Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf
6 pages match
  1. Page 7 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 7 of 125 Docket No. 11-09-09 Page 3 In this proceeding, the PURA examined a variety of concerns surrounding these storms including, but not limited to, utility company storm preparedness, storm restoration activities, mutual assistance, communication and coordination among utility company personnel, outside restoration personnel, the towns, communication with customers, utility infrastructure, poles, pole attachments, wires, cable television, telecommunications, cellular service outages, and vegetation management. C. WEATHER EVENTS In 1986, the Authority initiated a broad investigation of electric distribution company reliability. This investigation was preceded by an initial investigation into Hurricane Gloria in 1985 and Hurricane Carl in 1986. By Decision in Docket No. 86-12-03, Long Range Investigation to Examine the Adequacy of the Transmission and Distribution Systems of The Connecticut Light and Power Company and The United Illuminating Company, the PURA required numerous changes in the way electric utilities maintain their systems and reported to the Authority on such maintenance. In response to Hurricane Carl in 1986, the Authority also initiated a proceeding to specifically investigate utility performance in preparing for the storm and managing outage restoration following the storm. Decision dated May 12, 1987 in Docket No. 86-11-18, DPUC Review of Performance of UI, CL&P and SNETCO in Restoring Service After Storm Carl. In that Decision, the Authority ordered the electric companies to report on their performance after every storm that results in a major electric outage event. These reports provide information on company storm restoration responses, such as the steps taken in preparation for each storm, total customers affected, electric distribution company staff assisting in the storm, additional resources procured to assist with restoration, system damage statistics, and customer assistance statistics. In 1999, the Authority initiated a broad investigation of the electric utility companies’ performance during a summer heat wave that resulted in numerous outages to customers throughout the state. Decision dated July 26, 2000 in Docket No. 99-08-01, DPUC Investigation into Electric Capacity and Distribution. That investigation determined that the primary reason for the outages was systematic transformer overload due to inadequate sizing (rating). Decision, p. 1. This investigation resulted in a number of findings and recommendations for future improvements in performance; primarily, that the Electric Distribution Companies (EDCs) implement improved methodology for forecasting loading on equipment. Id. More recently, the Authority initiated an investigation into a major “Nor’easter” that occurred in March 2010 which caused widespread, persistent outages primarily in the southwestern portion of the State. Decision dated December 1, 2010 in Docket No. 10-03-08, Investigation of the Service Response and Communications of The Connecticut Light and Power Company (CL&P) and The United Illuminating Company (UI) following the Outages from the Severe Weather over the Period of March 12 through March 14, 2010. The Authority retained a consultant to assist its review of the EDCs performance and their proposed corrective actions. After an exhaustive investigation, the Authority found numerous areas for improvement in electric utility outage restoration practices and communications, and ordered such improvements.
  2. Page 8 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 8 of 125 Docket No. 11-09-09 Page 4 The recommended actions included implementation of additional training for certain emergency response personnel, enhanced after-action reviews, and additional electronics capabilities in line trucks. D. CONDUCT OF THE PROCEEDING By Notice of Hearing dated February 23, 2012, the Authority conducted public hearings on March 19, 2012, March 20, 2012, March 21, 2012, March 22, 2012, April 12, 2012, April 23, 2012, April 24, 2012, April, 25, 2012, April 26, 2012, April 30, 2012, May 1, 2012, May 2, 2012, May 3, 2012, May 21, 2012, May 22, 2012, May 23, 2012, and May 24, 2012. By Notice of Close of Hearing dated June 28, 2012, the hearing in this matter was closed. A Draft Decision was released to the public on July 17, 2012. All Participants were given the opportunity to submit written exceptions. E. PARTICIPANTS The PURA recognized the following as participants in this proceeding: The Connecticut Water Company; Department of Homeland Security/Office of Emergency Communications; Sprint Nextel Corporation; Jewett City Water Company; Hazardville Water Company; the Office of Consumer Counsel; Comcast Hartford; Olmstead Water Supply Company, Inc.; Judea Water Company; Tyler Lake Water Company; Verizon Wireless; Town of Wilton; AT&T Connecticut; Towns of Newtown/Redding; FiberTech Communications; QualComm-Enterprise Services; Cablevision Systems Corp.; Local 420 – IBEW; Comcast Cable; Charter Communications; Charter Communications Entertainment 1; Metrocast Communication; the Office of the Attorney General; The United Illuminating Company; Connecticut Natural Gas Corporation; The Southern Connecticut Gas Company; Old Newgate Ridge Water Company; Aquarion Water Company of Connecticut; Valley Council of Governments; New England Cable and Telecommunications Association, Inc.; Connecticut Conference of Municipalities; Verizon New York, Inc.; One Communications; Zagorsky, Zagorsky & Galske, P.C.; Ztar Mobile, Inc.; Preston Plains Water Company; CWA-Local 1298; Coxcom, LLC d/b/a Cox Communications; Thames Valley Communications, Inc.; Conexions, LLC; Statewide Video Advisory Council; Town of Ridgefield; Consumer Cellular, Inc.; Kevin McCarthy; Alltel Communications, Inc.; Total Call Mobile, Inc.; Yankee Gas; Heritage Village Water Company; Torrington Water Company; The Connecticut Light and Power Company; TMobile USA, Inc.; Valley Water Company; Avon Water Company; West Service Corporation; and Cablevision of Connecticut, LP. F. PUBLIC COMMENT The Authority held 17 hearings to investigate the public service companies’ responses to the 2011 storms. On March 19, 2012, the President of the Communications Workers of America (CWA) Local 1298, representing The Southern New England Telephone Company d/b/a AT&T Connecticut (AT&T or AT&T Connecticut) workers gave public comment. He commented that due to layoffs, AT&T no longer has the workforce to sufficiently maintain the lines and equipment as it had in years past. Therefore, the equipment could fail due to lack of maintenance. Tr. 3/12/12, pp. 14-23. On May 1, 2012, the
  3. Page 9 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 9 of 125 Docket No. 11-09-09 Page 5 CWA commented in opposition to having a single pole administrator as proposed by UI and CL&P, citing that this would adversely impact the AT&T lineman or outside technicians. The CWA states that the skill sets required to perform telephony functions are unique to the communications industry and consumers’ telephone service would be at risk if this proposal is adopted. Tr. 5/1/12, pp. 2140 and 2141. The Authority’s Consumer Service Unit also received approximately 1,000 letter and email complaints against the utility companies with regard to the 2011 Storms, many of which were presented to the Authority from Governor Malloy’s office. An additional 1,000 complaints were received via telephone. The majority of the customers who were affected by the 2011 Storms were concerned with the length of time it took the companies to restore service and the difficulty receiving information from the companies. Several customers stated that the companies were unprepared, mismanaged, and had underestimated the magnitude of the storm by not having sufficient repair crews available. Consumers believed that the lack of information provided by the companies left them unable to prepare for a longer than normal outage. Customer comment varied, but frustration regarding the amount of time the utility companies required to repair and restore service was a common theme. Several customers mentioned that Connecticut has the highest electric rates in the country and therefore, warrants better customer service. Customers suggested ways to help avoid future outages such as trimming trees and burying power lines. Others felt that customers with wells or septic systems should have their restoration of service prioritized because of the public health issues. G. TESTIMONY BY ELECTED OFFICIALS During the April 26, 2012 and May 24, 2012 Hearings, six elected officials from Connecticut towns in CL&P’s service territory provided comments on their experiences during the outage period and interaction with CL&P. 1. Ms. Mary A. Glassman, First Selectman of Simsbury Ms. Glassman indicated a desire to improve in the reliability of restoration estimates as the Town of Simsbury (Simsbury) relies on them to inform residents and to provide staffing and shelter needs. Tr. 4/26/12, p. 1736. She noted that she was seeking improvements in the make safe system and the need to reopen roads as soon as possible for emergency vehicles accessibility. Id., p. 1737. Ms. Glassman was also concerned with the change in CL&P liaisons. Tr. 4/26/12, p. 1753. Ms. Glassman noted that as of November 4, 2011, Simsbury still had 30 streets that were inaccessible to emergency vehicles. She indicated that there was considerable confusion in that Simsbury was not told when crews were going to arrive. She commented that the town would have its crews available, and then when line crews did not arrive, the town crews were sent home. After the town crews’ departed, then the CL&P crews would arrive. Id., p. 1756. In this regard, she noted a loss of real opportunity to clear some roads. Additionally, Ms. Glassman expressed concern over the time estimates for restoration. She noted that even though the majority of Simsbury was still without power and CL&P was providing its Sunday restoration estimates, these
  4. Page 10 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 10 of 125 Docket No. 11-09-09 Page 6 projections created added stress to town residents because Simsbury was disseminating wrong information. Id., p. 1758. She also noted that had Simsbury relied on those estimates, it would not have had enough supplies in its shelter to sustain a longer shelter event. Id. Ms. Glassman noted it was not until the Thursday after the Saturday storm when the National Guard cut through the trees, that the town saw any major improvement. Id., p. 1765. Ms. Glassman advocated being better prepared next time, building relationships between liaisons, and developing standard ways of communicating. Id., p. 1785. She expressed the need for accurate information, noting that where it works best is when a crew is assigned to working alongside public works so one is not duplicating or wasting time. Id., p. 1786. 2. Mr. Matthew B. Galligan, Town Manager of South Windsor Mr. Galligan expressed a concern over discussion in the Davies Report1 of the possibility of having a regional liaison because different towns were on different communication systems. Mr. Galligan was disappointed with the make-safe process, noting that of the 135 roads blocked, town crews cleared all but 39 roads within a 48hour period. He noted that it was not until the seventh or eighth day that crews came from Ontario and Ohio who knew what they were doing and worked well with the town. Tr. 4/26/12, p. 1732. Mr. Galligan cited instances of miscommunication, once after Tropical Storm Irene involving a company that makes plasma, that needed power because it only had a 48 hour supply of plasma left for all the hospitals in Connecticut. According to Mr. Galligan, the town sent a work crew to clear debris and waited for CL&P, who did not show up for eight hours. Mr. Galligan also noted that there were two times when it risked its emergency crews to get somebody to the hospital despite the downed lines which may have been live. Id., p. 1735. Mr. Galligan noted a frustration in having been assigned a new liaison by the company who was not as familiar with town priorities. Mr. Galligan indicated that the town trucks have GPS, and knew where the wires were down. According to Mr. Galligan, the town had all the information from day one and kept relaying it to the liaison but it was not until four or five days later that the town actually got a crew. Tr. 4/26/12, pp. 1770 and 1771. Mr. Galligan recommended that CL&P crews be embedded with the town public works crews. Mr. Galliagan did not think the make-safe effort delayed the restoration because his town did not have make safe roads until after service restoration. Id., p. 1792. 3. Mr. Steven R. Werbner, Town Manager of Tolland Mr. Werbner indicated that the Town of Tolland (Tolland) experienced 100% outages in both storms. Mr. Werbner noted that Tolland knows its priorities for restoration, in storms that require the intervention of others, Tolland’s planning and preparation is put in abeyance until it can get the cooperation of others. Tr. 4/26/12, p. 1739. Mr. Werbner asked for systemic change that would require utility companies to coordinate their resources with the towns to ensure an appropriate response to 1 CL&P conducted its own internal review by Davies Consulting.
  5. Page 11 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 11 of 125 Docket No. 11-09-09 Page 7 significant events. Id., p. 1740. Mr. Werbner noted that a method is needed to ensure that utility companies are held accountable for their actions, as local government officials are held accountable by their electorate. Id., p. 1741 Mr. Werbner testified that Tolland was concerned with an allocation of resources. Tr. 4/26/12, p. 1743. He noted that his town had crews that were willing to work around the clock in order to open streets but were useless because they could not access the streets because trees were entangled with wires. Id., p. 1745. It was not until Tuesday of the second week before all the downed wires were taken care of so that roads could be cleared. Id., p. 1751. He also noted that the town had 25 roads that were not passable until Tuesday of that second week. Id., p. 1752. Mr. Werbner agrees that the regional liaison concept does not work and it is impractical to think that a liaison is going to rotate from community to community and be effective. Tr. 4/26/12, p. 1781. Mr. Werbner claimed that a liaison can be of great assistance if it is given some authority to be able to work with operations to direct crews where they are needed based upon the information that they are receiving from the towns. Id. 4. Ms. Natalie Ketcham, First Selectman of Redding Ms. Ketcham indicated that since she has been Redding’s First Selectman, the period of time that Redding was without power following the 2011 Storms were the worst two weeks of her tenure. Tr. 5/24/12, p. 2937. She noted that Redding was without power following both storms, and it took a full week in each case to be restored. Id., p. 2938. She commented that in the aftermath of Tropical Storm Irene, CL&P had an employee assigned to town hall every day to provide information. However, the employees could not answer questions with any certainty. Ms. Ketcham claims that they did not return following the October Storm, which left Redding employees and resident volunteers alone with little or no reliable information from the utility on restoration activities. Id. Ms. Ketcham also believed that CL&P did not act wisely by failing to control their resources and refusing to vest decision-making authority with its field managers. Id., p. 2939. Additionally, Ms. Ketcham expressed concern over CL&P’s communication. In particular there was no radio communication between company trucks, as well as the lack of credibility of the information once it was passed. She noted one situation where trucks were sitting at the side of the road because they came from out of state and did not know where they should be working. Also, there was an enormous amount of down time. Tr. 5/24/12, p. 2955. Ms. Ketcham was further concerned that technology seemed to be very rudimentary from the standpoint of the company. Id., p. 2956. 5. Ms. Patricia Llodra, First Selectman of Newtown Ms. Llodra testified that the 2011 Storms challenged her abilities as a town official beyond anything previously experienced. Tr. 5/24/12, p. 2941. Ms. Llodra claimed that Newtown was a town virtually without power for one week or more following each storm. Ms. Llodra related that 2,000 homes were still inaccessible to emergency vehicles on day 4 following the October Storm, 80 roads remained
  6. Page 12 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 12 of 125 Docket No. 11-09-09 Page 8 impassable 5 days following the storm event, and it was a 3-day wait for the first line crew to arrive. She claimed that contracted tree crews waited for CL&P line crews that never showed up. Additionally, she noted that the maximum security prison was two hours away from complete depletion of its generator support system. Id., p. 2943. Moreover, Ms. Llodra indicated that there were significant issues in her town with communication. She spoke of damaged towers, which meant that cell phone conversations were really hampered, and at one point the liaison could not even use her cell phone to talk to the center that was also located in Newtown. Tr. 5/24/12, p. 2959. Ms. Llodra spoke of the lack of truck to truck communication, indicating that crews would end up at the municipal center asking for directions to get to where they were assigned to go. Ms. Llodra noted that the town had 60 or 70 radios that it offered to the CL&P restoral crews so they could talk, but that offer was declined because of security issues. Id., p. 2960. According to Ms. Llodra, the first line crews were not present until the Wednesday following the October Storm. Id., p. 2967. Ms. Llodra spoke very positively of the liaison program. She noted that after the first five days into the second storm event, the liaison had more tools, had more ability to manage the information, and was more clear and confident in her communication with the town. Tr. 5/24/12, p. 2980. Ms. Llodra did not have a growing sense of confidence that they were at a place where there would be a better response if there were another event, but she thought they were getting there. Id., p. 2987. 6. Mr. Rudolph Marconi, First Selectman of Ridgefield Mr. Marconi noted that the Town of Ridgefield (Ridgefield) was assigned a local liaison who worked closely with him. Mr Marconi became frustrated because he knew the liaison was not getting the information he needed. Tr. 5/24/12, p. 2946. Mr. Marconi also testified that there needs to be better mutual aid policies with other outside agencies or power companies. Id. Mr. Marconi testified that when the town got into the make-safe mode it was prepared to respond and to collect the necessary data so that CL&P had the data to respond to and know where the locations were. Mr. Marconi noted that for three years the town has been requesting CL&P to implement a program where either it train local electricians or have union electricians be assigned to town crews to make the roads safe so that the roads could be open. Mr. Marconi advocated a program that allows electricians to assist the highway department in the opening of roads. Id., p. 2951. Mr. Marconi noted that Ridgefield, in the aftermath of the October Storm, received one line crew on the following Monday, that was increased by four by Thursday night. Mr. Marconi claimed that it was not until Friday afternoon, following the the October Storm which was on Saturday, that the town received another 25 trucks. Id., p. 2958. Mr. Marconi also testified that the problem was the unavailability of the crews in-state, which prevented an immediate response to the Storm. Tr. 5/24/12, p. 2968. Mr. Marconi further testified that he wanted to see a financial commitment made to the mutual aid agreements. Id., p. 2983. Lastly, Mr. Marconi felt that the liaison program
  7. Page 13 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 13 of 125 Docket No. 11-09-09 Page 9 was a very good program, and that the liaison needs more authority at the local level. Id., p. 2982. II. CONSULTANT REPORTS A. WITT ASSOCIATES In 2011, the State of Connecticut retained Witt Associates to provide an independent assessment of preparedness, response, and restoration efforts associated with the October Storm. Witt Associates is a public safety and crisis management consulting firm based in Washington D.C. with consultants located throughout the country. As a result of its assessment, Witt Associates produced a report titled, “Connecticut October 2011 Snowstorm Power Restoration Report,” dated December 1, 2011. Excerpts from the Executive Summary of that report are as follows: The northeastern United States was struck by an unusual pre-Halloween snowstorm on October 29, 2011. The wet snow – more than 12 inches in some areas -stuck to the still leaf-laden trees bringing down limbs, branches and, in some cases, full trees. Fallen trees caused substantial damage to power lines, including some transmission lines, and blocked roads. More than 3 million electric utility customers lost power in the region. Eight deaths related to the snowstorm were reported in Connecticut. The snowstorm and power outage resulted in significant economic losses in Connecticut. North Central Connecticut was hit especially hard, challenging the capabilities and coordination of electricity providers and public sector response. Almost 70 percent of CL&P’s 1.2 million customers, lost power. Customers of UI which serves the coastal area, were not hit as hard, with a total of 52,000 of its 350,000 customers affected at some time during the outage. This Power Restoration Report provides an independent assessment of the preparedness, response, and restoration efforts and offers recommendations for how capabilities to address such events can be improved. The October Storm resulted in 809,097 CL&P customers being without power at some time during the 11-day outage; many suffered multiple outages. The duration of the power outage in some of the most heavily impacted areas caused inconvenience and frustration among the public and municipal officials. Community frustration was exacerbated by CL&P’s communications with the general public and state and local officials. The October Storm resulted in the largest restoration effort in CL&P’s history. Despite the length and extent of the service outages, and the effect on customers in the affected service areas, there were successes in CL&P’s power restoration effort. The company’s internal forecast model accurately predicted power would be fully restored by Wednesday, November 9, although an unprecedented army of mutual aid workers from other utilities was required to do so. No serious injuries or deaths were reported associated with the restoration effort. Municipalities reported that power restoration crews, once they arrived in their communities, generally functioned well and efficiently.
  8. Page 14 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 14 of 125 Docket No. 11-09-09 Page 10 Stakeholders also praised the assistance from power company customer service representatives in answering phone lines in a timely fashion, with an average wait time of less than Connecticut October 2011 Snowstorm Power Restoration 45 seconds; this is frequently not the case in such a wide-scale event. CL&P’s recently created Town Liaison program, while not completely successful in its implementation, is recognized as positive in concept. UI outages were smaller in number and in proportion to their total customers. After the October snowstorm, all UI customers were restored by the night of Wednesday, November 2. As noted above, the scope of this expedited high-level review is limited to the restoration effort itself. There are several other factors that impact the scale of outages during a major event including system design, hardening, vegetation management, and regulatory issues. We recommend further review of these and other issues. Witt Associates, Connecticut October 2011 Snowstorm Power Restoration Report, Executive Summary, pp. 1-3. B. TWO STORM PANEL Governor Dannel P. Malloy announced the formation of The State Team Organized for the Review of Management (STORM) of Tropical Storm Irene on September 13, 2011. The eight member panel was charged with the following mission: “a broad, objective evaluation reviewing how Irene was handled in the state both in preparation and recovery, identify areas that can be improved upon and, most importantly, make recommendations for future disaster preparedness and response.” Following the October Storm, the Governor expanded the work of the panel, renamed it The Two Storm Panel, and directed it to report its findings to him by the first week of January, 2012. Excerpts of the Executive Summary of the “Report of the Two Storm Panel” (Two Storm Panel Report) are as follows: Tropical Storm Irene and the October Nor’easter tested Connecticut’s emergency resources in ways that they had not been tested in more than 25 years. In that intervening 25 years, Connecticut’s infrastructure had increased significantly, while the manpower associated with the maintenance and repair of that infrastructure had decreased significantly. The result was that although Connecticut has faced far more significant storms, such as Category 3 hurricanes, both Tropical Storm Irene and the October Nor’easter left record numbers of residents without electricity, communications, heat or reliable supplies of water. The significant impact of these storms has served as a wake-up call to Connecticut. Our state must do more to prevent, plan for, and respond to emergencies and natural disasters. To that end, this Report serves as the beginning of what this Panel hopes will be a robust review and evaluation of Connecticut’s approach to the prevention, planning and mitigation of impacts associated with emergencies and natural disasters that can reasonably be anticipated to impact our State. The Report contains 82 recommendations on a wide variety of topics, with subjects ranging from utility issues
  9. Page 15 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 15 of 125 Docket No. 11-09-09 Page 11 (“utility,” for the purposes of this Report, shall include all infrastructure components, including electric, gas, water, sewer, telephone, cable, television, data and piping infrastructure) to municipal assistance to changes that can be implemented at the State level to improve the State’s readiness for the next emergency. Two Storm Panel Report, Executive Summary, p. 1. C. THE LIBERTY CONSULTING GROUP After initiating the instant docket, the Authority contracted with The Liberty Consulting Group, (Liberty) to act as an extension of the PURA staff in this proceeding, pursuant to §16-18a of the General Statutes of Connecticut (Conn. Gen. Stat.). Liberty’s April 16, 2012 report was entitled, “Report on the Preparation for and Response to the August and October 2011 Storms by The Connecticut Light and Power and The United Illuminating Companies (Liberty Report).” See “Attachment A” to access the complete Liberty Report. Excerpts from its summary section are as follows: According to Liberty the 2011 Storms were significant, and the early snowstorm was unprecedented. Liberty found that CL&P and UI each performed some things well in the preparation for and response to the storms. However, Liberty also found that aspects of both companies’ performance made worse the severity and duration of the storms’ effects. Liberty concluded that the following were beneficial aspects of CL&P’s performance. 1. CL&P’s systems and methods enabled customers to communicate easily with the company during the storms. 2. CL&P has a superior distribution pole specification and groundline inspection program. CL&P has been purchasing one of the more durable types of poles since the mid-1980s. The percentage of reject poles is low. 3. The CL&P district emergency organization provides the framework to support an effective response. In both storms, CL&P opened and staffed the district commands in good time. 4. CL&P proactively communicated with the media, public officials, customers, and the public before, during, and after the storms. 5. CL&P’s emergency plans provide clear expectation of employee involvement in support activities. This is a very important aspect of any successful response effort. 6. The Classification of Service Outage Events in CL&P’s emergency plans provides helpful guidance in determining the amount of required resources. However, Liberty found that CL&P’s storm performance was below average. The most important items in this category are as follows:
  10. Page 16 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 16 of 125 Docket No. 11-09-09 Page 12 1. CL&P’s distribution tree trimming program contributed significantly to the extent of 2011 storm damage and the duration of storm service interruptions. CL&P should institute a four-year, full-cycle trim program, a more aggressive overhang trimming process, and a more aggressive hazard-tree removal program. 2. CL&P could not provide restoration estimates or restoration status to customers on a timely basis. CL&P should pursue the technology enhancements that will facilitate real-time updates of restoration status information into the outage system. It should also develop specific, measurable goals and objectives for improving the accuracy and timeliness of outage related information provided to its constituents. 3. CL&P’s implementation of the Incident Command System (ICS) did not set up the strong, top-down management response that is necessary in reacting to major outages. CL&P should modify its storm management structure, placing more direct authority and responsibility at the System, Area, and Division level. 4. CL&P made a determined effort in acquiring outside resources, but the results were disappointing. CL&P should work with EEI and other Mutual Assistance Groups to improve the present process. 5. CL&P management did not have proper control over the “Cut/Clear, Make Safe” work done with the towns. CL&P should work with the towns, other utilities, and emergency agencies to establish specific guidelines as to the work CL&P will do in this effort with the towns. The effect of the storms on UI was not as severe as that experienced by CL&P, primarily because of UI’s smaller and more compact service territory. Liberty concluded that the items listed below were beneficial aspects of UI’s performance. 1. UI well organized its response to the two storms. 2. UI proactively communicated with the media, public officials, customers, and the public before, during, and after the storms. 3. UI managed the alert and mobilization processes well in both storms. 4. UI has an aggressive distribution-pole groundline program. 5. UI used automatic meter reading technologies to communicate with installed meters during the storm to confirm restoration status. The most significant aspects of UI’s performance that require improvement were the following. 1. UI could not handle the large volume of customers trying to communicate with the company during the storm. UI should create a call center storm staffing process to facilitate quick ramp-up of call takers during a large outage. It should redesign its call center technology to improve communications with customers

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026