Tropical Storm Irene made landfall in Stamford, Connecticut, exposing all of Connecticut to the northeast quadrant of the storm, which encompassed the most severe weather associated with it. The State experienced sustained winds of approximately 40 mph and gusts to 66 mph over the course of most of August 28, 2011. The State experienced up to eight inches of rain, uprooted trees and downed limbs which caused extensive damage to CL&P’s infrastructure. CL&P Response to Interrogatory EL-1. Tropical Storm Irene resulted in outages to 1,024,032 CL&P customers in total, including a peak outage level of 671,000. The following is a customer restoration curve showing customer outages during and after Tropical Storm Irene:
  5. Page 25 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 25 of 125 Docket No. 11-09-09 Page 21 CL&P Tropical Storm Irene report filed September 20, 2011, in Docket No. 8611-18. Restoration from Tropical Storm Irene was completed on September 6, 2011. b. October Storm CL&P states that beginning on October 27, 2011, weather forecasting services began predicting the possibility of a Nor’easter accompanied by heavy snow for October 29, 2011. As of October 28, 2011, weather forecasts were indicating that a wet snowfall of up to eight inches could be expected on October 29, 2011. CL&P Response to Interrogatory EL-13. CL&P took the following steps in advance of the snowstorm: The event was classified as a level 5 event per the CL&P Emergency Plan;10 Friday October 28, 2011, a storm preparation call was held to ensure all preparations for the anticipated nor’easter were completed on time; Mutual aid conference calls with NEMAG and NYMAG groups were held daily from October 28, 2011 through November 9, 2011, to discuss mutual aid options. Line and tree contractors were secured; Helicopters were secured for reconnaissance; Vacations for all NU employees were cancelled; 10 Level 5 is the most severe level classification and requires commitment of all available company personnel and resources.
  6. Page 26 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 26 of 125 Docket No. 11-09-09 Page 22 100% of CL&P line crews were placed on-call; Calls to Western Massachusetts Electric Company and Public Service of New Hampshire were made regarding crew availability over the weekend; Logistics vendors were contacted to prepare staging areas; Confirmed the Mobile Command Center was available for use; Support staff storm assignments were confirmed; All facilities were checked ready for a wind, rain, and snow event. Snow removal contractors were confirmed; and District storm rooms were checked for readiness. CL&P Tropical Storm Irene report filed November 23, 2011 in Docket No. 86-1118. On October 29, 2011, at 12:00 p.m., CL&P partially activated its EOC and began requesting external resources. At 1:13 p.m., CL&P fully activated its EOC. CL&P Response to Interrogatory EL-13. Beginning in the afternoon of October 29, 2011, heavy wet snowfall on foliated trees began causing trees and branches to fall on the CL&P electric infrastructure, resulting in outages to customers. By the end of the storm, up to 16 inches of heavy wet snow had fallen in CL&P’s service territory, resulting in severe damage to electric infrastructure and prolonged outages to customers. Following is a customer restoration curve showing customer outages during and after the October Storm: Customer Restoration October 29, 2011 - November 9th, 2011 Nor'easter 900000 800000 700000 500000 400000 300000 200000 100000 11/10/2011 00:00 11/09/2011 17:00 11/09/2011 10:00 11/09/2011 03:00 11/08/2011 20:00 11/08/2011 13:00 11/08/2011 06:00 11/07/2011 23:00 11/07/2011 16:00 11/07/2011 09:00 11/07/2011 02:00 11/06/2011 19:00 11/06/2011 12:00 11/06/2011 05:00 11/05/2011 22:00 11/05/2011 15:00 11/05/2011 08:00 11/05/2011 01:00 11/04/2011 17:00 11/04/2011 10:00 11/04/2011 03:00 11/03/2011 20:00 11/03/2011 13:00 11/03/2011 06:00 11/02/2011 23:00 11/02/2011 16:00 11/02/2011 09:00 11/02/2011 02:00 11/01/2011 18:00 11/01/2011 10:00 11/01/2011 02:00 10/31/2011 19:00 10/31/2011 11:00 10/31/2011 02:00 10/30/2011 19:00 10/30/2011 11:00 10/30/2011 04:00 10/29/2011 21:00 10/29/2011 14:00 10/29/2011 07:00 0 10/29/2011 00:00 Customers Affected 600000
  7. Page 27 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 27 of 125 Docket No. 11-09-09 Page 23 CL&P Tropical October Storm report filed November 23, 2011 in Docket No. 8611-18. Restoration from the October Storm was completed on November 12, 2011. 2. Liberty Findings In general, the Liberty Report concluded that CL&P performed a number of things well before, during and after the 2011 Storms; however, its overall storm performance was below average. Liberty cited the following aspects of CL&P’s storm response performance as particularly beneficial: CL&P’s systems and methods enabled customers to communicate easily with the company during the storms; CL&P has a superior distribution pole specification and groundling inspection program; The CL&P district emergency organization provides the framework to support an effective response; CL&P proactively communicated with the media, public officials, customers, and the public before, during and after the storms; CL&P’s emergency plans provide clear expectation of employee involvement in support activities; and The classification of service outage events in the emergency plans provides adequate guidance in determining the amount of required resources. Liberty Report, p. 1. Liberty identified the following aspects of CL&P’s storm performance as areas needing improvement: CL&P’s tree trimming program did not adequately remove vegetation that threatened electric lines, and contributed significantly to the extent of storm damage and the duration of service interruptions; CL&P could not provide restoration estimates or restoration status to customers on a timely basis; CL&P’s implementation of the Incident Command Structure did not set up the strong, top-down management that is necessary to react to major outages; CL&P made a determined effort to acquire outside resources, but the results were disappointing; and CL&P management did not have proper control over “Cut/Clear, Make Safe” work done in coordination with municipalities.
  8. Page 28 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 28 of 125 Docket No. 11-09-09 Page 24 Id. Liberty identified a number of corrective actions intended to improve performance during future storms that were self-identified by CL&P, some of which have been completed and some of which are still outstanding. Additionally, Liberty identifies a number of recommendations for improvements in the company’s practices and procedures. Other details of Liberty’s findings are addressed in the sections below. 3. Customer Communications CL&P maintains two customer call centers responsible for handling incoming customer calls, one in Windsor, Connecticut and the other in Manchester, New Hampshire. Prior to the onset of Tropical Storm Irene, numerous preparatory measures were taken to respond to anticipated high call volume and expected outages. CL&P Response to Interrogatory CSU-1. The pre-storm preparations began on August 23, 2011, and lasted until August 28, 2011. Examples of the measures taken by CL&P included cancelling all meetings, training and vacations for the week to maximize employee availability, scheduling 12-hour shifts for call center agents so as to provide 24-hour coverage, testing of all telephone systems and overflow options, notification of all medically coded customers of a multi-day outage event and to prepare for alternate arrangements via an outbound calling campaign, notification of all CL&P customers of a multi-day outage event and to prepare for alternate arrangements, activation of the call center’s emergency operations plan and the suspension of all outbound collections activity. Id. CL&P indicated that during storms, its two call centers can act as a single, virtual customer contact center. CL&P does not establish a separate call center to exclusively handle emergency calls, but those calls indicated as an emergency to the toll-free emergency number are prioritized and answered by the next available agent. According to CL&P records, from August 27, 2011 through September 6, 2011, 4,154 public safety calls (police and fire) were answered with an average speed of answer of 5 seconds and 24,789 customer-indicated emergency calls were answered with an average speed of answer of 4 seconds. CL&P Response to Interrogatory CSU-3. From August 27, 2011 through September 6, 2011, CL&P’s call center was staffed on a 24 hours per day basis. During Tropical Storm Irene, normal business transactions were suspended so that CL&P could focus on storm restoration efforts. CL&P Response to Interrogatory CSU-5. On the first day of Tropical Storm Irene, CL&P brought in its outsource IVR service to assist with the increase in call volume. Tr. 4/23/12, p. 1035. According to CL&P, call volume for the entire period of Tropical Storm Irene was approximately 1.03 million calls. This figure represents almost 23% of CL&P’s annual call volume. Further, call volume on August 28, 2011, was 300 times the average Sunday call volume. CL&P Response to Interrogatory CSU-4. A breakdown of CL&P’s call center performance metrics follows: Date Calls Handled11 ASA12 ACR% Peak Headcount 8/27/11 7,625 50 2.0% 35 8/28/11 387,376 67 2.0% 270 11 Includes calls to live agents and calls to an IVR. 12 In seconds.
  9. Page 29 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 29 of 125 Docket No. 11-09-09 8/29/11 8/30/11 8/31/11 9/01/11 9/02/11 9/03/11 9/04/11 9/05/11 9/06/11 219,930 113,389 93,409 70,702 53,058 28,550 17,408 9,172 32,951 Page 25 18 10 5 7 18 8 2 3 191 0.7% 0.4% 0.3% 0.2% 0.7% 0.2% .07% 0.1% 6.8% 323 395 369 287 284 201 153 121 145 CL&P Response to Interrogatory CSU-2. Preparations at CL&P’s call center for the October Storm began on October 27, 2011. CL&P implemented many of the same measures as it did for Tropical Storm Irene, including an outbound calling campaign to customers coded as medical. CL&P Response to Interrogatory CSU-18. For the period of October 29, 2011 through November 12, 2011, CL&P maintained live agents on a 24 hours per day basis at its call center to handle outage and emergency calls. During the first week of the October Storm, normal business transactions were suspended so that CL&P could focus on storm restoration activities. CL&P Response to Interrogatory CSU-21. CL&P’s outsource IVR provider was also put into operation on the first day of the storm. Tr. 4/23/12, p. 1035. Along with the IVR outsource vendor, CL&P utilized the additional resources of its Manchester, New Hampshire call center to address the increase in call volume, but unlike other weather events, the October Storm impacted customers of the Northeast Utilities’ system in the three states it operates. For CL&P, the call volume during the duration of the October Storm was approximately 1.1 million calls. This figure represented approximately 25% of CL&P’s annual call volume. On October 29, 2011, the first day of the storm, call volumes increased to a level that was 83 times the normal level for a Saturday. CL&P Response to Interrogatory CSU-20. CL&P also indicated that during the October Storm, its call center answered 4,224 public safety calls (police and fire) with an average speed of answer of 6 seconds and answered 51,927 customer-indicated emergency calls with an average speed of answer of 7 seconds. CL&P Response to Interrogatory CSU-22. A breakdown of CL&P’s call center performance metrics for the October Storm follows: Date Calls Handled13 ASA14 ACR% Peak Headcount 10/28/11 14,747 14 1.3% 131 10/29/11 217,887 196 3.9% 197 10/30/11 234,204 71 1.7% 231 10/31/11 126,012 4 0.1% 320 11/01/11 118,587 6 0.3% 361 11/02/11 100,765 14 0.5% 361 11/03/11 76,177 13 0.4% 325 11/04/11 68,553 40 1.2% 334 11/05/11 47,853 48 1.2% 236 13 Includes calls to live agents and calls to an IVR. 14 In seconds.
  10. Page 30 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 30 of 125 Docket No. 11-09-09 11/06/11 11/07/11 11/08/11 11/09/11 Page 26 42,655 39,935 22,285 17,772 51 7 7 19 1.7% 0.6% 0.2% 0.7% 205 387 312 299 CL&P Response to Interrogatory CSU-19. In its review of CL&P, Liberty found that its call centers performed extremely well for both storms. However, Liberty found some minor issues that arose during the two events. Tropical Storm Irene was the first time that CL&P utilized the services of its outsourced IVR vendor. Liberty stated that CL&P had no clear-cut rules or thresholds for when to start or stop the vendor. Liberty also stated that as a result of this, customers encountered busy signals during a brief period of time at the onset of the storm. Liberty contends that CL&P could have brought the outsource IVR vendor online sooner. Liberty Report, p. 101. CL&P’s call center performance metric indicated that over 4,400 busy signals were encountered by customers on August, 28, 2011. However, CL&P customers did not encounter any further busy signals for the remainder of Tropical Storm Irene other than a one-hour period on September 6, 2011, when an additional 226 busy signals were registered. CL&P Response to Interrogatory CSU-2. CL&P agreed that there were no procedures in place. However, CL&P looks at each storm or event individually to examine call volume, the time of day, or other considerations. Thus, the decision to initiate the outsource IVR vendor is executed on a case-by-case basis. Tr. 4/23/12, pp. 1036 and 1037. Liberty also noted that during Tropical Storm Irene, the CL&P IVR Vendor’s (IVR Vendor) upfront message was not the same as the upfront message at the CL&P call center. Liberty Report, p. 102. CL&P explained that the outsourced IVR has a standard message that allows customers to process their phone call instead of a message being utilized at the CL&P call center. According to CL&P, it resolved the issue by updating the messages to make them consistent. Tr. 4/23/12, pp. 1042 and 1043. There was one other issue that Liberty commented on that began during Tropical Storm Irene and occurred again during the October Storm. When the outsource vendor’s IVR can find the incoming phone number in its database for an outage report, an outage ticket is automatically created and forwarded to CL&P’s outage management system. If the outsource IVR cannot match the phone number, the phone number is recorded on an “exceptions log” that is forwarded every 30 minutes to CL&P for manual processing. Each exception represents a reported outage and CL&P must contact the customer associated with the phone number to identify the correct account and then manually enter an outage in the outage management system. During Tropical Storm Irene, CL&P received 14,830 exceptions and during the October Storm 52,370 exceptions were received from the outsource IVR. Liberty stated that during both storms as many as 30 CL&P employees were assigned 12-hour shifts until all of the exceptions were resolved. The exceptions from Tropical Storm Irene were resolved in approximately 2.5 days while the exceptions from the October Storm were resolved in 4 to 5 days. Liberty Report, pp. 100 and 101, 106. According to CL&P, this situation has not been resolved, but it is looking into ways of fixing it. One of the ways that CL&P is investigating is having the IVR system accept other forms of input, such as an account

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026