Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf
6 pages match
  1. Page 64 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 64 of 125 Docket No. 11-09-09 Page 60 should present customers with the option to waive their privacy rights under HIPAA so that their information can be shared with their town, the Red Cross or any other relevant state agencies or first responders; and, (4) for those customers who have waived their HIPAA privacy rights, contact information be shared with the emergency operations center of that customer’s home town for additional monitoring and any necessary followup action. Id., pp. 46 and 47. According to UI, there are 5,521 customers that are coded either as Serious Illness or Life Support/Life Threatening. A customer coded as Serious Illness means that the customer is seriously ill, but not having electric service would not endanger their life. A customer coded as Life Support/Life Threatening means that the customer has a condition that would endanger their life if electric service was terminated. UI Late Filed Exhibit No. 74. Presently, when a customer informs UI that there is a medical condition in the household, UI sends a certification form to determine if that customer has either a Serious Illness or Life Threatening/Life Support issue. The current form used by UI includes a request for a telephone number, but in light of the recommendation from the OCC, UI has proposed a revised form which will include a primary and secondary telephone number as well as an e-mail address. UI Late Filed Exhibit No. 73. Three outbound calling campaigns were conducted during this storm, August 27, 2011, August 31, 2011, and September 3, 2011. The first campaign on August 27, 2011, was conducted pre-storm to approximately 4,400 customers coded as medical. The other two outbound calling campaigns were conducted to approximately 3,200 customers coded as medical as a joint effort with some towns in UI’s service territory.25 UI Response to Interrogatory OCC-147. UI also provided data on the success rate of its outbound calling campaign to customers coded as medical during Tropical Storm Irene. According to the data, for the first two campaigns, UI was successful in reaching no more than 66% of their medically coded customers. During the third campaign, UI was successful in reaching 82% of their medically coded customers. UI Late Filed Exhibit No. 71. There are no data to suggest that having secondary contact information on the medical certification form would have improved upon UI’s success rate in reaching its customers coded as medical. However, the outbound campaigns conducted by UI were done via an automated process. Tr. 4/30/12, pp. 1945 and 1946. The Authority agrees with the OCC’s recommendation that secondary contact information be included on the medical certification form. Further, it approves the revised medical certificate submitted by UI for use on an ongoing basis. The Authority will also order utility companies that utilize the medical certification form to revise their current form in use to include secondary contact information. In regard to having the information updated on an annual basis, the Authority notes that this recommendation should not impose any additional burden on utility companies given the requirements of Conn. Agencies Regs. § 16-3-100(e)(3)(B).26 25 The participating towns were New Haven, West Haven, Stratford, Shelton, Orange, North Branford, Milford, Hamden, Fairfield, Ansonia and Milford. 26 Conn. Agencies Regs. § 16-3-100(e)(3)(B) states: “(3) In cases where residential utility service is continued pursuant to a serious illness certificate or life threatening situation certificate, the customer shall: (B) renew the serious illness certificate or life threatening situation certificate no later than the last day of the period specified by the physician as the length of the illness or life threatening situation, provided, however, that if the physician has failed to specified the length of the illness or life
  2. Page 65 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 65 of 125 Docket No. 11-09-09 Page 61 UI disagrees with the OCC’s second recommendation that during a prolonged outage the EDC contact customers on an individual basis that are known to be without power. UI claims that during a storm event it would not have the resources available to check on the safety of individual customers, but would agree to share the customer information with the relevant town or Red Cross official who might be better suited to perform this action. UI Late Filed Exhibit No. 72. The Authority recognizes the recommendation of the Governor’s Report of the Two Storm Panel regarding the needs of vulnerable citizens. However, the Authority is unsure if tasking an EDC or other utility company with contacting customers on an individual basis to ensure that the customer is safe during such an event is an appropriate allocation of their resources. The Authority is also not prepared to order public service companies to offer customers the option to waive their privacy rights under the HIPAA law so as to facilitate the sharing of information. Additionally, the Authority does not know whether waiver of HIPAA privacy rights is permissible. Until further documentation is provided as to the mechanics of this recommendation, the Authority is unwilling to endorse it. However, the Authority notes that during the 2011 Storms, when CL&P contacted a portion of its medically coded customers, it offered an option to share the customer’s name and telephone number with the Red Cross if that customer believed they required additional assistance. CL&P Late Filed Exhibit No. 42, Tr. 4/23/12, pp. 1061 and 1062. The Authority believes that CL&P’s customer contact procedure for its vulnerable customers can be an effective substitute until the Authority has more information regarding HIPAA. Accordingly, the Authority will order UI to investigate the feasibility of providing this information to the Red Cross, which may be better situated to contact customers on an individual basis. a. Municipal & Other Utility Company Communications According to UI, its Municipal Liaison program has been in existence for at least two decades, but it was not until early 2010 that increased training and attention was provided. Tr. 4/30/12, pp. 1953 and 1954. UI has an established process to develop a list of company personnel with the necessary skills to act as town liaisons. That list is further divided into individual liaisons assigned to specific municipalities based on their skills, experience and existing contacts within the municipality. It is UI’s intention that staff assigned as municipal liaisons remain the same from storm to storm so that relationships, experience and consistency can be developed. UI reviews the list annually and on an as-needed basis during the year. At a minimum, two UI employees are designated to a municipality in order to provide 24 hour coverage. UI Response to Interrogatory CSU-24. However, UI will also designate back up staff, so that depending on the size of the municipality, the total number of liaisons can range from three to five employees. Tr. 4/30/12, pp. 1964 and 1965. Some of the characteristics that UI looks for in selecting a town liaison include the employees experience in customer service, interpersonal and communication skills, experience with the municipality and UI’s distribution system, the ability to work under pressure and extreme conditions, and if the employee is a resident of the town. UI Response to Interrogatory CSU-25. threatening situation or if the physician has indicated that the length of the illness or life threatening situation is not readily available, then the serious illness or life threatening situation certificate shall be renewed every 15 days. Each renewal certificate shall be forwarded to the company.
  3. Page 66 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 66 of 125 Docket No. 11-09-09 Page 62 UI’s town liaison personnel have numerous duties and responsibilities once designated and assigned. During the 2011 Storms, the duties and responsibilities were similar. A small sampling of these duties and responsibilities includes reporting to the municipal emergency operations center, providing a direct communications link between the municipality and UI’s EOC, working with the municipality to prioritize emergency locations and communicate this information back to UI, communicate special situations, requests, and UI’s progress on emergency locations, providing daily updates to UI’s EOC on the restoration status of pre-designated town priorities, keeping the municipality updated on restoration progress, and in some cases, working directly in the field with local public safety crews. UI Response to Interrogatory CSU-28. UI supports its town liaison personnel by providing ongoing training, some of it mandatory. Examples of the mandatory training provided include an annual municipal liaison class, UI’s Outage Management System, UI’s training seminar for municipal officials, and if available through the municipality, town liaisons participate in a municipal EOC training exercise. UI Response to Interrogatory CSU-32. UI also intends to implement a new training program for its town liaison staff that it has called “Electricity 101.” This new training will focus on items such as the system infrastructure and distribution system, safety, and future upgrades. Tr. 4/30/12, pp. 1954 and 1955. Prior to the Storms, UI also held refresher training for its municipal liaison staff on June 17, 2011 and June 23, 2011. UI Response to Interrogatory AG-152. Besides training for its town liaison staff, UI has also held joint training with municipal officials. In August 2010, UI hosted a forum to discuss storm response and their towns. This forum was designed to provide municipalities with critical information that they would require during a storm or outage situation. UI explained that this forum also presented an opportunity for municipal officials to speak and interact with the town liaisons, account managers, electric system managers, and restoration managers. UI stated that this forum was attended by over 150 people representing all 17 municipalities it serves. UI expects to conduct this forum on a bi-annual basis. UI Response to Interrogatory CSU-33. According to UI, its municipal liaisons are required to meet with their local counterparts at least once per year. Tr. 4/30/12, p. 1954. Prior to Tropical Storm Irene, several municipalities in UI’s service territory held pre-storm meetings and all were attended by UI’s municipal liaison personnel. UI Response to Interrogatory CSU-27. UI noted that not all municipalities it serves held pre-storm meetings, but their town liaison staffs were in contact with their respective town officials prior to Tropical Storm Irene. The purpose of this contact was to obtain information regarding the status of town emergency operation centers. UI also provided via e-mail to all of the municipalities its serves, its storm contingency planning and latest weather status prior to Tropical Storm Irene. UI stated that prior to the October Storm, no municipalities held pre-storm meetings, but the same procedures carried out for Tropical Storm Irene were implemented. Id. UI provides its town liaison staff with the number and type of crews assigned to a municipality on a daily basis once the restoration process has begun. UI also provides the town liaison staff with crew assignments for daily restoration activities after the initial storm assessment and work packets are developed. UI Response to Interrogatory CSU-30. While town liaison staff does not have the ability to speak directly to UI crews in the area they are assigned to, the liaison staff can request a dedicated cutclear/make-safe crew. UI Response to Interrogatory CSU-31. The municipal liaison
  4. Page 67 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 67 of 125 Docket No. 11-09-09 Page 63 staff works with their municipal officials to develop a list of make safe locations which is then provided to the dedicated cut-clear/make-safe crew. In the case of an emergency situation, the municipal liaison contacts UI’s Lead Municipal Liaison who will then coordinate with other UI staff to dispatch a crew to the requested location. UI Response to Interrogatory CSU-29. Overall, UI’s municipal liaison program was generally well received. The AG stated that it found UI’s program to be more refined than the program offered by CL&P. AG Brief, p. 19. Liberty noted that while UI was able to implement and apply its communication plan with its municipalities for Tropical Storm Irene, there were still areas of the program where improvements could be made. Liberty described some of the lessons learned by UI from this storm: The volume of emergency calls from municipal emergency operations centers through municipal liaisons was much higher than anticipated during the storm. This made it challenging to communicate with UI’s Storm Center to track and update the status of these calls. More than half of the towns served by UI had never opened an emergency operations center prior to Tropical Storm Irene. Because of this, many of the towns had not been able to coordinate critical infrastructure priorities with UI. The municipalities expressed a need to have more control over the assignments provided to UI crews along with a need for better coordination with local public works and tree removal crews. Municipalities requested that estimated restoration times be provided sooner. Due to customers’ inability to reach UI’s call center, municipalities were getting many calls from their residents regarding restoration times. Municipal officials wanted more information on the location of UI crews working in their towns and information on the circuits that were out. The provision of a map with trouble spots would be very helpful to the municipal officials as well. Liberty Report, pp. 142-144. Liberty noted that UI’s municipal liaison program worked more smoothly during the October Storm due to changes implemented based upon the lessons learned from Tropical Storm Irene and the familiarity gained by the town liaison staff in the locations they were serving during that time. Id. Liberty also found that overall, UI’s municipal liaison program enhanced communications between towns and utilities during both storms, but that there was room for improvement. Liberty Report, p. 151. Liberty recommended that UI enhance the municipal liaison program to create a more consistent approach to keeping community leaders and municipal officials better informed of storm restoration data. Liberty Report, p. 153.
  5. Page 68 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 68 of 125 Docket No. 11-09-09 Page 64 UI recognized that there were areas of the municipal liaison program that could be improved. UI stated that it has responded to requests from its municipalities to increase the number of town priorities/critical facilities. Each town served by UI can now identify 10 critical facilities that will receive priority restoration. UI Brief, pp. 12 and 13. UI also has agreed with a number of recommendations made by the OCC regarding the municipal liaison program. For instance, UI plans to participate in a July 28, 2012 emergency management planning exercise with municipal officials. UI agrees that town liaisons should thoroughly understand the towns they are working in and is equipping its liaison staff with town priority maps. UI also agreed that its municipal liaison staff should develop working relationships with utility operations personnel before major outages occur. UI Late Filed Exhibit No. 72. UI also agrees with the Liberty recommendation to enhance the municipal liaison program to create a more consistent approach to keeping community leaders and municipal officials better informed and intends to incorporate this into its preparedness and training of its municipal liaison staff. Id. Also, UI is in the process of meeting with each of its municipalities so it can expand post-storm follow-up to improve the capture of feedback regarding the quality of its municipal liaison program. UI May 14, 2012, Correspondence Regarding Comments of the Liberty Consulting Group. Based upon these improvements that UI has either implemented or intends to implement, the Authority finds that UI’s municipal liaison program will continue to provide the necessary and critical communications to the municipalities that it serves. Regarding communications with other utility companies, UI notes that its municipal liaison process does not incorporate AT&T or other telecommunications entities. UI states that during the tri-annual Joint Utility meetings that are attended by all the utilities and pole attachers, emergency response numbers are reviewed and revised for each company. According to UI, these numbers are the contact numbers for each company or third party to be used during emergencies and storms. UI stated that in the event a large storm is predicted, it will contact each utility/pole attacher prior to the storm and provide to them a direct contact number for its EOC. UI will also offer space to each company at its EOC if they would like to send a representative. UI Response to Interrogatory CSU-35. 4. Liberty Recommendations Liberty identified the most significant aspects of UI’s performance that required improvement listed in the findings noted above. Id. UI agrees with all of the significant performance aspects needing improvement and has taken action to improve its future performance in all the areas identified. UI Late Filed Exhibit No. 72-1. The Authority adopts the Liberty Report findings and recommendations for UI with the exceptions described below. 5. Emergency Plans For at least six months prior to Tropical Storm Irene, UI was in the process of creating a 2011 EPP in order to update its 2006 plan. The 2011 plan was based on the
  6. Page 69 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 69 of 125 Docket No. 11-09-09 Page 65 National Incident Management System and included forming an incident command structure. Tr. 05/02/12, pp. 2432-2334. On August 22, 2011, UI conducted a tabletop exercise to review the 2011 EPP with its team leaders. However, on that afternoon, upon learning that Tropical Storm Irene was expected to hit the area, UI decided to implement the 2011 EPP. Id. Many assignments in the 2011 EPP were the same as in the 2006 EPP. Tr. 05/02/12, pp. 2432-2334. As a result of the early warning, UI initiated its restoration planning efforts on August 23, 2011. The preparation included storm team planning meetings, defining the potential damage impact, acquisition of additional line clearance and line construction crews, development of the specific storm staffing plan and schedules, restoration strategy development, communication planning and stakeholder contact, safety training, logistics planning, and system integrity activities such as returning the transmission and distribution systems to normal prior to the storm, substation inspections, and the cancellation of all planned work. UI Response to Interrogatory EL-1. Following the planning stage, UI pre-staged all storm responders by staffing all key substations and having all company storm personnel report for their assignments. Logistic needs such as pre-staging material at strategic locations throughout the service territory, procuring staging locations and accommodations for mutual assistance and contractor crews were also pre-staged prior to the storm in order to be able to utilize fully all available resources during the response. Id. Due to a late forecast of the October Storm, UI started to prepare for the October Storm on October 27, 2011, a day before the snowstorm. UI Response to Interrogatory EL-13-1. UI implemented the 2011 EPP and claimed that it worked effectively. Tr. 05/02/12, pp. 2432-2334. Liberty could not determine which EPP UI used during the 2011 Storms because the 2011 EPP that was due on June 1, 2011, was not filed until December 1, 2011. Liberty Report, pp. 24 and 25. Liberty commented that UI’s failure to have a definite plan for the responders was a confusing and negative factor in their response efforts. Id., p. 25. UI testified that although the 2011 EPP had not been filed with the Authority, the company implemented the 2011 EPP for the two storms because its employees were familiar with the plan. Tr. 5/2/12, p. 2433. Based on review of the UI chronological notes for the two storms and UI testimony, it appears to the Authority that UI implemented an EPP that was very similar to the 2011 EPP filed on December 1, 2011. UI Responses to Interrogatories EL-1 and EL-13. Liberty made recommendations to update the EPP sooner than every five years. Liberty Report, pp. 4 and 5, 25. UI indicated that it concurs with Liberty recommendations to modify the EPP. UI Late Filed Exhibit No. 72, p. 5. In light of enactment of Public Act 12-148, UI is required to file an updated EPP with the Authority by July 1, 2012, in Docket No. 12-06-11. The Authority will require that the Liberty recommendations to modify UI’s EPP be made in that proceeding.
  7. Page 70 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 70 of 125 Docket No. 11-09-09 6. Page 66 Preparedness Liberty determined that UI’s pre-storm planning actions properly mobilized the support functions and achieved full readiness status of the internal field response personnel. Liberty made no recommendations for storm preparations. Liberty Report, p. 58. The AG cited to UI’s testimony, where it stated that the last time the company conducted drills and exercises to practice the implementation of its EPP was in 2009 and it did not include practicing the management of large numbers of outside crews. Tr. 5/2/12, p. 2489. Prior to the 2011 storms, UI did not drill or exercised its 2011 EPP and its ICS. Id., p. 2483; AG Brief, p. 41. In addition, although UI annually conducted training for its liaisons, prior to the 2011 Storms, it had not conducted emergency drills or exercises to evaluate the performance of its liaisons. Tr. 4/30/12, pp. 2028 and 2029; 1978 and 1979. UI acknowledged that such training sessions would be extremely valuable in addition to its annual internal training sessions. Id., pp. 1978 and 1979. UI’s hands-on liaison training only occurred if a particular town was conducting its own exercise. Id., p. 2029. UI testified that its liaisons attend town drills when they occur. UI also testified that it should train with the towns at least once a year. Id., p. 1981. The State will be conducting a state-wide emergency drill at the end of July 2012, but not all towns will be participating in the drill with UI. Id., pp. 1979 and 1980. The Authority agrees with UI that emergency drills should be conducted at least once a year with each town regardless of who initiates the drill. UI should encourage all towns to participate in the upcoming state emergency drill and focus on the restoration of utility services, coordination of make safe work and communications with and through the company’s liaisons. 7. Restoration a. Staffing the EOC Due to the size and compact nature of the UI service area, the response was under the command and control of one incident manager who reported directly to UI executive leadership. The incident commander for both storms was the UI Director, Operations, an experienced utility operations veteran. Liberty determined that the UI emergency organization was well structured for its service area, and contributed positively to the restoration of electricity. Liberty Report, pp. 67 and 68. UI has a relatively small emergency organization due to the size of its service area. As a result, it easily communicated and accomplished alerts and mobilization. UI managed the alerts and mobilizations with the exception of being late in fully staffing the EOC in both storms. For Tropical Storm Irene, outages began increasing at 10:30 p.m. on August 27, 2011. Tropical storm force winds started at 2:00 a.m. on August 28, 2011, and continued until 10:00 p.m. that day. Full storm center staffing did not arrive until 6:00 a.m. that morning.
  8. Page 71 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 71 of 125 Docket No. 11-09-09 Page 67 For the October Storm, UI began to prepare on October 27, 2011. At 2:00 p.m. on October 29, 2011, the storm classification was increased to Level 3. Significant outages were occurring and the storm center was opened and the Wires Down Process was activated. Liberty recommends that UI change its practice to ensure that it opens the EOC prior to the onset of major events. Specifically, in the case of major events where advance notice is provided, such as a hurricane, or when there is enough advance notice to begin tracking the storm at least 12 hours in advance of the expected impact, UI should fully staff the EOC a minimum of 12 hours. Liberty Report, pp. 74 and 75. UI disagrees with this recommendation. UI Late Filed Exhibit No. 72-1, p. 5. UI testified that if it had staffed for Tropical Storm Irene at 10:00 a.m. on August 27, 2011, as recommended, there would be nothing that could have been done for the first 12 hours while waiting for the storm to hit. UI noted that there would have been a shift change at 10:00 p.m. and workers still would have been unable to do anything due to tropical winds occurring on Sunday morning from 2:00 a.m. to 10:00 p.m. As a result, staff could not be deployed until 10:00 a.m. at the earliest the next morning. Tr. 4/30/12, p. 2074. For the October Storm, UI opened its EOC on October 29, 2011, at 2 p.m., and ramped up its entire work force on October 30, 2011, at 6:00 a.m. Response to Interrogatory EL-13, Liberty Report, pp. 74 and 75, and Id., 2075. Because of the severe weather, workers could not go into the field. When the weather was calm, then the damage assessors went out. If UI had implemented its workforce 12 hours in advance of the time that its workers were to go out, there would have to had been another shift change. Tr. 4/30/12, p. 2075. The PURA finds that UI has presented a reasonable argument against fully staffing the EOC at least 12 hours before the storm. In this case, staffing 12 hours in advance would have resulted in a shift change at the time of storm impact and the inefficient use of a shift. The time to fully staff the EOC should be left to the judgment of the EOC managers who are monitoring storm conditions during the 12 hours prior to impact. In many major storms, it is common for weather conditions to stop or restrict restoration efforts for hours until after storm impact. In the opinion of the Authority, the start of the UI storm restoration was not affected by when it chose to fully man its EOC. Accordingly, the Authority will not accept Liberty’s recommendation to order UI to fully man its EOC 12 hours in advance of the arrival of a major storm. Rather, the Authority will examine this recommendation further in Docket No. 12-06-09 when other utilities can provide comment on their experience during the two storms. b. Damage Assessment The Damage Assessment guidelines in the 2011 EPP are essentially the same as those items in the 2006 EEP. UI performed well in evaluating the system damage in the field.
  9. Page 72 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 72 of 125 Docket No. 11-09-09 Page 68 UI’s Damage Assessment teams gathered notes and provided them along with maps to Classifiers who entered the data and printed packets for the work crews. UI entered all data manually. Liberty Report, p. 92. Job completion information from the field came back in batches. UI’s receipt of this information and updating its outage management system was labor-intensive and cumbersome causing delays in updating the restoration status. Liberty recommends that UI provide field crews with mobile data terminals to improve the process and increase the frequency of field feedback. Id., pp. 92 and 93. UI did not use the damage assessment data on a system-wide basis to estimate resource requirements. The current process does not collect or use this data. For the 2011 Storms, there was no process in place for totaling up damaged equipment for use in estimating resource needs. It is an industry best practice to use statistical damage assessment data to predict accurately overall resource requirements and associated system restoration timelines. Id., p. 93. Liberty recommends that a process be developed to use damage assessment information in a statistical manner for overall crew resource-requirement projections. This new function should improve data analysis in the damage assessment process. Id. UI agrees with the recommendation to strengthen the procedures to get regular, timely restoration status updates from crews in the field and has set this as an expectation of the field crews and as a management goal. UI Late Filed Exhibit No. 721, p. 5. c. Mutual Aid UI is a member of NEMAG and the Edison Electric Institute (EEI). Report, p. 81 Liberty On August 25, 2011, UI began to participate in NEMAG conference calls. At that time, all NEMAG participants were holding crews, including Hydro Quebec, in Canada. On August 26, 2011, UI requested 100 crews from NEMAG and requested another 200 crews between August 27, 2011 and September 1, 2011. UI Response to Interrogatory EL-1. UI relied heavily on NEMAG for help securing outside line crews. The results were disappointing and for the most part, beyond UI’s control. UI also inquired about help from states to the west, Kansas, Wisconsin, Indiana, and Missouri. Liberty Report, p. 82. Because both of the storms were regional in nature, neighboring utilities and mutual assistance groups were unable to provide help. The total outside help for Tropical Storm Irene was slightly over 50 line crews and 75 tree crews. The October Storm impact on UI was considerably less from Tropical Storm Irene. Consequently, UI did not need a large amount of outside resources. Id. Liberty notes that there are several key issues in the Mutual Assistance process that limits access to crews (e.g., in the interaction of the mutual assistance groups and political influence). The affiliation between operating companies is also a factor. Companies who once were more readily available to provide assistance are also now bound first to their affiliated companies. Id. Additionally, mutual assistance groups
  10. Page 73 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 73 of 125 Docket No. 11-09-09 Page 69 have agreements with their member companies that they will not send assistance outside the bounds of their respective groups until it is certain that the group will not need help. Also, it is a generally accepted practice that utilities will not request resources until it sustains damage. Id. Liberty recommends that UI explore joining NYMAG and Mid-Atlantic Mutual Assistance (MAMA) since they are in close proximity to the UI service area. UI should also explore joining groups that are less likely to be affected by the same storm, such as the Southeastern Electric Exchange, the Mid-West Mutual Assistance Group, and the Texas Mutual Assistance Group. Id., p. 83 UI agrees with Liberty’s recommendation and is currently working with NEMAG and EEI. UI Late Filed Exhibit 72-1, p. 5. d. Make-Safe Work Down wires created a public safety issue throughout the area during both storms. When requested by a municipality, UI provided a dedicated make-safe crew consisting of one line construction crew and one tree clearance crew to verify that wires were deenergized and also to de-energize live wires so town employees could move trees and open the roads safely. UI Response to Interrogatory EL-20. The make-safe crews worked under the towns’ EOC and not under UI’s dispatch. Liberty concluded that UI’s management of the make-safe assistance delayed restoration. Liberty Report, p.174. UI testified that a benefit of the make safe crews work in helping to open roads for public safety creates earlier access for damage assessors to access damage and for line trucks to get to critical areas earlier in the restoration process. Tr. 4/30/12, pp. 2081 and 2082. Liberty recommended that specific guidelines be establish for the make-safe work to be performed with the towns. Liberty also indicated there must be a clear understanding and agreement as to what UI will do in this area. Id., p.175. UI agrees with the Liberty recommendation and is working with the state, towns and other utilities to develop specific guidelines for Make-Safe work. UI Late Filed Exhibit No. 72-1, p. 5. 8. Other Issues Prior to the 2011 Storms, UI trimmed trees for three phase lines on a four-year cycle and for single phase lines on an eight-year cycle. Mid-cycle trimming was performed as needed based on circuit performance. Tr. 4/30/11, pp. 2091 and 2094. UI has proposed a four-year cycle for all of its distribution circuits. Id., date, p. 2091. UI is seeking the Authority’s approval in this proceeding to expand its clearance specifications and for a proposed enhanced tree trimming program that could include “blue sky” clearance, or eliminating all tree branches above its distribution lines. Id., pp. 2092, 2100 and 2101; AG Brief, p. 44. UI has proposed to increase horizontal clearances from 6 to 10 feet, below conductors from 5 to 8 feet and above conductors from 12 to 15 feet. UI Response to Interrogatory AG-17.

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)