Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf
6 pages match
  1. Page 51 of 125Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 51 of 125 Docket No. 11-09-09 Page 47 Liberty Report noted that it has a superior distribution pole specification and ground line inspection program and that wood pole conditions did not appear to contribute materially to the effects of the 2011 Storms. CL&P Brief, pp. 17-19. Regarding plans for future improvements in its infrastructure, CL&P indicates that it has allocated an additional $7.3 million in 2012 to support additional maintenance tree trimming and an additional $20 million to support additional enhanced tree trimming. CL&P intends to submit a “system resiliency filing” by July 9, 2012, which will include proposals for additional tree trimming and certain distribution system equipment upgrades.18 Id., pp. 28 and 29. The OCC supports some changes to the EDCs’ vegetation management practices, but questions whether increasing line clearance and tree removal efforts is a “complete solution” under major storm conditions. The OCC states that complete clearing of limbs overhanging lines is rarely practical or achievable and may increase the number of hazardous trees. The OCC suggests a more measured and considered approach to vegetation management, based on more frequent visual inspection and branch reduction. The OCC requests the PURA order a detailed study comparing the performance of circuits that received enhanced trimming to those that received routine maintenance. The OCC believes that the EDCs should increase emphasis on hazard tree removal. The OCC also notes that CL&P’s mid-cycle trimming efforts have declined in recent years and suggests the Authority order the company to recommence mid-cycle trimming at the level approved in the last rate case. OCC Brief, pp. 56-61. Liberty found that the company’s performance-based tree trimming program leaves extensive vegetation in place that becomes problematic during a major storm and recommends that CL&P transition to a four-year interval based trimming cycle. Liberty also found that the amount of overhanging limbs left in place after standard tree trimming is accomplished is another concern. Liberty notes that its Enhanced Tree Trimming (ETT) program removes overhanging limbs outside the normal trim zone, but this program is not applied throughout CL&P’s system. Liberty further found that the hazardous tree removal budgets represent a concern, in that, given the high cost of removing a tree, hazardous tree removal is restricted to the most critical situations. Liberty Report, p. 35. The Authority notes the conclusions of Liberty and other reports regarding the necessity of a four-year maintenance tree trimming program. The Authority finds the evidence and expert opinion on this subject is conclusive and that CL&P should implement a four-year-based trimming cycle, and so orders the company to do so. The Authority will examine funding requirements of this change in Docket No. 12-07-06, Application of The Connecticut Light and Power Company for Approval of its System Resiliency Plan. With regard to other infrastructure maintenance issues, Liberty determined that wood pole failures did not materially contribute to the effects of the 2011 storms. Liberty also determined that CL&P’s pole maintenance program is adequate to maintain the poles to NESC safety requirements. Liberty did, however, determine that a high 18 This filing is required by the Settlement Agreement approved in Docket No. 12-01-07.
  2. Page 52 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 52 of 125 Docket No. 11-09-09 Page 48 number of cross arms were broken during the storms and that CL&P should institute a program to verify the material condition of wood cross arms. Id., pp. 40 and 41. The Authority determines that none of the Liberty Report’s findings or conclusions with regard to vegetation management, system maintenance and system design issues are contradicted by the record in this proceeding. Thus, the Authority adopts the findings, conclusions and recommendations of the Liberty Report with regard to vegetation management, system maintenance and system design issues. Below, the Authority addresses certain issues that are outside the scope of the Liberty Report or that require additional analysis. With regard to the OCC’s recommendations for modifications to maintenance tree trimming, the Authority is receptive to ideas that would make tree trimming more effective and cost-effective. However, any departure from the straightforward, four-year trim cycle recommended by the Liberty Report (which, according to Liberty, is the industry standard) would need substantial proof of its effectiveness supported by case experience in other jurisdictions. The Authority finds that Connecticut should not be used as a test case to determine whether any non-standard approaches are effective or not. The Authority will consider modifications to the Company’s tree trimming programs in Docket No. 12-06-09. With regard to the OCC’s recommendation that mid-cycle trimming should not be permitted to lapse, the Authority finds that this is an issue properly addressed in Docket No. 12-06-09. Mid-cycle trimming is primarily oriented toward reducing routine vegetation contacts, not major storm related contacts. The record demonstrates that major storm related vegetation contacts primarily originate from outside the normal trim zone and that enhanced tree trimming is the appropriate program for reducing the threat from vegetation outside the trim zone. Liberty Report, pp. 29, 34. The Authority will examine this issue more closely in Docket No. 12-06-09. The Authority endorses the OCC’s recommendation that the performance of circuits receiving ETT should be studied. The Authority believes CL&P already has extensive data and has already done much analysis in this area; however, a formal study ordered in this proceeding would be timely. The Authority will order the company to submit a study on ETT program effectiveness. The OCC requests that the Authority find CL&P imprudent for failing to deploy mobile data terminals (MDTs) in line trucks, allegedly in violation of the PURA’s orders in Docket No. 10-03-08. According to the OCC, failure to deploy MDTs adversely affected damage assessment and outage restoration activities by delaying restoration activity updates, which were often not relayed from crews in the field until the end of the day. OCC Brief, pp. 31-34. CL&P states that the issue of MDT deployment in line vehicles is still under review. To date, its analysis indicates that, rather than deploying MDTs in each vehicle, it is equally efficient to assign laptops with air cards to field supervisors, who are directly overseeing the work of several line crews and should be able to provide the equivalent communications capability. Furthermore, during a major storm, MDT equipped vehicles would only exist in a small minority of line crews, since the vast majority of crews would
  3. Page 53 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 53 of 125 Docket No. 11-09-09 Page 49 be from mutual assistance and not have MDTs. Field supervisors with laptops would oversee those crews, and thus provide them with equivalent electronic communication capability. Tr. 4/24/12, pp. 1242-1248. The Authority has not ordered CL&P to deploy MDTs in line vehicles. In Docket No. 10-03-08, the Authority’s consultant, Jacobs Consultancy, recommended in its report that CL&P “[c]onsider accelerating programs intended to provide mobile data terminals in line trucks.” On this matter, the Authority has not reached a conclusion that CL&P must fully implement MDTs; however, CL&P should implement some technology that provides real time electronic communication capability to enable real time status updates from the field on restoration efforts. An equally important matter is that, many crews who were capable of relaying restoration status did not do so. Tr. 4/24/12, p. 1111. The Authority finds comprehensive action should be taken by the company to ensure real time data is available from all crews, both the company’s own crews and from mutual assistance and contractors, and that action should be taken to assure those crews use that technology. The Authority orders the company to take such actions. 6. Storm Monitoring, Preparations and External Assistance The AG states that CL&P took a number of steps to solicit assistance in preparation for Tropical Storm Irene, but was incapable of reacting quickly to the October Storm, when given less time to prepare. According to the AG, CL&P’s own weather forecasts of October 28, 2011, showed that significant amounts of heavy, wet snow were expected to fall the next day, and by that afternoon, those forecasts called for as much as a foot of snow. However, in spite of those forecasts, as of 5:15 p.m. on October 28, 2011, CL&P had not requested any outside crews, had not pre-positioned any employees or materials, had not set up satellite staging areas, had not deployed liaisons to the towns, had not implemented its incident command structures, had not implemented its ERP and had not opened an emergency operations center. Finally, the AG asserts that CL&P did not properly manage outside crews once they arrived. AG Brief, pp. 7 and 8. In rebuttal to the AG’s concerns above, CL&P notes that the AG did not complain about the process CL&P used to obtain mutual aid during Tropical Storm Irene. Rather, the impact of the October Storm was attributable to larger and earlier snowfall than was forecast. CL&P also asserts that the AG ignored many of the steps CL&P did take in advance of the October Storm, such as placing all of its line crews and contractors oncall for the weekend. CL&P also notes that its EOC was opened at 2 p.m. on October 29, 2011, which was exactly the same time the State opened its center, and that the AG has not claimed the State was imprudent in not opening its center earlier. CL&P states that its requests for mutual aid during the October Storm were not late in comparison to other utilities, as no other utilities had requested aid during the October 29, 2011, morning conference calls. Finally, CL&P notes the Liberty Report’s findings that the company’s requests for assistance had disappointing results for reasons that were mostly beyond its control and that it is commonly accepted practice that utilities do not request assistance until they have actually experienced damage. CL&P Reply Brief, pp. 15-19.
  4. Page 54 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 54 of 125 Docket No. 11-09-09 Page 50 With regard to oversight of outside crews, CL&P notes Liberty found that the company closely coordinated its oversight process and that it worked well. CL&P claims that it assigned supervisors to manage each work crew, in a ratio of between one and five crews per supervisor. Finally, CL&P claims that it provided the necessary levels of support service to outside crews and that by the end of the October Storm, it had managed 2,917 crews, which was over 10 times its normal complement. Id., pp. 19-21. Regarding storm monitoring, Liberty noted that the October Storm was not in weather forecasts until October 27, 2011, two days prior to its occurrence, which did not give adequate time to prepare. Liberty concluded that the CL&P Storm Team lacks confidence in the present weather vendor and that it should address and correct issues which detract from confidence in that vendor. Liberty also determined that CL&P does not have an adequate pre-storm damage and resource prediction model to support planning and deployment decision making. With regard to pre-storm planning, Liberty determined that CL&P properly mobilized support resources and internal field response personnel prior to the storms. However, Liberty concluded that CL&P did not set the necessary level of external crew mobilization, and that it did not set up satellite staging areas in a timely manner. Id., pp. 49, 56. Upon review of the Liberty Report, the Authority determines that none of its findings or conclusions with regard to storm monitoring, preparations and external assistance issues are contradicted by the record in this proceeding. Thus, the Authority adopts the findings, conclusions and recommendations of the Liberty Report with regard to storm monitoring, preparations and external assistance. Below, the Authority addresses certain issues that are outside the scope of the Liberty Report or that require additional analysis. The October Storm clearly presented a challenge to CL&P to adequately prepare for the storm. A snow event was not predicted until two days prior to its arrival, and only a day before, predicted that the storm would bring heavy, wet snow. Furthermore, the magnitude of the damage to the system that resulted from the snow coincident with foliage existent on the trees was not fully predicted prior to this storm. For example, the December 1, 2011 Witt Report, noted that on the morning of the October Storm, no utilities in the Northeast had requested mutual aid in anticipation of the approaching storm. Witt Report, p. 21. The Authority believes that one of the greatest lesson to be learned from the October Storm is that decision making should be very conservative before an event of unknown impact. The Authority specifically notes the following conclusion of the Liberty Report: CL&P was not aggressive in seeking outside help in advance in the October Storm. There was enough of a threat late Friday and early Saturday to justify a specific request for outside help in addition to the 30 contract linecrews already acquired, especially in light of the experience with Storm Irene only 60 days before. Liberty Report, pp. 79 and 80.
  5. Page 55 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 55 of 125 Docket No. 11-09-09 Page 51 Based on the Liberty findings and lack of CL&P initiative in obtaining assistance in advance of the October Storm, the Authority determines that CL&P’s response to the October Storm was deficient. In the future, CL&P should place higher priority on taking aggressive action in anticipation of such events, including pre-staging resources and making earlier attempts to acquire resources. The Authority finds that CL&P should establish a heightened state of readiness and be able to clearly document that such a state exists. In conjunction with this expectation, the Authority will order CL&P to report on actions it has taken to establish a heightened state of readiness in anticipation of a major storm including an assessment of its own lineworkers and lineworkers from sister companies and contractors. CL&P shall also state the mutual assistance organizations to which it belongs and the resources likely available from those organizations. The Authority requires that the primary emphasis of this report focus on those resources that are likely to be available during the first 48 hours of a major storm event to assist in efforts to ensure public safety. The Authority will also order the company to demonstrate its efforts to establish a heightened state of readiness. Recommendations EPP-10 and EPP-12 of the Davies Report already relate to this concern; however, the Authority finds that the benefits of such a heightened level of preparedness to public safety are great enough to warrant implementation. The Authority also requires that this report be filed by August 8, 2012, to coincide with its review of the Emergency Plan submittals required by statute and with the prime hurricane season and following winter period. The stated resources relied on in this report should be generally available annually from July 1 through the following March 31. The Authority notes that utilities heavily rely on mutual assistance during major storm events. The Authority also notes the CL&P consultant recommendations that CL&P explore joining mutual assistance groups further away from Connecticut. Although the Authority agrees that while this option should be explored, the emphasis should be placed on ways to improve the responsiveness of mutual assistance in nearby regions. In this regard, the Authority finds that Liberty Report Recommendations VIII-CL&P-1 and VIII-CL&P-2 provide guidance to improve mutual assistance. CL&P reported that discussions are underway at various organizations on ways to improve the mutual assistance process. Because of the importance of this issue and its relationship to the heightened state of readiness concept above, the Authority will order CL&P to report on its efforts to improve the mutual aid process. 7. Damage Assessment CL&P states that both its consultant’s report and the Liberty Report identified opportunities for improvement in its damage assessment process, including its Outage Management System and use of technology improvements to facilitate the information gathering and reporting process. CL&P Brief, p. 25. The AG states that, although CL&P had a defined process for conducting damage assessments, it was not executed well. The AG cites Simsbury and Ridgefield as towns that were unable to obtain accurate damage assessments for many days after the October Storm. The AG states that damage assessments were not reported in a timely manner and not consistently used to plan restoration activities and prioritize work.
  6. Page 56 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 56 of 125 Docket No. 11-09-09 Page 52 Finally, the AG states that CL&P’s failures with respect to the damage assessment process were largely the consequence of not having a robust training and certification program for non-line damage assessors/patrollers. AG Brief, pp. 15-17. Liberty found that CL&P has in place a basic structure of a centralized damage assessment process, but that the company did not use damage assessment data on a system-wide basis to estimate resource requirements. Liberty also found that the damage assessment process was inconsistently applied at the district levels. According to Liberty, CL&P has a good plan for updating outage restoration status, but that it did not perform this function well during the 2011 Storms. Liberty Report, pp. 89 and 90. Upon review of the Liberty Report, the Authority determines that none of its findings or conclusions with regard to damage assessment issues are contradicted by the record in this proceeding. Thus, The Authority adopts the findings, conclusions and recommendations of the Liberty Report with regard to damage assessment. 8. Post-Storm Activities The Liberty Report found that CL&P has a good plan for conducting post-storm activities and performed well in all respects. However, Liberty also found that there is opportunity for improvement in the post-storm critique process. Liberty Report, p. 177. The Authority determines that none of its findings or conclusions with regard to post storm activities issues are contradicted by the record in this proceeding. Thus, the Authority adopts the findings, conclusions and recommendations of the Liberty Report with regard to post storm activities. 9. Lineworker Staffing CL&P requests the Authority find that the company’s staffing levels are appropriate, or that it defer analysis of this issue to an appropriate docket in which rates can be amended or rate deferrals can be authorized. CL&P Brief, p. 32. The OCC states that CL&P’s lineworker count has decreased from 744 in 2006 to 704 in 2011, and that its count peaked at 774 in 2008. The OCC also asserts that a large number of lineworkers are expected to retire in the next five years and the company has no clear plans to replace them. By allowing attrition of its lineworker staff, CL&P may have diminished its capacity to respond to storms with in-house resources, and placed first responders and the general public at greater risk. Accordingly, the OCC requests that the PURA conduct a review of lineworker staffing levels, require CL&P to submit periodic reports and require the company to conduct periodic studies of lineworker resources. OCC Brief, pp. 51-53. The Liberty Report found that CL&P’s lineworker staffing level is reasonable. Liberty states that while CL&P has a slightly high ratio of customers per lineworker, it is significantly lower on miles of distribution line per lineworker. Liberty also notes that utilities-base lineworker staffing on the level of normal revenue and maintenance workload, routine storm requirements, and productivity and process improvements, not on major outage response. Liberty Report, pp. 167 and 168.
  7. Page 57 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 57 of 125 Docket No. 11-09-09 Page 53 The Authority supports the conclusions of the Liberty Report on lineworker staffing, as it relates to non-major storm conditions. The Authority agrees with the premise of the OCC’s concern, which, at its core, is a concern over the lineworker resources that can be brought to bear during the initial phases of a major storm event. As discussed previously, the Authority below orders the company to report on the various resources that would be available to it in a major storm. The Authority believes this approach comprehensively addresses concerns over staffing issues as they relate to major storms. Furthermore, the Authority will further analyze lineworker staffing in Docket No. 12-06-09 as required by Public Act 12-148. C. UNITED ILLUMINATING 1. Effect of Storms on UI Customers a. Tropical Storm Irene Tropical Storm Irene caused a peak outage of 143,873 customers at noon on August 28, 2011. Due to that storm, 210,332 total outages took place affecting 66 percent of UI’s 319,124 customers. Irene dropped three to six inches of rain and caused significant damage due to fallen trees and flooding along the coast line and rivers. Eight days later on September 5, 2011, UI’s Storm Center Operation was deactivated and turned over to the Operations Dispatch and service to the last affected customers were restored. UI Responses to Interrogatories EL-1 and EL-4. The following chart shows the history of UI customer outages due to Tropical Storm Irene. UI Outage Curve for Tropical Storm Irene August 27, 2011 to September 6, 2011
  8. Page 58 of 125

    UI Tropical Storm Irene report filed October 4, 2011 in Docket No. 86-11-18. 9/6/2011 0:00 9/5/2011 18:00 9/5/2011 12:00 9/5/2011 6:00 9/5/2011 0:00 Docket No. 11-09-09 9/4/2011 18:00 9/4/2011 12:00 9/4/2011 6:00 9/4/2011 0:00 9/3/2011 18:00 9/3/2011 12:00 9/3/2011 6:00 9/3/2011 0:00 9/2/2011 18:00 9/2/2011 12:00 9/2/2011 6:00 9/2/2011 0:00 9/1/2011 18:00 9/1/2011 12:00 9/1/2011 6:00 9/1/2011 0:00 8/31/2011 18:00 8/31/2011 12:00 8/31/2011 6:00 8/31/2011 0:00 8/30/2011 18:00 8/30/2011 12:00 8/30/2011 6:00 8/30/2011 0:00 8/29/2011 18:00 8/29/2011 12:00 8/29/2011 6:00 8/29/2011 0:00 8/28/2011 18:00 8/28/2011 12:00 8/28/2011 6:00 8/28/2011 0:00 8/27/2011 18:00 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 58 of 125 Page 54 Customers Out by Hour 160000 140000 120000 100000 80000 60000 40000 20000 0
  9. Page 59 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 59 of 125 Docket No. 11-09-09 b. Page 55 The October Storm The October Storm caused a peak outage of 19,565 customers on October 30, 2011. Due to that storm, 52,344 outages affected 16.4 percent of UI’s customer base. On November 2, 2011, service to all affected customers’ service was restored. UI Response to Interrogatory EL-16, p. 2. The following chart shows the history of UI customer outages due to the October Storm: UI Outage Curve for the October Storm October 29, 2011 to November 3, 2011 Customers Out by Hour 30000 25000 20000 15000 10000 5000 11/3/2011 0:00 11/2/2011 21:00 11/2/2011 18:00 11/2/2011 15:00 11/2/2011 9:00 11/2/2011 12:00 11/2/2011 6:00 11/2/2011 3:00 11/2/2011 0:00 11/1/2011 21:00 11/1/2011 18:00 11/1/2011 15:00 11/1/2011 9:00 11/1/2011 12:00 11/1/2011 6:00 11/1/2011 3:00 11/1/2011 0:00 10/31/2011 21:00 10/31/2011 18:00 10/31/2011 15:00 10/31/2011 9:00 10/31/2011 12:00 10/31/2011 6:00 10/31/2011 3:00 10/31/2011 0:00 10/30/2011 21:00 10/30/2011 18:00 10/30/2011 15:00 10/30/2011 9:00 10/30/2011 12:00 10/30/2011 6:00 10/30/2011 3:00 10/30/2011 0:00 10/29/2011 21:00 10/29/2011 18:00 10/29/2011 15:00 10/29/2011 9:00 10/29/2011 12:00 10/29/2011 6:00 10/29/2011 3:00 10/29/2011 0:00 0 UI October Storm report filed December 19, 2011 in Docket No. 86-11-18. 2. The Liberty Report Findings The Liberty Report indicated that the effect of both Tropical Storm Irene and the October Storm on UI was not as severe as experienced by CL&P. This is due to UI’s smaller and more compact service territory. Liberty concluded that the following items were beneficial aspects of UI’s performance: 1. UI was well organized in its response to the two storms; 2. UI proactively communicated with the media, public officials, customers, and the public before, during, and after the storms;
  10. Page 60 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 60 of 125 Docket No. 11-09-09 Page 56 3. UI managed the alert and mobilization processes well in both storms; 4. UI has an aggressive distribution-pole groundline program; and 5. UI used automatic meter reading technologies to communicate with installed meters during the storm to confirm restoration status. Liberty Report, p. 2. Liberty identified the most significant aspects of UI’s performance that need improvement as: 1. UI could not handle the large volume of customers trying to communicate with the company during the Tropical Storm Irene; 2. The results of UI’s efforts to procure outside resources were disappointing; 3. UI could not provide restoration estimates or restoration status to customers in a timely manner; 4. UI management did not have proper control over the Cut/Clear, Make Safe work done with the towns; 5. Hazard trees contributed to the effects of the storms; and 6. UI trims trees on single-phase circuits every eight years. Liberty Report, p. 2. 3. Customer Communications UI’s customer service call center, located in New Haven, undertook a number of measures prior to both storms so as to respond to expected high call volume. Numerous storm preparation meetings to discuss items such as staffing, resources, logistics, transportation, and housing were held in advance of the two storms. UI Responses to Interrogatories CSU-1 and CSU-18. In addition to these meetings, UI also secured training resources to train non-traditional call center personnel, secured headsets for the additional phone answering resources, and readied a back-up call center location in Shelton in the event that call center resources needed to be relocated. Id. In direct response to Tropical Storm Irene, UI also enacted other preparations. These preparations included actions such as establishing a dedicated phone line for employees to call in and receive updates concerning work schedules, establishing a database of employees’ names and contact information to ensure that there was access to resources outside of the Customer Care Center that could assist during the storm, and providing the call center with a list of municipal liaisons assigned within the service territory. UI Response to Interrogatory CSU-1. In addition to these measures, on August 27, 2011, an outbound message was placed to all UI customers coded as “medical,” advising them of the situation and the importance of having a contingency

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)